Loading...
AH Resolution No. 136 (R-2021-014, R-2021-015) - Signed CITY OF CUPERTINO 10300 Torre Avenue Cupertino,California 95014 RESOLUTION NO. 136 A RESOLUTION OF THE ADMINISTRATIVE HEARING OFFICER OF THE CITY OF CUPERTINO APPROVING A TWO TWO-STORY PERMITS TO ALLOW TWO NEW TWO-STORY HOMES WITH ATTACHED ADUS LOCATED AT 7752 ORION LANE (APN: 36218 008) SECTION L PROJECT DESCRIPTION Application No.: R-2021-014 and R-2021-015 Applicant: Aditi Mukherjee Location: 7752 Orion Lane;APN#36218 008 SECTION 11: FINDINGS FOR A TWO-STORY PERMIT: WHEREAS, the City of Cupertino received applications for two Two Story Permits to allow the construction of a two new two story homes of 3,373 and 3,374 square feet, respectively with an attached accessory dwelling unit of 749 square feet each;and WHEREAS, the project is determined to be categorically exempt from the California Environmental Quality Act(CEQA) pursuant to Section 15332 of CEQA Guidelines; and WHEREAS,on February 23,2023,the Administrative Hearing Officer held a duly noticed public hearing to receive staff's presentation and public testimony, and to consider the information contained in all staff reports,other pertinent documents, and all written and oral statements received prior to and at the public hearing; and WHEREAS,the applicant has met the burden of proof required to support the application for a Tentative Map;and WHEREAS, the Administrative Hearing Officer finds as follows with regard to these applications: 1. The project is consistent with the Cupertino General Plan, any applicable specific plans,zoning ordinance, and the purposes of the R-1 Ordinance;and The proposed project is consistent with the General Plan as the project is within the Law Density land use area. There are no applicable specific plans that affect the project. The project has been found to be consistent with the requirements of Cupertino Municipal Code Chapter 19.28 Single Family (R-1) Residential. 2. The granting of the permit will not result in a condition that is detrimental or injurious to property or improvements in the vicinity, and will not be detrimental to the public health,safety,or welfare;and The granting of the permit will not result in a condition that is detrimental or injurious to property improvements in the vicinity,and will not be detrimental to the public health,safety or welfare as the project is located within the RI-6 (Single Family Residential) zoning district, and will be compatible with the surrounding uses of the neighborhood. The project meets the building development regulations of the R-1 Ordinance and complies with the privacy protection measures to ensure that visual impacts to adjacent neighbors are mitigated. 3. The project is harmonious in scale and design with the general neighborhood;and The proposed project is located in a residential area consisting of single-family homes. The subject neighborhood contains a mix of single-story and two-story homes, making the proposed project compatible with the neighborhood. The proposed six two-story residences are comparable in size to the existing residences in the surrounding area and complies with the R-I Ordinance regulations for floor area ratio.Additionally, the project complies with all other development regulations for R1-6 zoned properties regarding mass and bulk, including, but not limited to,first floor building envelope, minimum setback regulations, and building height limitations. 4. Adverse visual impacts on adjoining properties have been reasonably mitigated. Any potential adverse visual impacts on adjoining properties have been reasonably mitigated through adherence to the setback requirements and privacy protection measures of the R-I Ordinance. The R-1 Ordinance allows property owners the ability to construct second-story windows and balconies as Zang as privacy protection trees andlor shrubs are planted as required by the ordinance. The project complies with the privacy screening requirements of the R-I Ordinance by providing privacy screening plantings for the second-story balcony and second-story windows with a sill height below 5 feet along the property lines for each lot that proposes these window sizes. Per the R-I Ordinance, the objective of privacy protection plantings is to provide substantial screening within three years of planting. Privacy protection plantings are considered Protected Trees under the City's Municipal Code (Chapter 14.18) and are recorded as such with a covenant against the property to inform current and future property owners about their protected status. Protected trees are not permitted to be removed zoithont obtaining a tree removal permit and providing replacement plantings. NOW, THEREFORE, BE IT RESOLVED that after careful consideration of maps, facts, exhibits,testimony and other evidence submitted in this matter, subject to the conditions which are enumerated in this Resolution beginning on PAGE 3 thereof, and those contained in all other Resolutions approved for this Project, the Administrative Hearing Officer does hereby: 1. Exercises its independent judgment and determines that the Project is exempt from CEQA pursuant to CEQA Guidelines section 15332. Section 15332 exemption applies projects characterized as in-fill development meeting the following criteria: a. The project is consistent with the applicable general plan designation and all applicable general plan policies as well as with applicable zoning designation and regulations. b. The proposed development occurs within the city limits on a project site of no more than five acres substantially surrounded by urban uses. c. The project site has no value as habitat for endangered,rare or threatened species. d. Approval of the project would not result in any significant effects relating to traffic, noise,air quality, or water quality. e. The site can be adequately served by all required utilities and public services. Therefore, the proposed project is consistent with the criteria stated above (Section 15332) and will not have a significant effect on the environment. 