20-137 Service Order 18 CSG Construction Inspection for Service Center Security Gate CITY OF CUPERTINO
MASTER AGREEMENT CONSULTANT SERVICES
SERVICE ORDER NO.
MASTER AGREEMENT #:MA Date:
Maximum Compensation:
Consultant:Firm Name:
Address:
Contact: Ph:
Email Address:
Project Name:
Description: (simple project description if appropriate)
Attachment A: Includes Description of Project, Scope of Service, Schedule of Performance
and Compensation
City Project Management
Managing Department: Public Works Project Manager:
Fiscal/Budget :
SO Acc't #:PO #:
Project #:Date:
Approvals:
Date:
Date:
Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above
fund for the above contract as estimated and that fund are available as of this date of signature
City Finance:Date:
Consultant:
Manager:
Management Analyst
Master Agreement Maximum Compensation:
Master Agreement Unencumbered Balance:
Total Previously Encumbered to Date:
MA End Date:
Encumbrance this Service Order:
City of Cupertino Master Agreement Service Order
2021-011 10/22/2020
$938,045.00 12/31/2023
CSG Consultants
550 Pilgrim Dr, Foster City, CA 94404
Nurdin Khayata 650.522.2524
Construction Inspection Service Center Security Gate Project
Jimmy Tan
$938,045.00
$723,112.30
$ 18,000.00
$117,142.50
100-87-829 900-905
n/a
TBD
4/4/2023
18
nourdin@scgengr.com
4
4
nourdinkhayata Apr 5, 2023
Apr 5, 2023
Apr 5, 2023
550 Pilgrim Drive
Foster City, CA 94404
phone 650.522.2500
fax 650.522.2599
www.csgengr.com
550 Pilgrim Drive, Foster City, CA 94404
phone (650) 522-2500 | fax (650) 522-2599 | www.csgengr.com
March 30, 2023
Jimmy Tan
Assistant Public Works Director - Operations
City of Cupertino
10300 Torre Avenue
Cupertino, CA 95014
Re: Construction Inspection – Service Center Security Gate
CSG Consultants, Inc. (CSG) is pleased to present this proposal to the City of Cupertino (City) to provide
construction inspection services for the above referenced project.
SCOPE OF WORK
The project involves demolition, loop installation and resurfacing work at at 10555 Mary Avenue. The City
will provide the management for the project and is seeking inspection services.
STAFFING
Providing inspection services will be Jim Mazzone. Jim brings over 30 years of public works inspection
experience, including previously serving as public works inspector for the City of Santa Clara.
FEE
We are estimating 10 working days for this project. CSG will provide full time inspection, totaling 80 hours.
Additional cost is identified for material testing services. This estimate assumes no overtime or weekend work.
We look forward to working with the City of Cupertino. If you have any questions, please contact me at 650
522-2524.
Sincerely,
Nourdin Khayata
Vice President, Construction Management
Employee Hourly
Rate
Working
Days
Hours per
Day Total Hours Cost
Jim Mazzone
Inspector $175 10 8 80 $14,000
Material Testing
Services $4,000
TOTAL COST $18,000
Jim
EDUCATION
Bachelor of Science, Civil Engineering
University of Lowell
Lowell, MA
Mazzone
Senior Construction Inspector
Mr. Mazzone has over 33 years of public sector experience in the fields of construction
inspection, construction management, and project management. Prior to joining CSG, Mr.
Mazzone was a Public Works Inspector for the City of Santa Clara. This role allowed him to
manage and inspection large and small-scale public improvement projects.
The variety of projects Jim has worked on include paving and grading, pavement marking
and striping, sewer and storm drain installation, ADA ramp construction, traffic signal and
traffic signal interconnect construction, management of highway heavy constriction,
including cast-in-place pre-stressed concrete bridges, underground, earthwork, grading
and paving and pile driving.
RELEVANT EXPERIENCE
2020 Pavement Rehabilitation Project | City of Daly City, CA
Mr. Mazzone served as the primary construction inspector for this federally funded pavement
rehabilitation project. The scope involved the removal and replacement of hot mix asphalt, dig
out repairs, FDR treatment method, signage, and striping. The project also involved ADA curb
ramp upgrades, sidewalk and C & G replacements, and utility adjustments.
