Loading...
22-060 Service Order #2 Chrisp Company Various Striping Services - PO 2023-426Consultant Chrisp Company 43650 Osgood Rd Signer Name:Signer Email: Phone: Project:Various Striping Services Scope of Work: City Project Management Fiscal/Budget Master Agreement Amount:60,000.00 22,150.00 2,451.50 1,605.00 This Service Order:4,056.50 0.00 33,793.50 Approvals Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature. Master Agreement Amount: $60,000 City of Cupertino MASTER AGREEMENT SERVICE ORDER NO. 2 Master Agreement # : 2022-020 Effective Date: 5/4/2022 Agreement End Date: 6/30/2023 Total Liquidated Encumbrance: Fremont, CA 94539-5631 dmorris@chrispco.com David Morris SCB-Pasadena: Yield Line Install - $645.00 Bubb-McClellan: Relocate Bike Box - $1137.50 McClellan-Byrne-Orange: Grind Stop Bars - $669.00 Orange-McClellan: Crosswalk Install - $1605.00 *Includes mobilization Managing Department: Public Works Project Manager: Marlon Aumentado Total Previously Encumbered: Account No.: 100-88-844-700-702 Traffic Engineering Account No.: 270-90-958-900-905 ST 013-03-03 Master Agreement Unencumbered Amount: Consultant:Date: CIP Manager:Date: City of Cupertino Master Agreement Page 1 of 2 Service Order No. Mar 28, 2023 Mar 28, 2023 City of Cupertino MASTER AGREEMENT SERVICE ORDER NO. City Finance:Date: Management Analyst City of Cupertino Master Agreement Page 2 of 2 Service Order No. Mar 28, 2023 To:Contact:Cupertino, City Of Marlon Aumentado On Call Striping Services 2022-2023 WO# 2Project Name:Bid Number:56479-2 Fax:Cupertino, CA 95014 SANTA CLARA Address:10300 Torre Ave.Phone:(408) 777-3215 Project Location:Santa Clara Co., Cupertino Bid Date:11/29/2022 Total PriceUnit PriceUnitItem DescriptionItem # Estimated Quantity 01 1.00 LS $1,500.00 $1,500.00Mobilization Shall Be Chaged Per Single Or Combined Task/Work Orders Totaling Less Then $5,000.00 Total Price for above Items: $1,500.00 A - McClellan Rd At Bubb Rd 01 2.50 EACH $135.00 $337.50Grind Arrows (Existing Bike Box) 02 67.00 LF $5.00 $335.00Painted Curb (Paint New Bike Box, Including Legend And Outline) (No Paint Markings Item) Total Price for above A - McClellan Rd At Bubb Rd Items: $672.50 B - McClellan Rd At Byrne Ave 01 36.00 LF $3.00 $108.00Grind Lines (Existing STOP Bar) (6" X 2) Total Price for above B - McClellan Rd At Byrne Ave Items: $108.00 C - McClellan Rd At Orange Ave 01 32.00 LF $3.00 $96.00Grind Lines (Existing STOP Bar) (6" X 2) 02 190.00 LF $6.00 $1,140.0012" Solid Yellow (Refresh X-Walk) (95 X 2 For 24") Total Price for above C - McClellan Rd At Orange Ave Items: $1,236.00 D - Stevens Creek Blvd At Pasadena Ave 01 4.00 EACH $45.00 $180.00Legend (Isosceles Triangles - Yeild Limit Line) Total Price for above D - Stevens Creek Blvd At Pasadena Ave Items: $180.00 E - Contingency 01 1.00 LS $360.00 $360.00Contingency 10% (As Per Request) Total Price for above E - Contingency Items: $360.00 Total Bid Price:$4,056.50 Notes: •Removal via Grinding Method Only (Excludes Yellow Hazardous Removal) Unit Prices are based on Minimum $5,000.00 per Task/Work Order $1,500.00 Mobilization Shall be Chaged per Single or Combined Task/Work Orders Totaling Less then $5,000.00 11/29/2022 1:52:16 PM Page 1 of 2 To:Contact:Cupertino, City Of Marlon Aumentado On Call Striping Services 2022-2023 WO# 2Project Name:Bid Number:56479-2 Fax:Cupertino, CA 95014 SANTA CLARA Address:10300 Torre Ave.Phone:(408) 777-3215 Project Location:Santa Clara Co., Cupertino Bid Date:11/29/2022 • · NO RETENTION TO BE TAKEN