2. Approve the applications for two Two-Story Permits, Application Nos. R-2021-014 and R-2021-015, and 3. Find that the subconclusions upon which the findings and conditions specified in this Resolution are based are contained in the Public Hearing record concerning Application nos. R-2021-014 and R-2021-015 as set forth in the Minutes of the Administrative Hearing Officer of February 23, 2023 and are incorporated by reference as though fully set forth herein. SECTION III: CONDITIONS ADMINISTERED BY THE COMMUNITY DEVELOPMENT DEPARTMENT 1. APPROVED EXHIBITS The approval is based on a plan set entitled "Tentative Parcel Map for 24ot Subdivision 7752 Orion Lane,"prepared by RW Engineering, Inc.,on July 18,2022 consisting of three (3) sheets titled "Sheet 1 through Sheet 3" and the plan set entitled"New Two Story Residence w/Attached ADU for Suejane Han,"prepared by Aditi Mukherjee and Gregory Lewis Landscape Architect and dated October 11, 2022 and August 22, 2022, respectively, consisting of twenty-four (24) sheets titled "A1.1, Al, A3.1 to A3.2A, A4.1 to A4.2A, A6.1, A6.2, A7.1, A7.2, A8.1, A8.2, and LQ through L6" except as may be amended by conditions in this resolution.In the event there are conflicts between the floor plan, cross sections and elevation drawings, the elevation drawings take precedence. 2. UNITS APPROVED A total of two single family homes with two attached Accessory Dwelling Units are approved. A covenant shall be recorded prior to final occupancy to ensure that there shall be no internal connection between the accessory dwelling unit and the principal dwelling unit throughout the lifetime of the home, nor shall the accessory dwelling unit ever be allowed to converted to be part of the principal dwelling unit. 3. ANNOTATION OF THE CONDITIONS OF APPROVAL The conditions of approval set forth shall be incorporated into and annotated on the building plans. 4. ACCURACY OF PROJECT PLANS The applicant/property owner is responsible to verify all pertinent property data including but not limited to property boundary locations,building setbacks, property size, building square footage, any relevant easements and/or construction records. Any misrepresentation of property data may invalidate this approval and may require additional review. 5. CONSULTATION WITH OTHER DEPARTMENTS The applicant is responsible to consult with other departments and/or agencies with regard to the proposed project for additional conditions and requirements. Any misrepresentation of any submitted data may invalidate an approval by the Community Development Department. 6. CONCURRENT APPROVAL CONDITIONS The conditions of approval contained in file no.TM-2421-001. 7. PRIVACY PLANTING The final privacy planting plan shall be reviewed and approved by the Planning Division prior to issuance of building permits.The variety,size,and planting distance shall be consistent with the City's requirements. 8. PROTECTED TREES No removal of protected trees is approved as part of this Tentative Map approval. Any specimen trees proposed for removal will require approval of a separate Tree Removal Permit application and replacement under Chapter 14.18 of the Cupertino Municipal Code. 9. PRIVACY PROTECTION COVENANT The property owner shall record a covenant on this property to inform future property owners of the privacy protection measures and tree protection requirements consistent with the R-1 Ordinance,for all windows with views into neighboring yards and a sill height that is 5 feet or less from the second story finished floor. The precise language will be subject to approval by the Director of Community Development. Proof of recordation must be submitted to the Community Development Department prior to final occupancy of the residence. 10. FRONT YARD TREE The applicant shall indicate on site and landscape plans the location of a front yard tree to be located within the front yard setback area in order to screen the massing of the second story. The front yard tree shall be a minimum 24-inch box and 5 feet planted height and otherwise be consistent with the City's requirements. 11. FRONT YARD TREE COVENANT The property owner shall record a covenant on this property with the Santa Clara County Recorder's Office that requires the retention and maintenance of the required front yard tree. The precise language will be subject to approval by the Director of Community Development. Proof of recordation must be submitted to the Community Development Department prior to final occupancy of the residence. 12.LANDSCAPE PROJECT SUBMITTAL Prior to issuance of building permits, the applicant shall submit a full Landscape Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape Ordinance,for projects with landscape area 500 square feet or more or elect to submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for projects with landscape area between 500 square feet and 2,500 square feet. The Landscape Documentation Package or Prescriptive Compliance Application shall be reviewed and approved to the satisfaction of the Director of Community Development prior to issuance of building permits,and additional requirements per sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be reviewed and approved prior to final inspections. 