Loading...
6-19-20 Bids for Stevens Creek Blvd bike lane Phase 1The Cupertino Courier c/o Bay Area News Group 4 N. 2nd Street, Suite 800 San Jose, CA 95113 2083307 CITY OF CUPERTINO GRACE SCHMIDT 10300 TORRE AVENUE CUPERTINO. CA 95014 PROOF OF PUBLICATION State of California County of Santa Clara FILE NO. Bid - Stevens Creek Blvd Bike Lane I am a citizen of the United States. I am over the age of eighteen years and I am not a party to or interested in the above entitled matter. I am the Legal Advertising Clerk of the printer and publisher of the Cupertino Courier, a newspaper published in the English language in the City of Cupertino, County of Santa Clara, State of California. I declare that the Cupertino Courier is a newspaper of general circulation as defined by the laws of the State of California as determined by court decree dated November 13, 1956, Case Number 100637. Said decree states that the Cupertino Courier is adjudged to be a newspaper of general circulation for the City of Cupertino, County of Santa Clara and State of California. Said order has not been revoked. I declare that the notice, of which the annexed is a printed copy, has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates, to wit: 06/19/2020 I certify (or declare) under penalty of perjury that the foregoing is true and correct. Dated: June 21, 2020 Public Notice Advertiso Clerk Legal No. 0006492233 CITY OF CUPERTINO NOTICE INVITING BIDS STEVENS CREEK BOULEVARD BIKE LANE IMPROVEMENTS -PHASE 1 1. BfdAcceplanee. 1.1 Due Dale and Time, The City o1 pertino ("City") will accept sealed bids for its Stevens CreekCuBoulevard Bye Lane Irnpravemenls-Phase 1 project ("Projec!"), by or before !Wy 14, T Q a[ 2 p.m- 1.2 Electronic Submittals Only. All bids must be submilled in PDp format online at htipsl//apps.cuperlUno.org/bklminagement/iitd ex,aspx. Bidders may log into the applitAtion usurq the at000nt used to access bidding documents To submit a bid open the project and select the Electron[e Submission tah. The City may, acting in its sale discretion, reject any and all bids, and ma wane any fmmaierial deviation from the bid requirements to the full extent permitted by Law. It is necomrneridied that bidders familiarise themselves with the web application prior to the bid due dafe. Uake sure to follow all bid instructions and include all inquired forms, Submitting a bid electronically can fake more time than arilkip4ted s4 pkase allow enough ifine to finalize your bid submission by the stated dcadlfno. Bids In proses but not completely uploaded by the deadline will automatically be rejected by the system, It will not allow bid submission once the bid closes. .T, Project information, 2.1 Location and Description, The Project is located on Stevens Creek t'ioultnarci between N, Wolfe Rd and Tantau Avenue, The project includes enhancement of existing bike lanes by pravidinr� physical separations between bicyclists and motor vehicles as well as assodated dvil improvements including sidewalk, curb ramps. precast concrete islands, and roadway markings, reconstruction at or near the subject intersections, and traffic signal modifications, 2.2 Time for Completion. The project must be completed within 60 working days from the start date set forth in the Notice to Proceed, City anticipates that the Work will begin onor about September 8, 2020 but the anticipated start date is provided solely for conven- ience and is neither certain or binding. 2.3 Estimated cost. The estimated construction cost is 51,zoo,000. 3. License and Registration RequGemenls. 3.1 License. This Project requites a valid California contractors license for the fallowing classification(s)c Class A -General Engineer- ing or a C-B Concrete Contractor 3.2 DIR Regl5tratlon. City may not accept a Bid Proposal from or enter into the Contract with a bidder, without proof that the bidder Is registered with the Callfomia Department of Industrial Relations ("DIR7) to perform public work pursuant to Labor Code section 1725.5, subject to limited Iegal exceptions. 4. Contract Documents. The plans, specifications, bid forms and contract documents for the Project and any addenda thereto ("Contract Documents') are available In electronic form only, and may be dGwmfoaded from city's website under "Open Mels" at - and may also be available trom a kcal or regional plan room or trade journal. S. Bid Security. The Bid Proposal must be accompanied by bid security of ten percent at the maximum bid amount, In the term of a cashier's or certified check made payable to City, or a bid band executed by a surety licensed to do business in the State of Calime- nia on the Bid Bond form included with the Contract Documents. The bid security must guarantee that within tendays alter City Issues the Notice of Award. the successful bidder will execute the Contract and submit the payment and oerronnance bonds and Insurance certificates and endorsements and any other submittals as required by the Contract Documents and specified in the Notice of Award. 6 Prevailing Wage Regditements. &I General. Pursuant to California Labor Cade Section 1720 at seq., this Pro is subject to the prevailing wage requirements applica- ble to the locality in which the Work is to be performed for each craft. Classification or type or worker needed to perform the Work, incluc!bw empen er ppayments for health and welfare, pension, vacation, apprices lip antl similar purposes. &2 pales. These prevailing ratq.3 are on file with Cite City aix] available oriline at http://wwri.clir.ca.gov/DLSR. Each Corntraelor And Subcorotrodor most pay no [e5s than the Specified rates to all workm, employed to work on the Project. The schodule of tier diem wupes is Wsed upon a working day of tight hours. The rate for huli day and overtime work must 150 at toast time and one half, " compliance. The Contract will be Subject to compliance moni- torinAnd CnWrcoment by the DIR, under Labor Code Section 1771.1. 7, Porformanco and payment ponds, The successful bidder will be rot7 aired to provide performance and payment bonds, each for 100% of the Contract Price, as further specified in the Contract Documents. & Substitution of Severities, Substitution of appropriate securities in lieu of retention amounts from proggress payments is permitted under Public Contract Code section 27300. 5, Subcontractor List. Each Subcontractor must be rer�istered with the DIR to perform work an public projects, Each bideber must submit a completed Subcontractor list form with its Bid Proporal, including the name, location of the place of business, California contractor license number, DIR registration number, and percent. age of the Work to be performed (based on the base bid price) for each Subcontractor that will perform work or service or fabricate or install Work for the prime contractor in excess of one-half of 1% or me ono price or, ror consavaron or sireers ana nujnways. yiwuuu (whichever is greater), using the Subcontractor List form included with the Contract Documents, 10. Subcontractor Limit. The prime contractor Is required to self - perform at feast 51% of the Worts on the Project, as further specified In the instructions to Bidders, 11, Bidders' Conference. A bidders' conference will not be held for this PrWect. 12. lastmctiuos to Bidders. All bidders should carefully review the instructions to Bidders for more detailed Information before submitting a old Proposal. The definitions provided In Article i of the General Conditions apply to all of the Contract Documents. as defined therein. Including this Notice Inviting Bids. CITY OF CUPERTINO /SJKIRSTEN SQUARCIA CITY CLERK PUBLISH CW19M CU ::GM192233; June 19,2029