SUBJECT: TWO STORY PERMIT ACTION LETTER-Applications R-2023-004
This letter confirms the decision of the Director of Community Development, given on
July 31, 2023 approving a Two-Story Permit (R-2023-004) to construct second and first
floor additions to an existing single-family residence, resulting in a 2,370 sq. ft. two-
story, single-family residence located at 10692 Gascoigne Drive, with the following
conditions:
1. APPROVED EXHIBITS
The approval is based on a plan set entitled "10692 Gascoigne Dr, Cupertino, CA
95014", consisting of 14 plan sheets labeled "A0.1 through A0.5, A1.1 through A1.3,
A2.0 through A2.5, and Cl" except as may be amended by conditions in this
resolution.
2. ANNOTATION OF THE CONDITIONS OF APPROVAL
The conditions of approval set forth shall be incorporated into and annotated on the
building plans.
3. ACCURACY OF THE PROJECT PLANS
The applicant/property owner is responsible to verify all pertinent property data
including but not limited to property boundary locations, building setbacks,
property size, building square footage, any relevant easements and/or construction
records. Any misrepresentation of property data may invalidate this approval and
may require additional review.
4. COMPLIANCE WITH PUBLIC WORKS CONFIRMATION FORM
The project shall comply with the requirements indicated on the Public Works
Confirmation form dated January 24, 2023, including,but not limited to, dedications,
easements, off-site improvements, undergrounding of utilities, all necessary
agreements, and utility installations/relocations as deemed necessary by the Director
10692 Gascoigne Drive Page 2 of 13
R-2023-004
of Public Works and required for public health and safety. The Public Works
Confirmation is a preliminary review and is not an exhaustive review of the subject
development. Additional requirements may be established and implemented during
the construction permitting process. The project construction plans shall address
these requirements with the construction permit submittal, and all required
improvements shall be completed to the satisfaction of the Director of Public Works
prior to final occupancy.
5. CONSULTATION WITH OTHER DEPARTMENTS
The applicant is responsible to consult with other departments and/or agencies with
regard to the proposed project for additional conditions and requirements. Any
misrepresentation of any submitted data may invalidate an approval by the
Community Development Department.
6. FRONT YARD TREE
The applicant shall indicate on site and landscape plans the location of a front yard
tree to be located within the front yard setback area in order to screen the massing of
the second story. The front yard tree shall be a minimum 24-inch box and 6 feet
planted height and otherwise be consistent with the City's requirements.
7. FRONT YARD TREE COVENANT
The property owner shall record a covenant on this property with the Santa Clara
County Recorder's Office that requires the retention and maintenance of the required
front yard tree. The precise language will be subject to approval by the Director of
Community Development. Proof of recordation must be submitted to the
Community Development Department prior to final occupancy of the residence.
8. PRIVACY PLANTING
The final privacy planting plan shall be reviewed and approved by the Planning
Division prior to issuance of building permits. The variety, size, and planting
distance shall be consistent with the City's requirements.
9. PRIVACY PROTECTION COVENANT
The property owner shall record a covenant on this property to inform future
property owners of the privacy protection measures and tree protection
requirements consistent with the R-1 Ordinance, for all windows with views into
neighboring yards and a sill height that is 5 feet or less from the second story
finished floor. The precise language will be subject to approval by the Director of
Community Development. Proof of recordation must be submitted to the
Community Development Department prior to final occupancy of the residence.
10. LANDSCAPE PROJECT SUBMITTAL
Prior to issuance of building permits, the applicant shall submit a full Landscape
Documentation Package, per sections 14.15.050 A, B, C, and D of the Landscape
Ordinance, for projects with landscape area 500 square feet or more or elect to
submit a Prescriptive Compliance Application per sections 14.15.040 A, B, and C for
10692 Gascoigne Drive Page 3 of 13
R-2023-004
projects with landscape area between 500 square feet and 2,500 square feet. The
Landscape Documentation Package or Prescriptive Compliance Application shall be
reviewed and approved to the satisfaction of the Director of Community
Development prior to issuance of building permits, and additional requirements per
sections 14.15.040 D, E, F, and G or 14.15.050 E, F, G, H, and I will be required to be
reviewed and approved prior to final inspections.