13. EXTERIOR BUILDING MATERIALSITREATMENTS The final building exterior plan shall closely resemble the details shown on the original approved plans. Final building exterior treatment plan {including but not limited to details on exterior color, materials, ardiitectural treatments, doors, windows, lighting fixtures, and/or embellishments) shall be reviewed and approved by the Director of Community Development prior to issuance of building permits to ensure quality and consistency. Any exterior changes determined to be substantial by the Director of Community Development shall either require a modification to this permit or a new permit based on the extent of the change. 14. DUST CONTROL The following construction practices shall be implemented during all phases of construction for the proposed project to prevent visible dust emissions from leaving the site: a. Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles, graded areas, and unpaved access roads) at least twice daily and more often during windy periods to prevent visible dust from leaving the site; active areas adjacent to windy periods;active areas adjacent to existing land uses shall be kept damp at all times,or shall be treated with non-toxic stabilizers or dust palliatives. b. All haul trucks transporting soil, sand, or other loose material off-site shall be covered. c. All visible mud or dirt track-out onto adjacent public roads shall be removed using wet power vacuum street sweepers at least once per day. The use of dry power sweeping is prohibited. d. All vehicle speeds on unpaved roads shall be limited to 15 mph. e. All roadways, driveways, and sidewalks to be paved shall be completed as soon as possible. Building pads shall be laid as soon as possible after grading unless seeding or soil binders are used. f. Idling times shall be minimized either by shutting equipment off when not in use or reducing the maximum idling time to 5 minutes (as required by the California airborne toxics control measure Title 13, Section 2485 of California Code of Regulations [CCR]). Clear signage shall be provided for construction workers at all access points. g. All construction equipment shall be maintained and properly tuned in accordance with manufacturer's specifications. All equipment shall be checked by a certified mechanic and determined to be running in proper condition prior to operation. h. Post a publicly visible sign with the telephone number and person to contact at the Lead Agency regarding dust complaints. This person shall respond and take corrective action within 48 hours. The Air District's phone number shall also be visible to ensure compliance with applicable regulations. The applicant shall incorporate the City's construction best management practices into the building permit plan set prior to any grading, excavation, foundation or building permit issuance. 15. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS a. All grading activities shall be limited to the dry season (April 15 to October 1), unless permitted otherwise by the Director of Public works. b. Construction hours and noise limits shall be compliant with all requirements of Chapter 10.48 of the Cupertino Municipal Code. c. Grading, street construction, underground utility and demolition hours for work done more than 750 feet away from residential areas shall be Iimited to Monday through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Grading, street construction, demolition or underground utility work within 750 feet of residential areas shall not occur on Saturdays, Sundays, holidays, and during the nighttime period as defined in Section 10.48.053(b) of the Municipal Code. d. Construction activities shall be limited to Monday through Friday,7 a.m.to 8 p.m. and Saturday and Sunday,9 a.m. to 6 p.m. Construction activities are not allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night time construction is allowed if compliant with nighttime standards of Section 10.48 of the Cupertino Municipal Code. e. Rules and regulations pertaining to all construction activities and limitations identified in this permit, along with the name and telephone number of an applicant appointed disturbance coordinator, shall be posted in a prominent location at the entrance to the job site. f. The applicant shall be responsible for educating all contractors and subcontractors of said construction restrictions. The applicant shall comply with the above grading and construction hours and noise limit requirements unless otherwise indicated. 16.DEMOLITION REQUIREMENTS All demolished building and site materials shall be recycled to the maximum extent feasible subject to the Building Official. The applicant shall provide evidence that materials were recycled prior to issuance of final demolition permits. 17.DARK SKY ORDINANCE COMPLIANCE The applicant shall comply with Dark Sky Ordinance regulations, as applicable,prior to issuance of the building permit. 18. NESTING BIRDS Nests of raptors and other birds shall be protected when in active use, as required by the federal Migratory Bird Treaty Act and the California Department of Fish and Game Code. a. Construction and tree removal/pruning activities shall be scheduled to avoid the nesting season to the extent feasible. If feasible, tree removal and/or pruning shall be completed before the start of the nesting season to help preclude nesting. The nesting season for most birds and raptors in the San Francisco Say area extends from February 1 through August 31. Preconstruction surveys (described below) are not required for tree removal or construction activities outside the nesting period. If construction activities and any required tree removal occur during the nesting season (February 1 and August 31), a qualified ornithologist shall be required to conduct surveys prior to tree removal