BLD-2023-2066_Reroof Tear off PolicyREROOF TEAR -OFF POLICY
CUPERTINO
COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION
ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL
10300 TORRE AVENUE - CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • building(a)cupertino.org
PROJECT ADDRESS '%1y �Q Q nu,�l4l
G•
APN#
OWNERNAME
STREET ADDRESS
1r
CITY, STATE, ZIP f a
C
FAX
CONTRACTORNAME �..
,� LGJL
LICENSENUMBER
6� 22l
LICENSETYPE
G�9
BUS. LIC.# Off' L
q 8
COMPANY NAME' - Ir/y(C pp /
VVV✓�J�11Ri f`l+ie'rl�J lt"
E-MAIL t
W eATSI4+ he 1�'��F�N(�(�V'.^I
FAX
STREET ADDREt KS
CITY, STATE, ZIP,,,,,,, _VD_4� / +11�
PHONEC�
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re -roof project shall comply with all applicable provisions of the 2016 California Codes.
2. An inspection request can be scheduled up to one business day before the requested inspection date.
Please schedule inspections online or call (408) 777-3228 from 7:30-3:30pm (Mon-Thurs) or 7:30-2:30pm
(Friday) to schedule inspection. For Tear -Off and Nailing Inspections, you must also call on the day of the
inspection only after that phase of the work is completed. The building inspector will be available within
one hour. The hours for this service are: 7:30-10:30am and 12:30-3:30 (Mon-Thurs) and 7:30-10:30am
and 12:30-2:30 (Friday). Final Inspections will be given a two hour window.
3. Tear -Off Inspection is required. Any and all dry -rotted wood shall be replaced prior to this inspection.
Unless new plywood roof sheathing is proposed throughout, all the nails/fasteners shall be either
completely knocked -down or removed prior to this inspection.
4. If plywood is installed, a plywood Nailing Inspection is required.
5. Roofing shall not be applied without first obtaining all prior inspection and written approvals from the
building inspector. Any roofing which is applied without first obtaining an approved inspection will require
the removal of all new material down to the sheathing so a proper inspection can be performed.
b. A Final Inspection and approval shall be obtained from the building inspector when the re -roofing is
completed. To receive a final sign -off, the following items will be verified:
a. Flat roofs shall have a minimum ofI/4" per foot of slope and demonstrate there is no pending.
b. Listings from approved testing agencies for all pre -manufactured products used shall be available
on -site to review at the time of the inspection.
c. Proper spark arrestor installation, vents painted, gutter/downspouts installed, debris removed. CMC
Section 9.18.210 does NOT allow copper roofing or copper architectural materials.
NOTE: If you call for a tear -off or plywood nailing inspection and the work is not complete, you will be
charged a re -inspection fee. The re -inspection fee shall be paid before another inspection can be
scheduled.
By my signing below, I certify each of the following is true: I am the property owner or authorized agent to act on the property own
behalf. I understand and agree to comply with the re -roof policy stated above. I also understand that smoke detectors and carbon
monoxide detectors are required to be instilled in ac�dance with Sections R314 and R315 of the 2016 California Residential Code.
Gfi
Date:
ReroofPo1icy_1018.doc revised 01115118