11. EXTERIOR BUILDING MATERIALS/TREATMENTS
The final building exterior plan shall closely resemble the details shown on the
original approved plans. Final building exterior treatment plan (including but not
limited to details on exterior color, materials, architectural treatments, doors,
windows, lighting fixtures, and/or embellishments) shall be reviewed and approved
by the Director of Community Development prior to issuance of building permits to
ensure quality and consistency. Any exterior changes determined to be substantial
by the Director of Community Development shall either require a modification to
this permit or a new permit based on the extent of the change.
12. DEMOLITION REQUIREMENTS
All demolished building and site materials shall be recycled to the maximum extent
feasible subject to the Building Official. The applicant shall provide evidence that
materials were recycled prior to issuance of final demolition permits.
13. DUST CONTROL
The following construction practices shall be implemented during all phases of
construction for the proposed project to prevent visible dust emissions from leaving
the site:
a) Water all exposed surfaces areas (e.g., parking areas, staging areas, soil piles,
graded areas, and unpaved access roads) at least twice daily and more often
during windy periods to prevent visible dust from leaving the site; active areas
adjacent to windy periods; active areas adjacent to existing land uses shall be
kept damp at all times, or shall be treated with non-toxic stabilizers or dust
palliatives.
b) All haul trucks transporting soil, sand, or other loose material off-site shall be
covered.
c) All visible mud or dirt track-out onto adjacent public roads shall be removed
using wet power vacuum street sweepers at least once per day. The use of dry
power sweeping is prohibited.
d) All vehicle speeds on unpaved roads shall be limited to 15 mph.
e) All roadways, driveways, and sidewalks to be paved shall be completed as
soon as possible. Building pads shall be laid as soon as possible after grading
unless seeding or soil binders are used.
f) Idling times shall be minimized either by shutting equipment off when not in
use or reducing the maximum idling time to 5 minutes (as required by the
California airborne toxics control measure Title 13, Section 2485 of California
10692 Gascoigne Drive Page 4 of 13
R-2023-004
Code of Regulations [CCR]). Clear signage shall be provided for construction
workers at all access points.
g) All construction equipment shall be maintained and properly tuned in
accordance with manufacturer's specifications. All equipment shall be checked
by a certified mechanic and determined to be running in proper condition prior
to operation.
h) Post a publicly visible sign with the telephone number and person to contact at
the Lead Agency regarding dust complaints. This person shall respond and
take corrective action within 48 hours. The Air District's phone number shall
also be visible to ensure compliance with applicable regulations.
i) The applicant shall incorporate the City's construction best management
practices into the building permit plan set.
14. GRADING AND CONSTRUCTION HOURS AND NOISE LIMITS
a. All grading activities shall be limited to the dry season (April 15 to October 1),
unless permitted otherwise by the Director of Public works.
b. Construction hours and noise limits shall be compliant with all requirements of
Chapter 10.48 of the Cupertino Municipal Code.
c. Grading, street construction, underground utility and demolition hours for work
done more than 750 feet away from residential areas shall be limited to Monday
through Friday, 7 a.m. to 8 p.m. and Saturday and Sunday, 9 a.m. to 6 p.m.
Grading, street construction, demolition or underground utility work within 750
feet of residential areas shall not occur on Saturdays, Sundays, holidays, and
during the nighttime period as defined in Section 10.48.053(b) of the Municipal
Code.
d. Construction activities shall be limited to Monday through Friday, 7 a.m. to 8
p.m. and Saturday and Sunday, 9 a.m. to 6 p.m. Construction activities are not
allowed on holidays as defined in Chapter 10.48 of the Municipal Code. Night
time construction is allowed if compliant with nighttime standards of Section
10.48 of the Cupertino Municipal Code.
e. Rules and regulations pertaining to all construction activities and limitations
identified in this permit, along with the name and telephone number of an
applicant appointed disturbance coordinator, shall be posted in a prominent
location at the entrance to the job site.
f. The applicant shall be responsible for educating all contractors and
subcontractors of said construction restrictions.
