Loading...
BLD-2023-0156_Job Card + REV 1CITY OF CUPERTINO - BUILDING DIVISION 10300 TORRE AVENUE CUPERTINO, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG/ACCELA JOB CARD THIS CARD MUST BE POSTED AT A LOCATION VISIBLE FROM THE STREET FRONTAGE ON SITE OF THE STRUCTURE BEING PERMITTED AND IS NOT TO BE REMOVED UNTIL BUILDING FINAL. A HARD-COPY OF THE APPROVED PLANS AND DOCUMENTS SHALL BE KEPT AT THE SITE OF WORK. Permit No: Error retrieving data or unable to retrieve all required fields. Make sure permit has been issued to retrieve Job Card. Contact rosss@cupertino.org for assistance Issued Date: 02/01/2023 Building Address:Contractor: ON-TIME AIR CONDITIONING & HEATING LLC DBA SERVICE CHAMPIONS Job Description: UNIT A - PANEL UPGRADE (125 AMP) NEW GROUNDING; RELOCATE SERVICE MAST- EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED. *PLEASE REFER TO QR CODE FOR ANY REVISIONS OR UPDATED INFORMATION CITY OF CUPERTINO - BUILDING DIVISION 10300 TORRE AVENUE CUPERTINO, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG/ACCELA JOB CARD THIS CARD MUST BE POSTED AT A LOCATION VISIBLE FROM THE STREET FRONTAGE ON SITE OF THE STRUCTURE BEING PERMITTED AND IS NOT TO BE REMOVED UNTIL BUILDING FINAL. A HARD-COPY OF THE APPROVED PLANS AND DOCUMENTS SHALL BE KEPT AT THE SITE OF WORK. Permit No: Error retrieving data or unable to retrieve all required fields. Make sure permit has been issued to retrieve Job Card. Contact rosss@cupertino.org for assistance Issued Date: 02/02/2023 Building Address:Contractor: ON-TIME AIR CONDITIONING & HEATING LLC DBA SERVICE CHAMPIONS Job Description: UNIT A - PANEL UPGRADE (125 AMP) NEW GROUNDING; RELOCATE SERVICE MAST REV #1 - UPGRADE ELECTRICAL PANEL TO 125 AMP FOR UNIT B - APPROVED 06/21/2023 EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED. *PLEASE REFER TO QR CODE FOR ANY REVISIONS OR UPDATED INFORMATION