or construction activities. Preconstruction surveys shall be conducted no more than 14 days prior to the start of tree removal, pruning or construction. Preconstruction surveys shall be repeated at 14-day intervals until construction has been initiated in the area after which surveys can be stopped. During this survey, the ornithologist shall inspect all trees and other possible nesting habitats in and immediately adjacent to the construction areas for nests. b. If the survey does not identify any nesting birds that would be affected by construction activities, no further mitigation is required. If an active nest containing viable eggs or young birds is found sufficiently close to work areas to be disturbed by these activities,their locations shall be documented and protective measures implemented under the direction of the qualified ornithologist until the nests no longer contain eggs or young birds. c. Protective measures shall include establishment of clearly delineated exclusion zones(i.e.demarcated by identifiable fencing,such as orange construction fencing or equivalent) around each nest location as determined by the qualified ornithologist, taking into account the species of birds nesting, their tolerance for disturbance and proximity to existing development. In general, exclusion zones shall be a minimum of 300 feet for raptors and 75 feet for passerines and other birds. The active nest within an exclusion zone shall be monitored on a weekly basis throughout the nesting season to identify signs of disturbance and confirm nesting status. The radius of an exclusion zone may be increased by the qualified biologist,if project activities are determined to be adversely affecting the nesting birds. Exclusion zones may be reduced by the qualified biologist only in consultation with California Department of Fish and Wildlife. The protection measures and buffers shall remain in effect until the young have left the nest and are foraging independently or the nest is no longer active. d. A final report on nesting birds and raptors,including survey methodology,survey date(s), map of identified active nests (if any), and protection measures (if required), shall be submitted to the Planning Manager, through the building permit review process, and be completed to the satisfaction of the Community Development Director prior to the start of grading. 19, HAZARDS AND HAZARDOUS MATERIALS ASBESTOS AND/OR LEAD ASSESSOR CONSULTATION Prior to issuance of a demolition permit for on-site structures, the project applicant shall consult with certified Asbestos and/or Lead Risk Assessors to complete and submit for review to the Building Department an asbestos and lead survey.If asbestos containing materials or lead-containing materials are not discovered during the survey, further mitigation related to asbestos-containing materials or lead containing materials shall not be required. If asbestos containing materials and/or lead- containing materials are discovered by the survey,the project applicant shall prepare a work plan to demonstrate how the on-site asbestos-containing materials and/or lead-containing materials shall be removed in accordance with current California Occupational Health and Safety (Cal-OSHA) Administration regulations and disposed of in accordance with all CalEPA regulations,prior to the demolition and/or removal of the on-site structures. The plan shall include the requirement that work shall be conducted by a Cal-OSHA registered asbestos and lead abatement contractor in accordance with Title 8 CCR 1529 and Title 8 CCR 1532.1 regarding asbestos and lead training, engineering controls, and certifications. The applicant shall submit the work plan to the City of Cupertino for review and approval.The City has the right to defer the work plan to the Santa Clara County Department of Environmental Health for additional review. Materials containing more than one(1) percent asbestos that is friable are also subject to BAAQMD regulations. Removal of materials containing more than one (1) percent friable asbestos shall be completed in accordance with BAAQMD Section 11-2-303. 20. NOISE AND VIBRATION NOTICE AND SIGNAGE REQUIREMENTS a. At least 10 days prior to the start of any demolition, ground disturbing, or construction activities, the project applicant shall send notices of the planned activity by first class mail as follows: i. For projects on sites that are more than 0.5 acres or four or more residential units the notices shall be sent to off-site businesses and residents within 500 feet of the project site; ii. For projects on sites between 0.25 to 0.5 acres, or two or three residential units (not including Accessory Dwelling Units) notices shall be sent to off- site businesses and residents within 250 feet of the project site;or iii. For projects on sites less than 0.25 acres or one residential unit, the notices shall be sent to off-site businesses and residents within 100 feet of the project site. The notification shall include a brief description of the project, the activities that would occur, the hours when activity would occur, and the construction period's overall duration. The notification should include the telephone numbers of the contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint.The project applicant shall provide the City with evidence of mailing of the notice,upon request. b. At least 10 days prior to the start of construction activities, a sign shall be posted at the entrance(s) to the job site, clearly visible to the public, which includes permitted construction days and hours, as well as the telephone numbers of the City's and contractor's authorized representatives that are assigned to respond in the event of a noise or vibration complaint. If the authorized contractor's representative receives a complaint, they shall investigate, take appropriate corrective action, and report the action to the City within three business days of receiving the complaint. 