15110051InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10104 BYRNE AVE CUPERTINO, CA 95014-
2807 CUPERTINO APN: 357 16 162 PERMIT NO: 15110051
OWNER'S NAME: SILAWATCHARAPOL SIRILAK AND YERGERA OWNER'S PHONE: Not Provided
CONTRACTOR: KRIS CONSTRUCTION, 3484 MISSION VIEW DR FREMONT CONTRACTOR PHONE: 408-835-6620
DATE ISSUED 3/17/2023 8:39:10 AM ISSUED BY:VALUATION: $576000
JOB DESCRIPTION
CONSTRUCT (N) 2 STORY SFD (3,294 S.F.); COVERED PORCH (120 S.F.) WITH ATTACHED GARAGE (442 S.F.) REV#3 - RELOCATE GAS METER FROM MAIN HOUSE TO ADU - ISSUED 2-19-
19 REV#1 - MOVE WALL BETWEEN KITCHEN AND MUDROOM, CHANGE (2) WINDOWS; CHANGE BATHROOM #2 LAYOUT- ISSUED 12/19/2017 REV #2 - CHANGE CLOSET BEHIND
GARAGE; CHANGE MUD ROOM SINK; CHANGE BATHROOMS - ISSUED 12/10/18 REV #4 - additional design of external kitchen exhaust’s vent coverages- APPROVED 12/2/2020
REV #5 - C2 PLANS - APPROVED 12/16/2020 REV #6 - ROOF MATERIAL CHANGE - APPROVED 9/2/2021
INSPECTION TYPE DATE STATUS INSPECTOR
Air Conditioner 2018-12-11 Cancelled
EXTERIOR LATH 2018-09-07 Failed
EXTERIOR LATH 2018-09-11 Passed
EXTERIOR SHEAR 2018-03-07 Cancelled
EXTERIOR SHEAR 2018-03-13 Failed
EXTERIOR SHEAR 2018-03-15 Passed
FOUNDATION 2017-11-06 Failed
FOUNDATION 2017-11-06 Failed
FOUNDATION 2017-12-21 Passed
GAS TEST 2019-03-06 Failed
GAS TEST 2019-03-08 Passed
GAS TEST 2019-04-11 Passed
INSULATION 2019-01-04 Passed
INSULATION 2019-01-04 Passed
INTERIOR LATH 2019-02-01 Passed
INTERIOR SHEAR 2018-12-20 Passed
ROOF NAIL 2018-02-27 Partial
ROOF NAIL 2019-04-22 Passed
ROUGH ELECTRICAL 2018-10-24 Failed
ROUGH ELECTRICAL 2018-10-25 Failed
ROUGH ELECTRICAL 2018-10-26 Passed
ROUGH FRAME 2018-11-01 Cancelled
ROUGH FRAME 2018-11-02 Cancelled
ROUGH FRAME 2018-11-02 Cancelled
ROUGH FRAME 2018-12-11 Failed
ROUGH FRAME 2018-12-20 Passed
ROUGH MECHANICAL 2018-10-24 Failed
ROUGH MECHANICAL 2018-10-26 Failed
ROUGH MECHANICAL 2018-12-11 Cancelled
ROUGH MECHANICAL 2018-12-11 Passed
ROUGH PLUMBING 2018-10-24 Failed
ROUGH PLUMBING 2018-10-26 Failed
ROUGH PLUMBING 2018-12-11 Passed
SCRATCH COAT 2018-10-22 Failed
SCRATCH COAT 2018-10-23 Passed
SHEETROCK 2019-01-17 Failed
SHEETROCK 2019-03-06 Partial
SHEETROCK 2019-03-08 Failed
SHEETROCK 2019-03-19 Failed
SHEETROCK 2019-03-25 Passed
SHOWER PAN 2019-01-24 Passed
UNDERFLOOR FRAMING 2017-12-15 Failed
UNDERFLOOR FRAMING 2018-01-03 Cancelled
UNDERFLOOR FRAMING 2018-01-03 Failed
UNDERFLOOR FRAMING 2018-01-05 Passed
UNDERFLOOR INSULATION 2018-11-13 Passed
UNDERFLOOR MECHANICAL 2017-12-15 Failed
UNDERFLOOR MECHANICAL 2018-01-03 Passed
UNDERFLOOR PLUMBING 2017-12-15 Failed
UNDERFLOOR PLUMBING 2018-01-03 Cancelled
UNDERFLOOR PLUMBING 2018-01-03 Passed
UNDERGROUND ELECTRICAL 2019-01-02 Failed
UNDERGROUND ELECTRICAL 2019-01-09 Passed
UNDERGROUND GAS PIPING 2019-01-02 Failed
UNDERGROUND GAS PIPING 2019-01-09 Failed
UNDERGROUND GAS PIPING 2019-03-06 Cancelled
UNDERGROUND GAS PIPING 2019-04-11 Passed
GAS METER RELEASE 2019-09-12 Passed Bob Sabich
UNDERGROUND WATER SERVICE 2019-10-10 Cancelled
UNDERGROUND WATER SERVICE 2019-10-14 Passed Antonio Torrez
ROUGH FRAME 2019-11-20 Failed Antonio Torrez
ROUGH MECHANICAL 2019-11-20 Failed Antonio Torrez
ROUGH FRAME 2019-11-25 Cancelled