ON CONTRACTS LESS THAN $5,000.00 ·1 Move- In(s) included. Additional Move- Ins $3,500.00 · Chrisp Company reserves the right to withdraw proposal if written acceptance is not received within 30 days of bid date · Clean, clear and unobstructed access required for Chrisp Co. work · Final PAY QTYS presented by owner MUST be agreed by Chrisp Co. · After receiving contract 10 working days written notice required prior to scheduling of work · EXCLUDE: Special Insurance Requirements,(i.e. Railroad Insurance,______________________) · This quotation excludes Primary Liability Insurance greater than $2,000,000. · This quotation excludes all work associated with the project SWPP and WPCP. · ALL Bid items shall NOT be adjusted or removed without written / or verbal permission. · Retainage percentage on monthly progress payments to be no greater than the percentage retained by the Owner on its payment to the Contractor. If Owner reduces the retainage percentages on payments to the Contractor, the Contractor shall likewise reduce the retainage percentage on payment to Chrisp Company. Full retention to be released no later than thirty, (30) Days after completion of Chrisp Companies work. Excessive or delinquent retainage will be subject to the highest interest rate allowed by law. · Chrisp Company shall be reimbursed the full amount for bonds upon submission to General Contractor. Retention shall not be held from bond reimbursement. · THIS QUOTATION IS BASED ON A STANDARD MONDAY THROUGH FRIDAY WORK WEEK. ADDITIONAL COSTS WILL OCCUR FOR WORK PERFORMED ON WEEKENDS · CHRISP COMPANY WILL USE EXISTING EMPLOYEE POOL TO PERFORM ALL WORK ON THIS PROJECT. IF THERE ARE ANY HIRING GOALS FOR THIS PROJECT THIS WILL BE EXCLUDED · EXCLUDE: ALL Safety Training, Badging, Drug Testing and Orientation (To be paid at time and material Cal-Trans · EXCLUDE: REMOVAL OF USA MARKINGS ACCEPTED: The above prices, specifications and conditions are satisfactory and are hereby accepted. Buyer: Signature: Date of Acceptance: CONFIRMED: Chrisp Company Authorized Signature: Estimator:Aaron Patton (510) 316-1938 apatton@chrispco.com 11/29/2022 1:52:16 PM Page 2 of 2 SO #2 Chrisp Company Various Striping Services Final Audit Report 2023-03-28 Created:2023-03-27 By:Jindy Garfias (jindyg@cupertino.org) Status:Signed Transaction ID:CBJCHBCAABAA47-VpqhCFpOgQwnRxM6Cqtu80uhKnIVs "SO #2 Chrisp Company Various Striping Services" History Document created by Jindy Garfias (jindyg@cupertino.org) 2023-03-27 - 9:01:29 PM GMT Document emailed to David Morris (dmorris@chrispco.com) for signature 2023-03-27 - 9:03:12 PM GMT Email viewed by David Morris (dmorris@chrispco.com) 2023-03-27 - 9:09:00 PM GMT Document e-signed by David Morris (dmorris@chrispco.com) Signature Date: 2023-03-28 - 4:36:09 PM GMT - Time Source: server Document emailed to David Stillman (davids@cupertino.org) for signature 2023-03-28 - 4:36:10 PM GMT Email viewed by David Stillman (davids@cupertino.org) 2023-03-28 - 4:47:35 PM GMT Document e-signed by David Stillman (davids@cupertino.org) Signature Date: 2023-03-28 - 4:48:00 PM GMT - Time Source: server Document emailed to Julia Kinst (juliak@cupertino.org) for signature 2023-03-28 - 4:48:01 PM GMT Document e-signed by Julia Kinst (juliak@cupertino.org) Signature Date: 2023-03-28 - 11:18:02 PM GMT - Time Source: server Agreement completed. 2023-03-28 - 11:18:02 PM GMT Names and email addresses are entered into the Acrobat Sign service by Acrobat Sign users and are unverified unless otherwise noted.