21. NOISE MANAGEMENT DURING CONSTRUCTION Projects shall implement the following measures to reduce noise during construction and demolition activity: a. The project applicant and contractors shall prepare and submit a Construction Noise Control Plan to the City's Planning Department for review and approval prior to issuance of the first permit during the Building Permit stage. The Construction Noise Plan shall demonstrate compliance with daytime and nighttime decibel limits pursuant to Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code.The details of the Construction Noise Control Plan shall be included in the applicable construction documents and implemented by the on-site Construction Manager. Noise reduction measures selected and implemented shall be based on the type of construction equipment used on the site,distance of construction activities from sensitive receptor(s),site terrain,and other features on and surrounding the site (e.g., trees, built environment) and may include, but not be limited to, temporary construction noise attenuation walls, high quality mufflers. During the entire active construction period, the Construction Noise Control Plan shall demonstrate that compliance with the specified noise control requirements for construction equipment and tools will reduce construction noise in compliance with the City's daytime and nighttime decibel limits. b. Select haul routes that avoid the greatest amount of sensitive use areas and submit to the City of Cupertino Public Works Department for approval prior to the start of the construction phase. c. Signs will be posted at the job site entrance(s), within the on-site construction zones, and along queueing lanes (if any) to reinforce the prohibition of unnecessary engine idling. All other equipment will be turned off if not in use for more than 5 minutes. During the entire active construction period and to the extent feasible,the use of noise producing signals, including horns, whistles, alarms, and bells will be for safety warning purposes only. The construction manager will use smart back-up alarms, which automatically adjust the alarm level based on the background noise level or switch off back-up alarms and replace with human spotters in compliance with all safety requirements and law. 22. VOLATILE ORGANIC COMPOUND EMISSIONS FROM PAINT Prior to issuance of the first building permit, the Applicant shall include a note on all plans where paint specifications or other design specifications are listed, that the project design will incorporate only low-VOC paint (i.e., 50 grams per liter [g[L] or less)for interior and exterior wall architectural coatings. 23. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES Prior to the issuance of any demolition, grading or building permit involving soil disturbance, the project applicant shall provide written verification, including the materials provided to contractors and construction crews, to the City confirming that contractors and construction crews have been notified of basic archaeological site indicators, the potential for discovery of archaeological resources, laws pertaining to these resources, and procedures for protecting these resources as follows: a. Basic archaeological site indicators that may include,but are not limited to,darker than surrounding soils of a friable nature; evidence of fires (ash, charcoal, fire affected rock or earth); concentrations of stone, bone, or shellfish; artifacts of stone, bone, or shellfish; evidence of living surfaces (e.g., floors); and burials, either human or animal. b. The potential for undiscovered archaeological resources or tribal cultural resources on site. c. The laws protecting these resources and associated penalties, including, but not limited to, the Native American Graves Protection and Repatriation Act of 1990, Public Resources Code Section 5097, and California Health and Safety Code Section 7050 and Section 7052. d. The protection procedures to follow should construction crews discover cultural resources during project-related earthwork,include the following: i. All soil disturbing work within 25 feet of the find shall cease. ii. The project applicant shall retain a qualified archaeologist to provide and implement a plan for survey, subsurface investigation, as needed, to define the deposit,and assessment of the remainder of the site within the project area to determine whether the resource is significant and would be affected by the project. iii. Any potential archaeological or tribal cultural resources found during construction activities shall be recorded on appropriate California Department of Parks and Recreation forms by a qualified archaeologist.If the resource is a tribal cultural resource, the consulting archaeologist shall consult with the appropriate tribe, as determined by the Native American Heritage Commission, to evaluate the significance of the resource and to recommend appropriate and feasible avoidance, testing, preservation or mitigation measures, in light of factors such as the significance of the find, proposed project design,costs, and other considerations. The archeologist shall perform this evaluation in consultation with the tribe. 