ROUGH MECHANICAL 2019-11-25 Cancelled
ROUGH FRAME 2019-11-26 Cancelled
FINAL ELECTRICAL 2019-11-26 Cancelled Antonio Torrez
FINAL MECHANICAL 2019-11-26 Cancelled Antonio Torrez
FINAL PLUMBING 2019-11-26 Cancelled Antonio Torrez
FINAL ELECTRICAL 2019-12-23 Failed Paul O'Sullivan
FINAL MECHANICAL 2019-12-23 Failed Paul O'Sullivan
FINAL PLUMBING 2019-12-23 Failed Paul O'Sullivan
FIRE DEPT - FINAL 2020-01-15 Passed Santa Clara County Fire
FIRE DEPT - SPRINKLERS - FINAL 2020-01-15 Passed Santa Clara County Fire
FINAL ELECTRICAL 2020-03-10 Failed Bob Sabich
FINAL MECHANICAL 2020-03-10 Failed Bob Sabich
FINAL PLUMBING 2020-03-10 Passed Bob Sabich
SHEETROCK 2019-03-25 Scheduled Antonio Torrez
SCRATCH COAT 2018-10-23 Scheduled Bob Sabich
UNDERGROUND GAS PIPING 2019-01-09 Scheduled Bob Sabich
EXTERIOR SHEAR 2018-03-13 Scheduled Gary Stream
ROUGH ELECTRICAL Pending Cancelled Paul O'Sullivan
EXTERIOR LATH 2018-09-11 Scheduled Antonio Torrez
ROUGH MECHANICAL 2018-12-11 Scheduled Bob Sabich
FOUNDATION 2017-12-21 Scheduled Gary Stream
UNDERFLOOR INSULATION 2018-11-13 Scheduled Bob Sabich
SHEETROCK 2019-01-17 Scheduled Bob Sabich
ROUGH PLUMBING 2018-12-11 Scheduled Bob Sabich
UNDERGROUND GAS PIPING 2019-01-02 Scheduled Bob Sabich
UNDERFLOOR PLUMBING 2017-12-15 Scheduled Bob Sabich
SHEETROCK 2019-03-19 Scheduled Paul O'Sullivan
ROUGH PLUMBING Pending Cancelled Paul O'Sullivan
SCRATCH COAT 2018-10-22 Scheduled Bob Sabich
SHEETROCK 2019-03-06 Scheduled Bob Sabich
ROUGH FRAME 2018-12-20 Scheduled Bob Sabich
EXTERIOR SHEAR 2018-03-15 Scheduled Gary Stream
SHOWER PAN 2019-01-24 Scheduled Paul O'Sullivan
ROUGH MECHANICAL Pending Cancelled Paul O'Sullivan
ROUGH PLUMBING 2018-10-24 Scheduled Bob Sabich
UNDERFLOOR MECHANICAL 2018-01-03 Scheduled Gary Stream
UNDERGROUND GAS PIPING 2019-04-11 Scheduled Bob Sabich
ROOF NAIL 2019-04-22 Scheduled Bob Sabich
GAS TEST 2019-03-06 Scheduled Bob Sabich
ROUGH ELECTRICAL 2018-10-25 Scheduled Bob Sabich
UNDERFLOOR PLUMBING 2018-01-03 Scheduled Gary Stream
GAS TEST Pending Cancelled Bob Sabich
GAS TEST 2019-04-11 Scheduled Bob Sabich
UNDERGROUND ELECTRICAL 2019-01-09 Scheduled Bob Sabich
INTERIOR SHEAR 2018-12-20 Scheduled Bob Sabich
ROUGH MECHANICAL 2018-10-24 Scheduled Bob Sabich
UNDERFLOOR MECHANICAL 2017-12-15 Cancelled Bob Sabich
ROUGH ELECTRICAL 2018-10-24 Scheduled Bob Sabich
FOUNDATION 2017-11-06 Scheduled Gary Stream
UNDERGROUND ELECTRICAL 2019-01-02 Scheduled Bob Sabich
EXTERIOR LATH Pending Scheduled LARRY SQUARCIA
ROUGH FRAME 2018-12-11 Scheduled Bob Sabich
SHEETROCK Pending Scheduled Bob Sabich
ROOF NAIL 2018-02-27 Scheduled Antonio Torrez
EXTERIOR LATH 2021-05-19 Failed Antonio Torrez
HOODS 2021-06-03 Cancelled Antonio Torrez
ROOF NAIL 2021-06-03 Passed Antonio Torrez
PRE-INSPECTION 2021-07-09 Failed Bob Sabich
EXTERIOR LATH 2021-09-21 Passed Antonio Torrez
PW – DEV SERVICES FINAL 2022-10-26 Passed Kevin Rieden
FINAL PLANNING 2022-10-31 Passed Gian Martire
FINAL BUILDING 2023-03-10 Rescheduled
FINAL ELECTRICAL 2023-03-10 Rescheduled
FINAL MECHANICAL 2023-03-10 Rescheduled
FINAL BUILDING 2023-03-17 Passed Antonio Torrez
FINAL ELECTRICAL 2023-03-17 Passed Antonio Torrez
FINAL MECHANICAL 2023-03-17 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.