Loading...
15110051InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10104 BYRNE AVE CUPERTINO, CA 95014- 2807 CUPERTINO APN: 357 16 162 PERMIT NO: 15110051 OWNER'S NAME: SILAWATCHARAPOL SIRILAK AND YERGERA OWNER'S PHONE: Not Provided CONTRACTOR: KRIS CONSTRUCTION, 3484 MISSION VIEW DR FREMONT CONTRACTOR PHONE: 408-835-6620 DATE ISSUED 3/17/2023 8:39:10 AM ISSUED BY:VALUATION: $576000 JOB DESCRIPTION CONSTRUCT (N) 2 STORY SFD (3,294 S.F.); COVERED PORCH (120 S.F.) WITH ATTACHED GARAGE (442 S.F.) REV#3 - RELOCATE GAS METER FROM MAIN HOUSE TO ADU - ISSUED 2-19- 19 REV#1 - MOVE WALL BETWEEN KITCHEN AND MUDROOM, CHANGE (2) WINDOWS; CHANGE BATHROOM #2 LAYOUT- ISSUED 12/19/2017 REV #2 - CHANGE CLOSET BEHIND GARAGE; CHANGE MUD ROOM SINK; CHANGE BATHROOMS - ISSUED 12/10/18 REV #4 - additional design of external kitchen exhaust’s vent coverages- APPROVED 12/2/2020 REV #5 - C2 PLANS - APPROVED 12/16/2020 REV #6 - ROOF MATERIAL CHANGE - APPROVED 9/2/2021 INSPECTION TYPE DATE STATUS INSPECTOR Air Conditioner 2018-12-11 Cancelled   EXTERIOR LATH 2018-09-07 Failed   EXTERIOR LATH 2018-09-11 Passed   EXTERIOR SHEAR 2018-03-07 Cancelled   EXTERIOR SHEAR 2018-03-13 Failed   EXTERIOR SHEAR 2018-03-15 Passed   FOUNDATION 2017-11-06 Failed   FOUNDATION 2017-11-06 Failed   FOUNDATION 2017-12-21 Passed   GAS TEST 2019-03-06 Failed   GAS TEST 2019-03-08 Passed   GAS TEST 2019-04-11 Passed   INSULATION 2019-01-04 Passed   INSULATION 2019-01-04 Passed   INTERIOR LATH 2019-02-01 Passed   INTERIOR SHEAR 2018-12-20 Passed   ROOF NAIL 2018-02-27 Partial   ROOF NAIL 2019-04-22 Passed   ROUGH ELECTRICAL 2018-10-24 Failed   ROUGH ELECTRICAL 2018-10-25 Failed   ROUGH ELECTRICAL 2018-10-26 Passed   ROUGH FRAME 2018-11-01 Cancelled   ROUGH FRAME 2018-11-02 Cancelled   ROUGH FRAME 2018-11-02 Cancelled   ROUGH FRAME 2018-12-11 Failed   ROUGH FRAME 2018-12-20 Passed   ROUGH MECHANICAL 2018-10-24 Failed   ROUGH MECHANICAL 2018-10-26 Failed   ROUGH MECHANICAL 2018-12-11 Cancelled   ROUGH MECHANICAL 2018-12-11 Passed   ROUGH PLUMBING 2018-10-24 Failed   ROUGH PLUMBING 2018-10-26 Failed   ROUGH PLUMBING 2018-12-11 Passed   SCRATCH COAT 2018-10-22 Failed   SCRATCH COAT 2018-10-23 Passed   SHEETROCK 2019-01-17 Failed   SHEETROCK 2019-03-06 Partial   SHEETROCK 2019-03-08 Failed   SHEETROCK 2019-03-19 Failed   SHEETROCK 2019-03-25 Passed   SHOWER PAN 2019-01-24 Passed   UNDERFLOOR FRAMING 2017-12-15 Failed   UNDERFLOOR FRAMING 2018-01-03 Cancelled   UNDERFLOOR FRAMING 2018-01-03 Failed   UNDERFLOOR FRAMING 2018-01-05 Passed   UNDERFLOOR INSULATION 2018-11-13 Passed   UNDERFLOOR MECHANICAL 2017-12-15 Failed   UNDERFLOOR MECHANICAL 2018-01-03 Passed   UNDERFLOOR PLUMBING 2017-12-15 Failed   UNDERFLOOR PLUMBING 2018-01-03 Cancelled   UNDERFLOOR PLUMBING 2018-01-03 Passed   UNDERGROUND ELECTRICAL 2019-01-02 Failed   UNDERGROUND ELECTRICAL 2019-01-09 Passed   UNDERGROUND GAS PIPING 2019-01-02 Failed   UNDERGROUND GAS PIPING 2019-01-09 Failed   UNDERGROUND GAS PIPING 2019-03-06 Cancelled   UNDERGROUND GAS PIPING 2019-04-11 Passed   GAS METER RELEASE 2019-09-12 Passed Bob Sabich UNDERGROUND WATER SERVICE 2019-10-10 Cancelled   UNDERGROUND WATER SERVICE 2019-10-14 Passed Antonio Torrez ROUGH FRAME 2019-11-20 Failed Antonio Torrez ROUGH MECHANICAL 2019-11-20 Failed Antonio