The applicant shall comply with the above grading and construction hours and noise
limit requirements unless otherwise indicated
15. DARK SKY COMPLIANCE
Prior to issuance of Building Permits, the applicant/property owner shall submit
final plans in compliance with the approved lighting plans to comply with
development standards of Cupertino Municipal Code Section 19.102.040 Outdoor
Lighting Requirements. In the event changes are proposed from the approved plans,
10692 Gascoigne Drive Page 5 of 13
R-2023-004
said changes must be reviewed and approved by the Director of Community
Development or their designee. The applicant shall provide all documentation
required to determine compliance with the Municipal Code.
16. FUGITIVE DUST CONTROL
Prior to issuance of the any demolition, grading, or building permit, include on all
permit plans, the full text of each of the Bay Area Air Quality Management District's
Basic Control Measures from the latest version of BAAOMD's CEOA Air Quality
Guidelines, as subsequently revised, supplemented, or replaced, to control fugitive
dust (i.e., particulate matter PM2.5 and PM10) during demolition, ground disturbing
activities and/or construction.
17. VOLATILE ORGANIC COMPOUND EMISSIONS FROM PAINT
Prior to issuance of the first building permit, the Applicant shall include a note on all
plans where paint specifications or other design specifications are listed, that the
project design will incorporate only low-VOC paint (i.e., 50 grams per liter [g/L] or
less)for interior and exterior wall architectural coatings.
18. AVOID NESTING BIRDS DURING CONSTRUCTION
Prior to issuance of the any demolition, grading and building permit, indicate the
following on all construction plans:
a. Demolition, construction, ground-disturbing, and tree removal/pruning activities
shall be scheduled to be completed prior to nesting season (February 1 through
August 31),if feasible.
b. If demolition, construction, ground-disturbing, or tree removal/pruning activities
occur during the nesting season (February 1 and August 31), preconstruction
surveys shall be conducted as follows:
i. No more than 7 days prior to the start of demolition, construction, ground-
disturbing, or tree removal/pruning activities, in order to identify any active
nests with eggs or young birds on the site and surrounding area within 100
feet of construction or tree removal activities.
ii. Preconstruction surveys shall be repeated at 14-day intervals until
demolition, construction, ground-disturbing, or tree removal/pruning
activities have been initiated in the area, after which surveys can be
stopped. As part of the preconstruction survey(s),the surveyor shall inspect
all trees and other possible nesting habitats in, and immediately adjacent to,
the construction areas for active nests, while ensuring that they do not
disturb the nests as follows:
10692 Gascoigne Drive Page 6 of 13
R-2023-004
1) For projects that require the demolition or construction one single-
family residence, ground disturbing activities affecting areas of up to
500 square feet, or the removal of up to three trees, the property
owner or a tree removal contractor, if necessary, is permitted to
conduct the preconstruction surveys to identify if there are any active
nests. If any active nests with eggs or young birds are identified, the
project applicant shall retain a qualified ornithologist or biologist to
identify protective measures.
2) For any other demolition, construction and ground disturbing activity
or the removal of four or more trees, a qualified ornithologist or
biologist shall be retained by the project applicant to conduct the
preconstruction surveys.
iii. If the preconstruction survey does not identify any active nests with eggs or
young birds that would be affected by demolition, construction, ground-
disturbing or tree removal/pruning activities, no further mitigating action is
required. If an active nest containing eggs or young birds is found
sufficiently close to work areas to be disturbed by these activities, their
locations shall be documented, and the qualified ornithologist or biologist
shall identify protective measures to be implemented under their direction
until the nests no longer contain eggs or young birds.
iv. Protective measures may include, but are not limited to, establishment of
clearly delineated exclusion zones (i.e., demarcated by identifiable fencing,
such as orange construction fencing or equivalent) around each nest
location as determined by the qualified ornithologist or biologist, taking
into account the species of birds nesting, their tolerance for disturbance and
proximity to existing development. In general, exclusion zones shall be a
minimum of 300 feet for raptors and 75 feet for passerines and other birds.
