Loading...
CC Resolution No. 23-065 establishing a list of projects proposed to be funded by $1,496,963 of SB 1 revenues, estimated to be received in FY 2023-2024 RESOLUTION NO.  23‐065    A RESOLUTION OF THE CUPERTINO CITY COUNCIL   ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2023‐24 FUNDED BY  SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017      WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of  2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into  law by the Governor in April 2017 to address the significant multi‐modal  transportation funding shortfalls statewide; and     WHEREAS, SB 1 includes accountability and transparency provisions that  will ensure the residents of our City are aware of the projects proposed for funding  in our community and which projects have been completed each fiscal year; and     WHEREAS, the City must adopt by resolution a list of projects proposed to  receive fiscal year funding from the Road Maintenance and Rehabilitation Account  (RMRA), created by SB 1, which must include a description and the location of  each proposed project, a proposed schedule for the project’s completion, and the  estimated useful life of the improvement; and     WHEREAS, the City will receive an estimate $1,496,963 in RMRA funding  in Fiscal Year 2023‐24 from SB 1; and      WHEREAS, This is the sixth year in which the City is receiving SB1 funding  and will enable the City to continue essential road maintenance and rehabilitation  projects, safety improvements, repairing and replacing aging bridges, and  increasing access and mobility options for the traveling public that would not have  otherwise been possible without SB 1; and     WHEREAS, the City uses a Pavement Management System to develop the  SB1 project lists to ensure revenues are being used on the most high priority and  cost effective projects; and     WHEREAS, the funding from SB 1 will help the City maintain and  rehabilitate multiple streets/roads, improve safety at one signalized intersection,  and complete additional projects of similar nature in the future; and     Resolution No. 23‐065  Page 2          WHEREAS, the 2020 California Statewide Local Streets and Roads Needs  Assessment found the City streets and roads are in “good” condition and this  revenue will help us maintain the overall quality of our road system; and     WHEREAS, the SB 1 project list and overall investment in our local streets  and roads infrastructure with focus on basic maintenance and safety, and  investing in complete streets infrastructure, will have significant benefits citywide.      NOW, THEREFORE, BE IT RESOLVED, ORDERED AND FOUND by the  City Council of the City of Cupertino, State of California as follows:      1.  The forgoing recitals are true and correct.    2. The following list of newly proposed projects will be funded in‐part or  solely with FY 2023‐24 Road Maintenance and Rehabilitation Account  revenues.     Project Title: 2024 Pavement Maintenance Phase 1  Project Description:  Pavement Rehabilitation project design and scope  development including asphalt overlay and patch repairs.  Project Location:  City of Cupertino / Various Streets  Project Phase:  Pre‐Construction   Project Schedule: July 2023 – August 2024  Estimated Useful life:  15 Years    Project Title: 2024 Pavement Maintenance Phase 2  Project Description:  Pavement Preservation project design and scope  development including crack seal, slurry seal and fog seal.  Project location: City of Cupertino / Various Streets  Project Phase: Pre‐Construction   Project Schedule: July 2023‐October 2024   Estimated Project Useful Life:  2 to 7 years.     Project Title:  McClellan Road Separated Bike Corridor:  Phase 3 Intersection  Improvements  Project Description:  Improves bicycle and pedestrian safety by realigning  the intersection and reconfiguring the vehicle movements.   Resolution No. 23‐065  Page 3         Project Location. McClellan Rd at De Anza Blvd  Project Schedule – October 2023 – June 2024  Estimated Project Useful Life: 30 years    PASSED AND ADOPTED at a regular meeting of the City Council of the City of  Cupertino this 6th day of June 2023, by the following vote:    Members of the City Council    AYES:  Wei, Mohan, Chao, Fruen, Moore  NOES: None  ABSENT: None   ABSTAIN: None      SIGNED:       ________  Hung Wei, Mayor  City of Cupertino         ________________________   Date  ATTEST:        ________  Kirsten Squarcia, City Clerk           ________________________   Date    8/1/23 8/1/23