Loading...
Project Site PlanCommun FERPlan CUPERTINO Case # Approval Body: Approval Date_ Signature 1-QQ'1117A SUMMARY s ' l0ERIOR ELEVATIONS STREETSCAPE/ CONDITIONS PgROT USED Errli §yagij � n T r.r,� DLAN PARCEL A �� :�"�' ' Case Manager A3.1 FIRST FLOOR AREA CALCULATIONS PARCEL A A4.1 SECOND FLOOR PLAN PARCEL A A4.IA SECOND FLOOR AREA CALCULATIONS PARCEL A A6.1 EXTERIOR ELEVATION PARCEL A A7.1 EXTERIOR ELEVATION PARCEL A A8.1 BUILDING SECTION PARCEL A A3.2 FIRST FLOOR PLAN PARCEL B A3.2A FIRST FLOOR AREA CALCULATIONS PARCEL B A4.2 SECOND FLOOR PLAN PARCEL B A4.2A SECOND FLOOR AREA CALCULATIONS PARCEL B A6.2 EXTERIOR ELEVATION PARCEL B A7.2 EXTERIOR ELEVATION PARCEL B A8.2 BUILDING SECTION PARCEL B LO.E LANDSCAPE DOCUMENTATION - PARCEL A LO.W LANDSCAPE DOCUMENTATION - PARCEL B L1 HYDROZONE & LANDSCAPE PLAN L2 IRRIGATION PLAN L3 DETAILS L4 LANDSCAPE SPECIFICATION 1 TITLE SHEET 2 PRELIMINARY SITE PLAN 3 PRELIMINARY GRADING AND DRAINAGE PLAN SU-1 LOT SURVEY i F(;FNn PROJECT SUMMARY PROJECT ADDRESS 7752 ORION LANE APN 362-18-008 ZONING DISTRICT R1- 6 LAND USE LOW RES 1-5 DU/ AC FLOOD ZONE NO AREA CALCULATION GROSS LOT AREA 18000 S.F. NET LOT AREA 15000 S.F. ( 7500 SF EACH LOT) EXISTING FLOOR AREA 2285 SF - 12.7 % EXISTING LOT COVERAGE 2607 SF - 14.5% PARCEL A PARCEL B LOT AREA 7500 S.F. 7500 S.F. FLOOR AREA SUMMARY NEW FIRST FLOOR 1939.1 S.F 1943.2 S.F. ATTIC ABOVE 5 FT. 0.0 S.F. 0.0 S.F. FIRST FLOOR ROOF O/ 16 FT. 0.0 S.F. 0.0 S.F. NEW SECOND FLOOR 993.19 S.F. 989.9 S.F. TOTAL LIVING AREA 2932.28 S.F. 2933.1S.F. 2ND FLR TO 1 ST FLR RATIO 41.7% 41.5% NEW 2 CAR GARAGE 441.0 S.F. 441.0 S.F. TOTAL PROPOSED FLOOR AREA 3373.28 S.F. 3374.13 S.F. ALLOWABLE FLOOR AREA 3375 S.F. 3375.0 S.F. NEW ADU 748.75 S.F. 749.41S.F. LOT COVERAGE SUMMARY NEW FIRST FLOOR 1939.1 S.F. 1943.2 S.F. NEW FRONT PORCH 66.0 S.F. 131.0 S.F. NEW REAR PORCH 218.0 S.F. 218.0 S.F. BAY WINDOW 20.2 S.F. 20.2 S.F. POP OUT WINDOW AT KITCHEN 4.7 S.F. 4.7.S.F. SECOND FLOOR OVERHANG 0 S.F. 0.0 S.F. NEW GARAGE 441 S.F. 441.0 S.F. TOTAL EAVE PROJECTION 406.4 S.F. 411.0 S.F. TOTAL PROPOSED COVERAGE 3095.4 S.F. ( 41.4 %) 3050.9 S.F.(40.6%) NEW ADU 748.75 S.F. 749.41 S.F. BAY WINDOW AT ADU 31.0 S.F. 0.0 S.F. TOTAL LOT COVERAGE AT ADU 779.75 S.F. 749.41 S.F. OVERALL FLOOR AREA 4122.03 S.F. (54.9%) 4123.53 S.F.(54.9%) OVERALL LOT COVERAGE 3875.15 S.F. (51.6%) 3800.31S.F.( 50.6%) Dr Q1 residio ------ L- a O rnispart Dr mnedy School0 of Pumg� n oeano A,e o o d.-Way Woodlark Way ^ Columbus Ave ° Vai Ave D m C Kn�„cI T.... e, or a° rn William Regnart a�a Folkestone Dr ElementarySchool 9 P Belknap D, m _ nrovia St VICINITY MAP Lilac Way N � MITE-D Orlon Ln C WHO Ln Sgoi-ood Way The Home Depot Q Daman Dr De La Farge Dr Heatherwood Dr 0 D "onleaf La t Tiptoe Ln Stanford PI *11 o o <o Rollingdell Dr Goodwill of Silicon Valley H Mart San Jose De Anza 19 20 �d7 Kingsbury PI Pl ,e M.1-a Dr dy d� �y REVISIONS BY 8.12.21 3.21.22 4.25.22 10.11.22 ARcy ��5�0 V A MUKHERJEE LIC. C31611 -A REN: NOV. 2023 tP-1 �\Q T� OF CAQ U w U�Ucn WUO U x4 UWpUP4� Q - U DRAWN AM CHECKED DATE 2.16.21 SCALE 1 /8" = 1 ' " JOB :0 SHEET A 1 OF SHEETS