August 24, 2022
Jackson Lu
167 Di Salvo Ave
San Jose, CA 95128
SUBJECT: TWO STORY PERMIT AND MINOR RESIDENTIAL PERMIT ACTION
LETTER—Application R-2022-024,RM-2022-020
This letter confirms the decision of the Director of Community Development, given on
August 24,2022,approving a Two-Story Permit(R-2022-024)to allow the construction of
a new 4,195 sq. ft. two-story single-family residence with a 574 sq. ft. attached ADU; and
a Minor Residential Permit (file number RM-2022-020) for a 158 sq. ft. rear facing second
story balcony at 10279 S Tantau Ave with the following conditions:
1. APPROVED EXHIBITS
The approval is based on a plan set entitled "Proposed Residential New Construction
for Mrs. Laura Lu 10279 S Tantau Avenue", consisting of 17 plan sheets labeled "Al
through A8, C.0, D1, LO through L5A.3.2, and STR" except as may be amended by
conditions in this resolution.
2. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
building plans.
3. ACCURACY OF THE PROTECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations,building setbacks,property
size, building square footage, any relevant easements and/or construction records.
Any misrepresentation of property data may invalidate this approval and may require
additional review.
4. COMPLIANCE WITH PUBLIC WORKS CONFIRMATION FORM
The project shall comply with the requirements indicated on the Public Works
Confirmation form dated June 14, 2022, including, but not limited to, dedications,
easements, off-site improvements, undergrounding of utilities, all necessary
agreements, and utility installations/relocations as deemed necessary by the Director
10279 S Tantau Ave Page 2 of 7
R-2022-024,RM-2022-020
of Public Works and required for public health and safety. The Public Works
Confirmation is a preliminary review and is not an exhaustive review of the subject
development. Additional requirements may be established and implemented during
the construction permitting process.The project construction plans shall address these
requirements with the construction permit submittal, and all required improvements
shall be completed to the satisfaction of the Director of Public Works prior to final
occupancy.
5. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
6. FRONT YARD TREE
The applicant shall indicate on site and landscape plans the location of a front yard
tree to be located within the front yard setback area in order to screen the massing of
the second story. The front yard tree shall be a minimum 24-inch box and 6 feet
planted height and otherwise be consistent with the City's requirements.
7. FRONT YARD TREE COVENANT
The property owner shall record a covenant on this property with the Santa Clara
County Recorder's Office that requires the retention and maintenance of the required
front yard tree. The precise language will be subject to approval by the Director of
Community Development. Proof of recordation must be submitted to the Community
Development Department prior to final occupancy of the residence.
8. PRIVACY PLANTING
The final privacy planting plan shall be reviewed and approved by the Planning
Division prior to issuance of building permits.The variety,size,and planting distance
shall be consistent with the City's requirements.
9. PRIVACY PROTECTION COVENANT
The property owner shall record a covenant on this property to inform future property
owners of the privacy protection measures and tree protection requirements
consistent with the R-1 Ordinance,for all windows with views into neighboring yards
and a sill height that is 5 feet or less from the second story finished floor. The precise
language will be subject to approval by the Director of Community Development.
Proof of recordation must be submitted to the Community Development Department
prior to final occupancy of the residence.
10. LANDSCAPE PROJECT SUBMITTAL
Prior to issuance of building permits, the applicant shall submit a full Landscape
Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape
Ordinance,for projects with landscape area 500 square feet or more or elect to submit
a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects
10279 S Tantau Ave Page 3 of 7
R-2022-024,RM-2022-020
with landscape area between 500 square feet and 2,500 square feet. The Landscape
Documentation Package or Prescriptive Compliance Application shall be reviewed
and approved to the satisfaction of the Director of Community Development prior to
issuance of building permits, and additional requirements per sections 14.15.040 D, E,
F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved
prior to final inspections.