24. HUMAN REMAINS AND NATIVE AMERICAN BURIALS Prior to issuance of the any demolition,grading and building permits that involve soil disturbance, include on plans a note that, during project construction, the project applicant shall comply with California Health and Safety Code Section 7050.5 and California Public Resources Code Section 5097.98. a. In the event of discovering human remains during construction activities, there shall be no further excavation or disturbance of the site within a 100-foot radius of the remains, or any nearby area reasonably suspected to overlie adjacent remains. b. The Santa Clara County Coroner shall be notified immediately and shall make a determination as to whether the remains are Native American. c. If the Santa Clara County Coroner determines that the remains are not subject to his authority, he shall notify the Native American Heritage Commission (NAHC}within 24 hours. d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of the deceased Native American. e. The Most Likely Descendant has 48 hours following access to the project site to make recommendations or preferences regarding the disposition of the remains. If the Most Likely Descendant does not make recommendations within 48 hours after being allowed access to the project site, the owner shall, with appropriate dignity, reinter the remains in an area of the property secure from further disturbance and provide documentation about this determination and the location of the remains to the NAHC and the City of Cupertino. Alternatively,if the owner does not accept the Most Likely Descendant's recommendations, the owner or the descendent may request mediation by the NAHC. Construction shall halt until the mediation has concluded. 25. PALEONTOLOGICAL RESOURCES Prior to issuance of the any demolition, grading or building permit,include on plans a note that, during project construction, the project applicant shall implement the following measures: a. If paleontological resources are encountered during ground disturbing and/or other construction activities, all construction shall be temporarily halted or redirected to allow a qualified paleontologist, which shall be retained by the project applicant,to assess the find for significance and the Applicant shall notify the City. b. If paleontological resources are found to be significant, the paleontological monitor shall determine appropriate actions, in coordination with a qualified paleontologist,City staff,and property owner.Appropriate actions may include, but are not limited to, a mitigation plan formulated pursuant to guidelines developed by the Society of Vertebrate Paleontology and implemented to appropriately protect the significance of the resource by preservation, documentation, and/or removal, prior to recommencing activities. Measures may include, but are not limited to, salvage of unearthed fossil remains and/or traces (e.g., tracks, trails, burrows); screen washing to recover small specimens; preparation of salvaged fossils to a point of being ready for curation (e.g., removal of enclosing matrix, stabilization and repair of specimens, and construction of reinforced support cradles); and identification, cataloging, curation, and provision for repository storage of prepared fossil specimens. 26, INDEMNIFICATION AND LIMITATION OF LIABILITY As part of the application, to the fullest extent permitted by law, the applicant shall agree to indemnify,defend with the attorneys of the City's choice, and hold harmless the City, its City Council, and its officers, employees, and agents (collectively, the "indemnified parties") from and against any liability, claim, action, cause of action, suit, damages, judgment, lien, levy, or proceeding (collectively referred to as "proceeding")brought by a third party against one or more of the indemnified parties or one or more of the indemnified parties and the applicant related to any Ordinance, Resolution, or action approving the project, the related entitlements, environmental review documents, finding or determinations, or any other permit or approval authorized for the project. The indemnification shall include but not be limited to damages, fees, and costs awarded against the City, if any, and cost of suit, attorneys' fees, and other costs, liabilities, and expenses incurred in connection with such proceeding whether incurred by the Applicant, the City, or the parties initiating or bringing such proceeding. The applicant shall agree to (without limitation) reimburse the City its actual attorneys'fees and costs incurred in defense of the litigation.Such attorneys'fees and costs shall include amounts paid to the City's outside counsel and shall include City Attorney time and overhead costs and other City staff overhead costs and any costs directly related to the litigation reasonably incurred by City. The applicant shall likewise agree to indemnify,defend, and hold harmless the indemnified parties from and against any damages, attorneys' fees, or costs awards, including attorneys' fees awarded under Code of Civil Procedure section 102I.5, assessed or awarded against the indemnified parties. The Applicant shall cooperate with the City to enter a Reimbursement Agreement to govern any such reimbursement. The Applicant shall agree to (without limitation) reimburse the City for all costs incurred in additional investigation or study of, or for supplementing, redrafting, revising, or amending, any document (such as an Environmental Impact Report, negative declaration,specific plan,or general plan amendment)if made necessary by proceedings challenging the project approvals and related environmental review, if the applicant desires to continue to pursue the project. The Applicant shall agree that the City shall have no liability to the Applicant for business interruption,punitive,speculative, or consequential damages. 