The active nest within an exclusion zone shall be monitored on a weekly
basis throughout the nesting season to identify signs of disturbance and
confirm nesting status. The radius of an exclusion zone may be increased by
the qualified ornithologist or biologist, if project activities are determined to
be adversely affecting the nesting birds. Exclusion zones may be reduced by
the qualified ornithologist or biologist only in consultation with California
Department of Fish and Wildlife. The protection measures and buffers shall
remain in effect until the young have left the nest and are foraging
independently or the nest is no longer active.
10692 Gascoigne Drive Page 7 of 13
R-2023-004
V. A final report on nesting birds and raptors, including survey methodology,
survey date(s), map of identified active nests (if any), and protection
measures (if required), shall be prepared by the qualified ornithologist or
biologist and submitted to the Director of Community Development or his
or her designee, through the appropriate permit review process (e.g.,
demolition, construction, tree removal, etc.), and be completed to the
satisfaction of the Community Development Director prior to the start of
demolition, construction, ground-disturbing, or tree removal/pruning
activities.
19. ARCHAEOLOGICAL RESOURCES AND TRIBAL CULTURAL RESOURCES
Prior to the issuance of any demolition, grading or building permit involving soil
disturbance, the project applicant shall provide written verification, including the
materials provided to contractors and construction crews, to the City confirming that
contractors and construction crews have been notified of basic archaeological site
indicators, the potential for discovery of archaeological resources, laws pertaining to
these resources, and procedures for protecting these resources as follows:
a. Basic archaeological site indicators that may include, but are not limited to,
darker than surrounding soils of a friable nature;evidence of fires (ash, charcoal,
fire affected rock or earth); concentrations of stone,bone, or shellfish; artifacts of
stone, bone, or shellfish; evidence of living surfaces (e.g., floors); and burials,
either human or animal.
b. The potential for undiscovered archaeological resources or tribal cultural
resources on site.
c. The laws protecting these resources and associated penalties, including, but not
limited to, the Native American Graves Protection and Repatriation Act of 1990,
Public Resources Code Section 5097, and California Health and Safety Code
Section 7050 and Section 7052.
d. The protection procedures to follow should construction crews discover cultural
resources during project-related earthwork, include the following:
i. All soil disturbing work within 25 feet of the find shall cease.
ii. The project applicant shall retain a qualified archaeologist to provide and
implement a plan for survey, subsurface investigation, as needed, to define
the deposit, and assessment of the remainder of the site within the project
area to determine whether the resource is significant and would be affected
by the project.
iii. Any potential archaeological or tribal cultural resources found during
construction activities shall be recorded on appropriate California
10692 Gascoigne Drive Page 8 of 13
R-2023-004
Department of Parks and Recreation forms by a qualified archaeologist. If
the resource is a tribal cultural resource, the consulting archaeologist shall
consult with the appropriate tribe, as determined by the Native American
Heritage Commission, to evaluate the significance of the resource and to
recommend appropriate and feasible avoidance, testing, preservation or
mitigation measures, in light of factors such as the significance of the find,
proposed project design, costs, and other considerations. The archeologist
shall perform this evaluation in consultation with the tribe.