Torrez ROUGH FRAME 2019-11-25 Cancelled   ROUGH MECHANICAL 2019-11-25 Cancelled   ROUGH FRAME 2019-11-26 Cancelled   FINAL ELECTRICAL 2019-11-26 Cancelled Antonio Torrez FINAL MECHANICAL 2019-11-26 Cancelled Antonio Torrez FINAL PLUMBING 2019-11-26 Cancelled Antonio Torrez FINAL ELECTRICAL 2019-12-23 Failed Paul O'Sullivan FINAL MECHANICAL 2019-12-23 Failed Paul O'Sullivan FINAL PLUMBING 2019-12-23 Failed Paul O'Sullivan FIRE DEPT - FINAL 2020-01-15 Passed Santa Clara County Fire FIRE DEPT - SPRINKLERS - FINAL 2020-01-15 Passed Santa Clara County Fire FINAL ELECTRICAL 2020-03-10 Failed Bob Sabich FINAL MECHANICAL 2020-03-10 Failed Bob Sabich FINAL PLUMBING 2020-03-10 Passed Bob Sabich SHEETROCK 2019-03-25 Scheduled Antonio Torrez SCRATCH COAT 2018-10-23 Scheduled Bob Sabich UNDERGROUND GAS PIPING 2019-01-09 Scheduled Bob Sabich EXTERIOR SHEAR 2018-03-13 Scheduled Gary Stream ROUGH ELECTRICAL Pending Cancelled Paul O'Sullivan EXTERIOR LATH 2018-09-11 Scheduled Antonio Torrez ROUGH MECHANICAL 2018-12-11 Scheduled Bob Sabich FOUNDATION 2017-12-21 Scheduled Gary Stream UNDERFLOOR INSULATION 2018-11-13 Scheduled Bob Sabich SHEETROCK 2019-01-17 Scheduled Bob Sabich ROUGH PLUMBING 2018-12-11 Scheduled Bob Sabich UNDERGROUND GAS PIPING 2019-01-02 Scheduled Bob Sabich UNDERFLOOR PLUMBING 2017-12-15 Scheduled Bob Sabich SHEETROCK 2019-03-19 Scheduled Paul O'Sullivan ROUGH PLUMBING Pending Cancelled Paul O'Sullivan SCRATCH COAT 2018-10-22 Scheduled Bob Sabich SHEETROCK 2019-03-06 Scheduled Bob Sabich ROUGH FRAME 2018-12-20 Scheduled Bob Sabich EXTERIOR SHEAR 2018-03-15 Scheduled Gary Stream SHOWER PAN 2019-01-24 Scheduled Paul O'Sullivan ROUGH MECHANICAL Pending Cancelled Paul O'Sullivan ROUGH PLUMBING 2018-10-24 Scheduled Bob Sabich UNDERFLOOR MECHANICAL 2018-01-03 Scheduled Gary Stream UNDERGROUND GAS PIPING 2019-04-11 Scheduled Bob Sabich ROOF NAIL 2019-04-22 Scheduled Bob Sabich GAS TEST 2019-03-06 Scheduled Bob Sabich ROUGH ELECTRICAL 2018-10-25 Scheduled Bob Sabich UNDERFLOOR PLUMBING 2018-01-03 Scheduled Gary Stream GAS TEST Pending Cancelled Bob Sabich GAS TEST 2019-04-11 Scheduled Bob Sabich UNDERGROUND ELECTRICAL 2019-01-09 Scheduled Bob Sabich INTERIOR SHEAR 2018-12-20 Scheduled Bob Sabich ROUGH MECHANICAL 2018-10-24 Scheduled Bob Sabich UNDERFLOOR MECHANICAL 2017-12-15 Cancelled Bob Sabich ROUGH ELECTRICAL 2018-10-24 Scheduled Bob Sabich FOUNDATION 2017-11-06 Scheduled Gary Stream UNDERGROUND ELECTRICAL 2019-01-02 Scheduled Bob Sabich EXTERIOR LATH Pending Scheduled LARRY SQUARCIA ROUGH FRAME 2018-12-11 Scheduled Bob Sabich SHEETROCK Pending Scheduled Bob Sabich ROOF NAIL 2018-02-27 Scheduled Antonio Torrez EXTERIOR LATH 2021-05-19 Failed Antonio Torrez HOODS 2021-06-03 Cancelled Antonio Torrez ROOF NAIL 2021-06-03 Passed Antonio Torrez PRE-INSPECTION 2021-07-09 Failed Bob Sabich EXTERIOR LATH 2021-09-21 Passed Antonio Torrez PW – DEV SERVICES FINAL 2022-10-26 Passed Kevin Rieden FINAL PLANNING 2022-10-31 Passed Gian Martire FINAL BUILDING 2023-03-10 Rescheduled   FINAL ELECTRICAL 2023-03-10 Rescheduled   FINAL MECHANICAL 2023-03-10 Rescheduled   FINAL BUILDING 2023-03-17 Passed Antonio Torrez FINAL ELECTRICAL 2023-03-17 Passed Antonio Torrez FINAL MECHANICAL 2023-03-17 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.