Loading...
23-074 Service Order #1 dated 7-7-23 ATC for City Hall Cooling Tower Repair - 2024-013 CITY OF CUPERTINO MASTER AGREEMENT CONSULTANT SERVICES SERVICE ORDER NO. MASTER AGREEMENT #:MA Date: Maximum Compensation: Consultant:Firm Name: Address: Contact: Ph: Email Address: Project Name: Description: (simple project description if appropriate) Attachment A: Includes Description of Project, Scope of Service, Schedule of Performance and Compensation City Project Management Managing Department: Public Works Project Manager: Fiscal/Budget : SO Acc't #:PO #: Project #:Date: Approvals: Date: Date: Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature City Finance:Date: Consultant: Manager: Management Analyst Master Agreement Maximum Compensation: Master Agreement Unencumbered Balance: Total Previously Encumbered to Date: MA End Date: Encumbrance this Service Order: City of Cupertino Master Agreement Service Order Cobblestone #761 7/7/2023 $60,000.00 6/30/2025 Air Treatment Corportation 3213 Ramos Circle, Sacramento CA, 95827 Tony Smith 916.362.4678 City Hall Cooling Tower Repair JImmy Tan $60,000.00 -0- $10,311.60 $49,688.40 100-87-827 700-702 n/a tbd 7/7/2023 1 tsmith@airtreatment.com 4 4 Anthony E Smith Jul 7, 2023 Jul 7, 2023 Jul 7, 2023 www.airtreatment.com Air Treatment Corp – 640 N. Puente St. Brea, CA 92821 Page 1 of 3 PROPOSAL To: Cupertino Dept. of Public Works Date: 07/05/2023 Attention: Jimmy Tan, Operations Proposal # JK23-062 From: Jay Kingston Revision: Project Name: Cooling Tower City Hall We are pleased to submit the following proposal for your consideration on the refurbishment of your existing Baltimore Aircoil Company cooling tower, model number VXT-55, located at your facility in Cupertino, CA. The scope of work is as follows: Scope of Work – Mechanical 1) Set-up. 2) Remove the fan screen and set aside for re-installation. 3) Remove the fan rings and set aside for re-installation. 4) Remove the fan shaft, fan wheels, bearings, bushings sheaves and belts. 5) Install a new OEM fan shaft, fan wheels, bearings, bushing, belts and aftermarket sheave. 6) Re-install the fan rings and fan screens. 7) Clean up the site and check the operation of the tower. Total Price for Labor and Material for One (1) Tower $10,311.60 Please Note: • Freight is FOB Factory (freight allowed to first destination) • Taxes are included in this proposal. • Price is valid 10 days from date on proposal. • Lead time is up to 1 week after receipt of order. • Pricing is based on a standard M – F work week. • Should there be a cancellation after material is ordered, there will be a 100% re-stocking fee. • Disposal bins, if required, are not included and are the responsibility of the customer. • Pricing based on the unit being accessible. • Permits & Bonds, if required, are not included in this proposal. • 110Vac power to be supplied by customer. • See attached page for remainder of quotation terms and conditions. Air Treatment Field Personnel Safety/Training: All tower repairs will be performed or supervised by Air Treatment’s specialized field staff. Our crew has received the most factory and safety training of any cooling tower repair company in California. Our field crews have participated in the following safety and repair/service trainings classes. Safety: • OSHA 10/30 as required • Confined Space Access class • Fall Protection Class • Weekly Tailgate safety meeting Service Training: • Crew members receive extensive hands-on assembly line experience at the BAC factory plant in Madera, CA. www.airtreatment.com Air Treatment Corp – 640 N. Puente St. Brea, CA 92821 Page 2 of 3 Field Operation: • Pre-site inspection before the beginning of every project. • Each Air Treatment Crew operates out of custom designed work truck equipped with all necessary tools and materials. Thank you for the opportunity to offer the equipment and services listed above. We look forward to working with you on this project. If you should require additional information, please do not hesitate to call. Sincerely, Jay Kingston Jay Kingston Aftermarket Sales AIR TREATMENT CORPORATION | 3213 Ramos Circle, Sacramento, CA 95827 Cell: 415.827.7717 | Office: 916.362.4678 jkingston@airtreatment.com | www.airtreatment.com Service Order 1 ATC for City Hall Cooling Tower Repair Final Audit Report 2023-07-07 Created:2023-07-07 By:Julia Kinst (juliak@cupertino.org) Status:Signed Transaction ID:CBJCHBCAABAACaOJ9vFJsCrkXYpmd05Abh7hX_uJuypl "Service Order 1 ATC for City Hall Cooling Tower Repair" Histor y Document created by Julia Kinst (juliak@cupertino.org) 2023-07-07 - 5:38:41 PM GMT- IP address: 98.97.58.57 Document emailed to tsmith@airtreatment.com for signature 2023-07-07 - 5:39:33 PM GMT Email viewed by tsmith@airtreatment.com 2023-07-07 - 5:50:27 PM GMT- IP address: 72.207.80.235 Signer tsmith@airtreatment.com entered name at signing as Anthony E Smith 2023-07-07 - 5:54:04 PM GMT- IP address: 72.207.80.235 Document e-signed by Anthony E Smith (tsmith@airtreatment.com) Signature Date: 2023-07-07 - 5:54:06 PM GMT - Time Source: server- IP address: 72.207.80.235 Document emailed to Jimmy Tan (jimmyt@cupertino.org) for signature 2023-07-07 - 5:54:07 PM GMT Email viewed by Jimmy Tan (jimmyt@cupertino.org) 2023-07-07 - 6:42:15 PM GMT- IP address: 104.47.73.254 Document e-signed by Jimmy Tan (jimmyt@cupertino.org) Signature Date: 2023-07-07 - 6:43:23 PM GMT - Time Source: server- IP address: 64.165.34.3 Document emailed to Julia Kinst (juliak@cupertino.org) for signature 2023-07-07 - 6:43:25 PM GMT Document e-signed by Julia Kinst (juliak@cupertino.org) Signature Date: 2023-07-07 - 6:50:14 PM GMT - Time Source: server- IP address: 98.97.58.57 Agreement completed. 2023-07-07 - 6:50:14 PM GMT