11. EXTERIOR BUILDING MATERIALS/TREATMENTS
The final building exterior plan shall closely resemble the details shown on the original
approved plans. Final building exterior treatment plan (including but not limited to
details on exterior color,materials, architectural treatments, doors,windows,lighting
fixtures, and/or embellishments) shall be reviewed and approved by the Director of
Community Development prior to issuance of building permits to ensure quality and
consistency. Any exterior changes determined to be substantial by the Director of
Community Development shall either require a modification to this permit or a new
permit based on the extent of the change.
12. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum extent
feasible subject to the Building Official. The applicant shall provide evidence that
materials were recycled prior to issuance of final demolition permits.
13. DUST CONTROL
The following construction practices shall be implemented during all phases of
construction for the proposed project to prevent visible dust emissions from leaving
the site:
a) Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles,
graded areas, and unpaved access roads) at least twice daily and more often
during windy periods to prevent visible dust from leaving the site; active areas
adjacent to windy periods; active areas adjacent to existing land uses shall be
kept damp at all times, or shall be treated with non-toxic stabilizers or dust
palliatives.
b) All haul trucks transporting soil, sand, or other loose material off-site shall be
covered.
c) All visible mud or dirt track-out onto adjacent public roads shall be removed
using wet power vacuum street sweepers at least once per day. The use of dry
power sweeping is prohibited.
d) All vehicle speeds on unpaved roads shall be limited to 15 mph.
e) All roadways,driveways, and sidewalks to be paved shall be completed as soon
as possible. Building pads shall be laid as soon as possible after grading unless
seeding or soil binders are used.
f) Idling times shall be minimized either by shutting equipment off when not in
use or reducing the maximum idling time to 5 minutes (as required by the
California airborne toxics control measure Title 13, Section 2485 of California
10279 S Tantau Ave Page 4 of 7
R-2022-024,RM-2022-020
Code of Regulations [CCR]). Clear signage shall be provided for construction
workers at all access points.
g) All construction equipment shall be maintained and properly tuned in
accordance with manufacturer's specifications. All equipment shall be checked
by a certified mechanic and determined to be running in proper condition prior
to operation.
h) Post a publicly visible sign with the telephone number and person to contact at
the Lead Agency regarding dust complaints.This person shall respond and take
corrective action within 48 hours. The Air District's phone number shall also be
visible to ensure compliance with applicable regulations.
i) The applicant shall incorporate the City's construction best management
practices into the building permit plan set.
14. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a. All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b. Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c. Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
d. Construction activities shall be limited to Monday through Friday,7 a.m.to 8 p.m.
and Saturday and Sunday,9 a.m.to 6 p.m. Construction activities are not allowed
on holidays as defined in Chapter 10.48 of the Municipal Code. Night time
construction is allowed if compliant with nighttime standards of Section 10.48 of
the Cupertino Municipal Code.
e. Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f. The applicant shall be responsible for educating all contractors and subcontractors
of said construction restrictions.
The applicant shall comply with the above grading and construction hours and noise
limit requirements unless otherwise indicated
15. DARK SKY COMPLIANCE
Prior to issuance of Building Permits,the applicant/property owner shall submit final
plans in compliance with the approved lighting plans to comply with development
standards of Cupertino Municipal Code Section 19.102.040 Outdoor Lighting
Requirements. In the event changes are proposed from the approved plans, said
10279 S Tantau Ave Page 5 of 7
R-2022-024,RM-2022-020
changes must be reviewed and approved by the Director of Community Development
or their designee.The applicant shall provide all documentation required to determine
compliance with the Municipal Code.
16. INDEMNIFICATION
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City's choice, and hold harmless
the City, its City Council, and its officers, employees, and agents (collectively, the
"indemnified parties") from and against any liability, claim, action, cause of action,
suit, damages, judgment, lien, levy, or proceeding (collectively referred to as
"proceeding")brought by a third party against one or more of the indemnified parties
or one or more of the indemnified parties and the applicant related to any Ordinance,
Resolution, or action approving the project, the related entitlements, environmental
review documents, finding or determinations, or any other permit or approval
authorized for the project. The indemnification shall include but not be limited to
damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys'
fees, and other costs, liabilities, and expenses incurred in connection with such
proceeding whether incurred by the Applicant, the City, or the parties initiating or
bringing such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys' fees and costs incurred in defense of the litigation. Such attorneys' fees and
costs shall include amounts paid to the City's outside counsel and shall include City
Attorney time and overhead costs and other City staff overhead costs and any costs
directly related to the litigation reasonably incurred by City. The applicant shall
likewise agree to indemnify, defend, and hold harmless the indemnified parties from
and against any damages, attorneys' fees, or costs awards, including attorneys' fees
awarded under Code of Civil Procedure section 1021.5, assessed or awarded against
the indemnified parties. The Applicant shall cooperate with the City to enter a
Reimbursement Agreement to govern any such reimbursement.