20. HUMAN REMAINS AND NATIVE AMERICAN BURIALS
Prior to issuance of the any demolition, grading and building permits that involve
soil disturbance, include on plans a note that, during project construction, the project
applicant shall comply with California Health and Safety Code Section 7050.5 and
California Public Resources Code Section 5097.98.
a. In the event of discovering human remains during construction activities, there
shall be no further excavation or disturbance of the site within a 100-foot radius
of the remains, or any nearby area reasonably suspected to overlie adjacent
remains.
b. The Santa Clara County Coroner shall be notified immediately and shall make
a determination as to whether the remains are Native American.
c. If the Santa Clara County Coroner determines that the remains are not subject
to his authority, he shall notify the Native American Heritage Commission
(NAHC)within 24 hours.
d. The NAHC shall attempt to identify descendants (Most Likely Descendant) of
the deceased Native American.
e. The Most Likely Descendant has 48 hours following access to the project site to
make recommendations or preferences regarding the disposition of the
remains. If the Most Likely Descendant does not make recommendations
within 48 hours after being allowed access to the project site, the owner shall,
with appropriate dignity, reinter the remains in an area of the property secure
from further disturbance and provide documentation about this determination
and the location of the remains to the NAHC and the City of Cupertino.
Alternatively, if the owner does not accept the Most Likely Descendant's
recommendations, the owner or the descendent may request mediation by the
NAHC. Construction shall halt until the mediation has concluded.
21. STORMWATER RUNOFF CONTAMINATION
Prior to issuance of any grading or building permits, the project applicant shall
demonstrate compliance with Chapter 9.18 (Stormwater Pollution Prevention and
Watershed Protection) of the Cupertino Municipal Code, to the satisfaction of the
10692 Gascoigne Drive Page 9 of 13
R-2023-004
City Engineer or his or her designee. All identified stormwater runoff control
measures shall be included in the applicable construction documents.
22. NOISE AND VIBRATION NOTICE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall ensure that a sign
measuring at least two feet by three feet shall be posted on construction fencing at
the entrance(s) to the job site, clearly visible to the public, and include the following:
a. Permitted construction days and hours;
b. A description of proposed construction activities;
c. Telephone numbers of the City's and contractor's authorized representatives
that are assigned to respond in the event of a noise or vibration complaint;
and
d. Contact information for City's and contractor's authorized representatives
that are assigned to respond in the event of a complaint related to fugitive
dust, pursuant to the requirements for compliance with BAAOMD's CEQA
Air Quality Guidelines.
If the authorized contractor's representative receives a complaint, they shall
investigate, take appropriate corrective action, and report the complaint and the
action taken to the City within three business days of receiving the complaint.
23. NOISE AND VIBRATION SIGNAGE
At least 10 days prior to the start of any demolition, ground disturbing, or
construction activities, the project applicant/contractor shall ensure that a sign
measuring at least two feet by three feet shall be posted on construction fencing at
the entrance(s) to the job site, clearly visible to the public, and include the following:
a. Permitted construction days and hours;
b. A description of proposed construction activities;
c. Telephone numbers of the City's and contractor's authorized representatives
that are assigned to respond in the event of a noise or vibration complaint; and
d. Contact information for City's and contractor's authorized representatives that
are assigned to respond in the event of a complaint related to fugitive dust,
pursuant to the requirements for compliance with BAAQMD's CEQA Air
Quality Guidelines.
If the authorized contractor's representative receives a complaint, they shall
investigate, take appropriate corrective action, and report the complaint and the
action taken to the City within three business days of receiving the complaint.
24. NOISE DURING CONSTRUCTION
10692 Gascoigne Drive Page 10 of 13
R-2023-004
Prior to issuance of any demolition, grading or building permit, include on plans a
note that, during project construction, the project applicant shall incorporate the
following measures to reduce noise during construction and demolition activity:
a. The project applicant and contractors shall prepare and submit a Construction
Noise Control Plan to the City's Planning Department for review and approval
prior to issuance of the first permit. The Construction Noise Plan shall
demonstrate compliance with daytime and nighttime decibel limits pursuant to
Chapter 10.48 (Community Noise Control) of Cupertino Municipal Code. The
details of the Construction Noise Control Plan shall be included in the
applicable construction documents and implemented by the on-site
Construction Manager. Noise reduction measures selected and implemented
shall be based on the type of construction equipment used on the site, distance
of construction activities from sensitive receptor(s), site terrain, and other
features on and surrounding the site (e.g., trees, built environment) and may
include, but not be limited to, temporary construction noise attenuation walls,
high quality mufflers. During the entire active construction period, the
Construction Noise Control Plan shall demonstrate that compliance with the
specified noise control requirements for construction equipment and tools will
reduce construction noise in compliance with the City's daytime and nighttime
decibel limits.