27. NOTICE OF FEES DEDICATIONS RESERVATIONS OR OTHER EXACTIONS The Conditions of Project Approval set forth herein may include certain fees, dedication requirements, reservation requirements, and other exactions. SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT SECTION IV: CONDITIONS ADMINISTERED BY THE PUBLIC WORKS DEPARTMENT Public Works Project Conditions of Approval. Except for otherwise noted, the following conditions must be completed and/or submitted prior to Parcel Map recordation. 28. STREET IMPROVEMENTS& DEDICATION 20' of Roadway dedication in fee title and frontage improvements along the project will be required to the satisfaction of the Director of Public Works. Street improvements, grading and drainage plans must be completed and approved prior to parcel map approval. Street improvements may include, but not be limited to, installation of curb & gutter, sidewalk, driveways, AC pavement, storm main, underground joint trench, sewer laterals. All improvements must be completed and accepted by the City prior to Building Final Occupancy or Street Improvement Encroachment Permit acceptance whichever comes first. 29. ACCEPTANCE OF PROPERTY RIGHTS The Public Works Director, or his/her designee, shall have the authority to accept all offers of dedications,easements,quitclaims and other property rights and interests on behalf of the City. 30. GRADING Grading shall be as approved and required by the Director of Public Works in accordance with Chapter 16.08 of the Cupertino Municipal Code. 401 Certifications and 404 permits maybe required. Please contact Army Corp of Engineers and/or Regional Water Quality Control Board as appropriate. Address comments provided during Planning application stage (comment letter dated 11-23-21). 31. DRAINAGE Drainage shall be provided to the satisfaction of the Director of Public. Any storm water overflows or surface sheeting should be directed away from neighboring private properties and to the public right of way as much as reasonably possible. If not all site drainage can be directed towards the street, drywells, retention systems or other approved systems and improvements will be required as necessary to collect the increase in storm water runoff between the pre- and post-development impervious area. 32. C.3 REQUIREMENTS C.3 regulated improvements are required if Project is creating andlor replacing 10,000 S.F. or more of impervious surface (collectively over the entire project site). The developer shall reserve a minimum of 4% of developable surface area for the placement of low impact development measures, for storm water treatment, unless an alternative storm water treatment plan,that satisfies C.3 requirements,is approved by the Director of Public Works. 33. SUBDIVISION IMPROVEMENT AGREEMENT The project developer shall enter into a subdivision improvement agreement with the City of Cupertino providing for payment of fees,including but not limited to checking and inspection fees, storm drain fees, park dedication fees and fees for under grounding of utilities. Said agreement and fees shall be executed and paid prior to parcel map approval. Fees: a. Checking& Inspection Fees: Per current fee schedule($4,898) b. Grading Permit: Per current fee schedule ($3,647) c. Parcel Map Fee: Per current fee schedule ($7,421) d. Storm Drainage Fee: Per current fee schedule ($1,858) e. Transportation Impact Fee: Per current fee schedule: ($6,797 for new unit) f. Park Fees: Per current fee schedule: ($60,000 for new unit) g. Street Tree Fee: Per current fee schedule: ($438 per tree) Bonds: a. Faithful Performance Bond: 100% of Off-site and On-site Improvements b. Labor&Material Bond: 100%of Off-site and On-site Improvement c. On-site Grading Bond: 100%of site improvements. The fees described above are imposed based upon the current fee schedule adopted by the City Council. However, the fees imposed herein may be modified at the time of recordation of a final map or issuance of a building permit in the event of said change or changes, the fees changed at that time will reflect the then current fee schedule. 34. PARCEL MAP Prior to approval of the Building permit, a parcel map shall be recorded. And, existing house must be demolished prior to recordation of the parcel map as building(s)cannot straddle between parcel lines. 35. TRANSPORTATION IMPACT FEES The Project is subject to the payment of Transportation Impact Fees under City's Transportation Impact Fee Program (Chapter 14.02 of the Cupertino Municipal Code). 36. PARKS The residential units are subject to the payment of parkland fees in-lieu of parkland dedication per Chapter 13.08 and Chapter 18.24 of the Cupertino Municipal Code. 37. SURVEYS A Boundary Survey and a horizontal control plan will be required for all new construction to ensure the proposed building will be set based on the boundary survey and setback requirements. 38. UNDERGROUND UTILITIES Developer shall comply with the requirements of the Underground Utilities Ordinance No. 331 and other related Ordinances and regulations of the City of Cupertino, and shall coordinate with affected utility providers for installation of underground utility devices. Developer shall submit detailed plans showing utility underground provisions. Said plans shall be subject to prior approval of the affected Utility provider and the Director of Public Works. 39.TRANSFORMERS &CABINETS Electrical transformers, telephone cabinets and similar equipment shall be placed in underground vaults. The developer must receive written approval from both the Public Works Department and the Community Development Department prior to installation of any above ground equipment. Should above ground equipment be permitted by the City, equipment and enclosures shall be screened with fencing and landscaping such that said equipment is not visible from public street areas, as determined by the Community Development Department. Transformers shall not be located in the front or side building setback area. 40. BEST MANAGEMENT PRACTICES Utilize Best Management Practices (BMPs), as required by the State Water Resources Control Board, for construction activity, which disturbs soil. BMP plans shall be included in grading and street improvement plans. 