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary by
proceedings challenging the project approvals and related environmental review, if
the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
17. NOTICE OF FEES,DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
10279 S Tantau Ave Page 6 of 7
R-2022-024,RM-2022-020
approval period in which you may protest these fees, dedications, reservations, and
other exactions,pursuant to Government Code Section 66020(a),has begun. If you fail
to file a protest within this 90-day period complying with all of the requirements of
Section 66020,you will be legally barred from later challenging such exactions.
Please note that if this permit is not vested within a year,it shall expire on August 24,
2023.
Staff has made all the findings that are required for approval of a Two-Story Permit and
Minor Residential Permit as required and no additional conditions were placed as a
condition for approval by Cupertino's Municipal Code, Chapter 19.28.140 (B).
1. The project is consistent with the Cupertino General Plan, any applicable specific plans,
zoning ordinances and the purposes of this title.
The proposed project is consistent with the General Plan as the project is within the Low-
Density land use area. There are no applicable specific plans that affect the project. The
project has been found to be consistent with the requirements of Cupertino Municipal
Code Chapter 19.28 Single Family(R-1) Residential.
2. The granting of the permit will not result in a condition that is detrimental or injurious to
property improvements in the vicinity, and will not be detrimental to the public health, safety or
welfare.
The granting of the permit will not result in a condition that is detrimental or injurious to
property improvements in the vicinity, and will not be detrimental to the public health,
safety or welfare as the projects is located within the R1-10 (Single Family Residential)
zoning district and will be compatible with the surrounding uses of the neighborhood.
3. The proposed project is harmonious in scale and design with the general neighborhood.
The proposed project is located in a residential area consisting of single-family homes.
The proposed project maintains the single-family home scale found compatible with the
general neighborhood.
5. Adverse visual impacts on adjoining properties have been reasonably mitigated.
Any potential adverse impacts on adjoining properties have been reasonably mitigated
through installation of a front-yard tree and privacy plantings along the side and rear
property lines as required by the R-1 Ordinance that have sill heights of 5-feet or less and
to second story balcony.
Also, please note that an appeal of this decision can be made within fourteen (14)
calendar days from the date of this letter(Wednesday, September 7,2022 at 5:00 p.m.).
If this happens, you will be notified of a public hearing, which will be scheduled
before the Planning Commission.Please find a copy of the appeal form attached for your
convenience and to ensure your health and safety during the COVID pandemic (also
available online at: www.cul2ertino.org/planningforms.) The completed appeal form and
filing fee must be received by the deadline to appeal and may be submitted in one of the
following ways:
10279 S Tantau Ave Page 7 of 7
R-2022-024,RM-2022-020
1. Preferred:Email the completed form to cityclerk@cupertino.org and call(408)
777-3223 between 7:30AM-5:30PM (M-Th) and 7:30AM-4:30PM(F) to arrange
for payment by credit card.
2. Other options:
a. Mail the completed form and a check in the amount of$344 to Attn: City
Clerk, City of Cupertino, 10300 Torre Avenue, CA 95014.
b. Obtain an appointment to file the appeal by contacting the City Clerk by
email or phone (see contact information above).
Please contact the City Clerk's office for additional guidance and instructions on how to
file.
Sincerely,
/s/
Brianne Harkousha
Associate Planner
City of Cupertino
Enclosures:
Approved Plan Set
CC: Laura Lu, 10279 S Tantau Ave, Cupertino, CA 95014