Edgewater Boulevard Pavement Rehabilitation Project | City of Foster City, CA
Mr. Mazzone served as the construction inspector for this federally funded pavement
rehabilitation project. The scope involved the removal and replacement of hot mix asphalt with
dig out repairs and striping which incorporated buffered bike lanes and bicycle facility markings.
The project also included 20 ADA ramps upgrades, sidewalk replacement, and utility
adjustments.
2019 Pavement Rehabilitation Project | Town of Los Altos Hills, CA
As a construction inspector for this pavement project, Mr. Mazzone inspected a combination of
several pavement rehabilitation methods including slurry seal, digouts, 2,235 tons of 1.5” AC
overlay, and 1,184 tons of 2” AC. Traffic control and coordination with residents were critical
elements to the success of this project.
Public Works Inspector | City of Santa Clara, CA
Mr. Mazzone served as a public works inspector for the City of 6 years. During this time he
inspected numerous capital improvement and private development projects which included
roadway, sewer, and waterline improvements. The following is a sample of the projects on which
Mr. Mazzone has managed:
• 2018 Pavement Surface Treatment Project: Project Cost $4.7 million, included 13,500
tons of deep lift AC, 315,000 SY of slurry seal, 147,000 SY of rubberized chip seal, 170
ADA ramps, 70 traffic loops and all associated striping and signage
• Graham Neighborhood Rebuild: Reconstruction of approximately 4000 LF of
neighborhood road and sidewalk
• San Thomas Creek Trail on Street Enhancement Project: Project included AC, slurry
seal, green colored bicycle lane Thermoplastic, and associated signage and striping
• Tasman Bicycle Lane Improvements: Project Cost $512,000. Project included slurry
seal, and all associated striping and signage
• Mission College Bike Lane: Project Cost $415,000. Project included AC deep lift repair,
slurry seal and striping
• 2015-2016 curb ramp project: Project included 72 curb ramps
• 2016-2017 curb ramp project: Project included 50 curb ramps
• 2018 Pavement Surface Treatment Project: Project included 170 Ramps
Service Order 18 CSG Construction Inspection
for Service Center Security Gate
Final Audit Report 2023-04-05
Created:2023-04-05
By:Julia Kinst (juliak@cupertino.org)
Status:Signed
Transaction ID:CBJCHBCAABAA3Evb7vtRQ65f9oTYxA9AV0YXs5KmM6Uq
"Service Order 18 CSG Construction Inspection for Service Cent
er Security Gate" History
Document created by Julia Kinst (juliak@cupertino.org)
2023-04-05 - 0:16:58 AM GMT- IP address: 64.165.34.3
Document emailed to nourdin@csgengr.com for signature
2023-04-05 - 0:18:18 AM GMT
Email viewed by nourdin@csgengr.com
2023-04-05 - 4:31:22 PM GMT- IP address: 104.28.124.105
Signer nourdin@csgengr.com entered name at signing as nourdinkhayata
2023-04-05 - 4:45:40 PM GMT- IP address: 73.15.55.198
Document e-signed by nourdinkhayata (nourdin@csgengr.com)
Signature Date: 2023-04-05 - 4:45:42 PM GMT - Time Source: server- IP address: 73.15.55.198
Document emailed to Jimmy Tan, P.E. (jimmyt@cupertino.org) for signature
2023-04-05 - 4:45:43 PM GMT
Email viewed by Jimmy Tan, P.E. (jimmyt@cupertino.org)
2023-04-05 - 6:07:58 PM GMT- IP address: 146.75.154.0
Document e-signed by Jimmy Tan, P.E. (jimmyt@cupertino.org)
Signature Date: 2023-04-05 - 7:07:30 PM GMT - Time Source: server- IP address: 76.210.7.77
Document emailed to Julia Kinst (juliak@cupertino.org) for signature
2023-04-05 - 7:07:32 PM GMT
Document e-signed by Julia Kinst (juliak@cupertino.org)
Signature Date: 2023-04-05 - 8:02:45 PM GMT - Time Source: server- IP address: 64.165.34.3
Agreement completed.