Loading...
BLD-2023-2558_Re-roof Tear off PolicyCUPERTINO REROOF !TEAR-0FF POLICY COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • buildin Din. PROJECT ADDRFSS,. / O A A S j�er1 i .S O)� � V = APN M � C O � 3 - �c S SI OWNER NAML�� Qll�f� E-MAIL: STREET ADDRESS: I O p� oC S D e �l l �� 17 AvAATE.�21P: CtL � e r � p FAX CONTRACTOR NAME: �Ll (,t �I�U R LL LICENSE NUMBER: SL4 SS� � LfCENSE}yPE:3 (� L. � BUS. I .J�-) � Cj Ci r v co�,,.,w,- rur.,�- D 2 0 � �t 'tit G S � �.n STREET AFPSTSO i ��� ((� 2 � C�«T�Z�P: J � S � c!4 R �J"YPI10PE; 4 I UNDERSTAND AND AGREE TO THE FOLLOWING: 1. The re -roof project shall comply with all applicable provisions of the 2022 California Codes and Cupertino Municipal Codes. *NOTE: PV/Solar removed from the existing roof to install new roofing will require a separate permit for re -installation of PV/Solar panels/system. 2 An inspection request may be scheduled up to one business day -before the rectuested inspection date. Please schedule inspections online or call (408) 777m3228 from 7:30arn-3:30pm (Mon-Thurs) or 7:30am-230pm (Friday) is schedule inspections. "Roa Tear-Q 'and "Roo[Piyzvood Nast" inspections are "ON CALL" inspections. You must rall in on the day of the inspection ONLY after that phase of the work is completed. The building inspector should be available within one hour. The hours for this service are: 7:30-10:30am and 1:00-330pm (Xlon-Thurs) and 7:30-10:34am and 12:30-2:30 (Friday). ""Final SuiIdine" inspection will be given a two hour window. 341 46 For all mraof inspections, safe ladder access to roof is to be provided per CAL OSHA requirements 1h unless handholds are provided. secured to prevent slipping. "Roof Tear-0. )o1s108-0Dllregs.htm}. Ladder side rails must extend to at least 3 ft. above the landing (roof surface) The ladder shall be so placed as to prevent slipping, of it shall be tied, blocked, held, or otherwise uired. All dry -rotted wood shall be replaced Rlior to this inspection. All xiai,islfas'beners shall be completely removed or knocked. -down prior to this inspection. ir inspection is 5. "RaofPlywoad Nail" inspection is required if new solid sheathing is installed. If solid shea#hing is present an existing roof at time of "Roof Tear - Off' inspection, "Roof Plywood Nail" inspection may be omitted. 6. "Roof Batterc" in sptgti on is reg uired if installation of We or metal shingle is required by manufacturer. This is an "ON CALL" inspection, gee 92 above for scheduling instructions. 7. NOTE: NO underlaymen# or roofing shad he applied without first obtaining all required inspectivnJs and documented approvals from the buildm*gffispector, Failure to obtain inspection approvals will resuI# in removal of all materials to sheathing to perform required inspections and a re -inspection fee will be charged. The re -inspection fee shall be ELw�d.prior_ #o scheduling another inspection. 8. A "Final BuildiaCm'spfcfion0 and a_RRrOval shall be obtained from the building inspector when the reroofing is completed. To receive final sign-of� the fallowing items will be required and verified: a. Fiat roofs shall have a minimum of 1/�" per foot of slope and shall demonstra#e no pending. b. Listings from approved Testing agencies for all pre -manufactured products used shall be available on -site to review at time of the inspection. Nate; Verification of class *A" fire rating may be requested by building inspector. G Spark arrestor installation, double wall flues have not been rut and 1" min. clearance to roof sheathing, plastic vents are painted with water based synthetic latex paint., gutters/downspouts installed, and verification of ND PV/Solar previously installed and/or the required PV/Solar permit for re -installation. All construction debris is to be removed, NOTE: Ci tv of Cupertino does NOT allow copper roofingor hopper architectural materials. I certify each of the folIowing is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand and agree to comply with the remof policy stated above. I understand that smoke detectors and carbon monoxide detectors are required to be instafledin accordance with Sections I Signature ofApplicant/Agent: If and R315 of the 2019 California Residential Code for "Final Build*nz" sign off. Date; T Re rooJPohcyj 02 2. doc Q/27/2023 Scanned with CamScanner