41. EROSION CONTROL PLAN Developer must provide an approved erosion control plan by a Registered Civil Engineer. This plan should include all erosion control measures used to retain materials on site. Erosion control notes shall be stated on the plans. 42. WORK SCHEDULE Every b months, the developer shall submit a work schedule to the City to show the timetable for all grading/erosion control work in conjunction with this project. 43. TRAFFIC CONTROL PLAN The developer must submit a traffic control plan by a Registered Traffic Engineer to be approved by the City. The plan shall include a temporary traffic control plan for work in the right of way as well as a routing plan for all vehicles used during construction. All traffic control signs must be reviewed and approved by the City prior to commencement of work. The City has adopted Manual on Uniform Traffic Control Devices (MUTCD) standards for all signage and striping work throughout the City. 44. FIRE PROTECTION Fire sprinklers shall be installed in any new construction to the approval of the City. 45. SANTA CLARA COUNTY FIRE DEPARTMENT A letter of clearance for the project shall be obtained from the Santa Clara County Fire Department prior to issuance of building permits. Clearance should include written approval of the location of any proposed Fire Backflow Preventers, Fire Department Connections and Fire Hydrants(typically Backflow Preventers should be located on private property adjacent to the public right of way, and fire department connections must be located within 100' of a Fire Hydrant). 46. FIRE HYDRANT Fire hydrants shall be located as required by the City and Santa Clara County Fire Department as needed_ 47. SAN IOSE WATER SERVICE COMPANY CLEARANCE Provide San Jose Water Company approval for water connection, service capability and location and layout of water lines and backflow Preventers prior to parcel map approval. 48. DEDICATION OF UNDERGROUND WATER RIGHTS i i Developer shall "quit claim" to the City all rights to pump, take or otherwise extract water from the underground basin or any underground strata in the Santa Clara Valley. 49. SANITARY DISTRICT A letter of clearance or sign off of street improvement plans for the project shall be obtained from the Cupertino Sanitary District prior parcel map approval. 50. UTILITY EASEMENTS Clearance approvals from the agencies with easements on the property (including PG&E,AT&T, and San Jose Water Company, and/or equivalent agencies) will be required prior final map approval. SECTION V: CONDITIONS ADMINISTERED BY THE SANTA CLARA COUNTY FIRE DEPARTMENT 51. BUILDING AND FIRE CODE The applicant shall apply for and obtain building permits to allow the construction of the approved project. The applicant shall provide information and plans to allow the Building Official and the Fire Marshall or their designee that the proposed plans comply with Building and Fire Codes in effect at the time of application for a building permit. SECTION VI: CONDITIONS ADMINISTERED BY THE ENVIRONMENTAL SERVICES DIVISION 52. ENVIRONMENTAL DIVISION STANDARDS Prior to issuance of the first demolition, grading and building permit, the applicant shall include the complete the City of Cupertino Climate Action Plan—Development Project Consistency Checklist, as subsequently revised, supplemented, or replaced, for review and approval by the City Environment and Sustainability Department to demonstrate how the project is consistent with the Cupertino Climate Action Plan. SECTION VII: CONDITIONS ADMINISTERED BY CUPERTINO SANITARY 53. CONNECTION PERMIT FEES Sewer Development Fees & Treatment Plant Capacity Fees will be required for the proposed work during the Building Permit Phase. The District is currently in the process of drafting up a District Wide Inflow and Infiltration Reduction program. i Additional fees for this projects Inflow & Infiltration reduction may be required during the Building Phase. 54_ LATERAL& SEWER LINE CLEANOUT At time of Building Permits,the Property Owner shall disconnect and temporarily cap their connection to the District-owned sanitary sewer lateral at the property fine,per the District's standards. The Property Owner shall provide video inspection of the existing District-owned sanitary sewer lateral. If the conditions of the existing lateral is not adequate, the owner shall be required to abandon and install a new sanitary sewer lateral, per District's standards. New lateral connection, inspection, administration, & engineering fees will be required for the new lateral during the Building Permit Phase. I Prior to application for Building Permits, the applicant shall add a new cleanout symbol on the proposed and existing sewer laterals on Sheet 3 of the civil sheets. 55. REGISTERED CONTRACTOR The contractor performing the work disconnecting and connecting to the District's sewer mains shall be registered with the District. PASSED AND ADOPTED this 23r-1 day of February, 2023 at a noticed Public Hearing of the Administrative Hearing Officer of the City of Cupertino, State of California,held by the Director of Community Development, or his or her designee, pursuant to Cupertino Municipal Code Section 19.12.120. ATTEST: APPROVED: �44 X;6 V Emi 5ugiya a Luke Connolly Associate Planner Administrative Hearing Officer