b. Select haul routes that avoid the greatest amount of sensitive use areas and
submit to the City of Cupertino Public Works Department for approval prior to
the start of the construction phase.
c. Signs will be posted at the job site entrance(s), within the on-site construction
zones, and along queueing lanes (if any) to reinforce the prohibition of
unnecessary engine idling. All other equipment will be turned off if not in use
for more than 5 minutes.
d. During the entire active construction period and to the extent feasible, the use
of noise producing signals, including horns, whistles, alarms, and bells will be
for safety warning purposes only. The construction manager will use smart
back-up alarms, which automatically adjust the alarm level based on the
background noise level or switch off back-up alarms and replace with human
spotters in compliance with all safety requirements and law.
25. PALEONTOLOGICAL RESOURCES
Prior to issuance of the any demolition, grading or building permit, include on plans
a note that, during project construction, the project applicant shall implement the
following measures:
a. If paleontological resources are encountered during ground disturbing and/or
other construction activities, all construction shall be temporarily halted or
redirected to allow a qualified paleontologist, which shall be retained by the
10692 Gascoigne Drive Page 11 of 13
R-2023-004
project applicant, to assess the find for significance and the Applicant shall
notify the City.
b. If paleontological resources are found to be significant, the paleontological
monitor shall determine appropriate actions, in coordination with a qualified
paleontologist, City staff, and property owner. Appropriate actions may
include, but are not limited to, a mitigation plan formulated pursuant to
guidelines developed by the Society of Vertebrate Paleontology and
implemented to appropriately protect the significance of the resource by
preservation, documentation, and/or removal, prior to recommencing
activities. Measures may include, but are not limited to, salvage of unearthed
fossil remains and/or traces (e.g., tracks, trails, burrows); screen washing to
recover small specimens; preparation of salvaged fossils to a point of being
ready for curation (e.g., removal of enclosing matrix, stabilization and repair of
specimens, and construction of reinforced support cradles); and identification,
cataloging, curation, and provision for repository storage of prepared fossil
specimens.
26. INDEMNIFICATION
As part of the application, to the fullest extent permitted by law, the applicant shall
agree to indemnify, defend with the attorneys of the City's choice, and hold harmless
the City, its City Council, and its officers, employees, and agents (collectively, the
"indemnified parties") from and against any liability, claim, action, cause of action,
suit, damages, judgment, lien, levy, or proceeding (collectively referred to as
"proceeding") brought by a third party against one or more of the indemnified
parties or one or more of the indemnified parties and the applicant related to any
Ordinance, Resolution, or action approving the project, the related entitlements,
environmental review documents, finding or determinations, or any other permit or
approval authorized for the project. The indemnification shall include but not be
limited to damages, fees, and costs awarded against the City, if any, and cost of suit,
attorneys' fees, and other costs, liabilities, and expenses incurred in connection with
such proceeding whether incurred by the Applicant,the City, or the parties initiating
or bringing such proceeding.
The applicant shall agree to (without limitation) reimburse the City its actual
attorneys' fees and costs incurred in defense of the litigation. Such attorneys' fees
and costs shall include amounts paid to the City's outside counsel and shall include
City Attorney time and overhead costs and other City staff overhead costs and any
costs directly related to the litigation reasonably incurred by City. The applicant
shall likewise agree to indemnify, defend, and hold harmless the indemnified parties
from and against any damages, attorneys' fees, or costs awards, including attorneys'
fees awarded under Code of Civil Procedure section 1021.5, assessed or awarded
against the indemnified parties. The Applicant shall cooperate with the City to enter
a Reimbursement Agreement to govern any such reimbursement.
10692 Gascoigne Drive Page 12 of 13
R-2023-004
The Applicant shall agree to (without limitation) reimburse the City for all costs
incurred in additional investigation or study of, or for supplementing, redrafting,
revising, or amending, any document (such as an Environmental Impact Report,
negative declaration, specific plan, or general plan amendment) if made necessary by
proceedings challenging the project approvals and related environmental review, if
the applicant desires to continue to pursue the project.
The Applicant shall agree that the City shall have no liability to the Applicant for
business interruption, punitive, speculative, or consequential damages.
27. NOTICE OF FEES,DEDICATIONS, RESERVATIONS OR OTHER EXACTIONS
The Conditions of Project Approval set forth herein may include certain fees,
dedication requirements, reservation requirements, and other exactions. Pursuant to
Government Code Section 66020(d) (1), these Conditions constitute written notice of
a statement of the amount of such fees, and a description of the dedications,
reservations, and other exactions. You are hereby further notified that the 90-day
approval period in which you may protest these fees, dedications, reservations, and
other exactions, pursuant to Government Code Section 66020(a), has begun. If you
fail to file a protest within this 90-day period complying with all of the requirements
of Section 66020,you will be legally barred from later challenging such exactions.
Please note that if this permit is not vested within a year, it shall expire on July 31,
2024.
Staff has made all the findings that are required for approval of a Two-Story Permit as
required and no additional conditions were placed as a condition for approval by
Cupertino's Municipal Code, Chapter 19.28.140(B).
1. The project is consistent with the Cupertino General Plan, any applicable specific plans,
zoning ordinances and the purposes of this title.
The proposed project is consistent with the General Plan as the project is within the
Low-Density land use area. There are no applicable specific plans that affect the
project. The project has been found to be consistent with the requirements of
Cupertino Municipal Code Chapter 19.28 Single Family (R-1) Residential.
2. The granting of the permit will not result in a condition that is detrimental or injurious to
property improvements in the vicinity, and will not be detrimental to the public health, safety
or welfare.
The granting of the permit will not result in a condition that is detrimental or
injurious to property improvements in the vicinity, and will not be detrimental to the
public health, safety or welfare as the projects is located within the R1-5 (Single
Family Residential) zoning district and will be compatible with the surrounding uses
of the neighborhood.
3. The proposed project is harmonious in scale and design with the general neighborhood.
10692 Gascoigne Drive Page 13 of 13
R-2023-004
The proposed project is located in a residential area consisting of single-family
homes. The proposed project maintains the single-family home scale found
compatible with the general neighborhood.
4. Adverse visual impacts on adjoining properties have been reasonably mitigated.
Any potential adverse impacts on adjoining properties have been reasonably
mitigated through installation of a front-yard tree as required by the R-1 Ordinance
and additional privacy plantings to screen the windows that have sill heights of 5-
feet or less.
Also, please note that an appeal of this decision can be made within fourteen (14)
calendar days from the date of this decision (Monday,August 14,2023 at 5:00 p.m.). If
this happens,you will be notified of a public hearing,which will be scheduled before
the Planning Commission. A copy of the appeal form is available online at:
www.cul2ertino.org/121anningforms. The completed appeal form and filing fee must be
received by the deadline to appeal and may be submitted in one of the following ways:
1. Preferred: Bring a signed copy of the appeal form to the City Clerk's office
between 7:30AM-5:OOPM (M-Th) and 7:30AM-4:30PM(F).
2. Other options:
a. Mail the completed form and a check in the amount of $347 to Attn: City
Clerk, City of Cupertino, 10300 Torre Avenue, CA 95014.
b. Email the completed form to cityclerk@cul2ertino.org and call (408) 777-3223
between 7:30AM - 5:30PM (M-Th) and 7:30AM - 4:30PM (F) to arrange for
payment by credit card.
Please contact the City Clerk's office for additional guidance and instructions on how to
file.
Sincerely,
/s/
Emi Sugiyama
Associate Planner
City of Cupertino