Loading...
BLD-2021-0739_Inspection RecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 21852 MONTE CT Cupertino APN: 326 19 081 PERMIT NO: BLD-2021-0739 OWNER'S NAME: GOEL NAVNEET TRUSTEE & ET AL OWNER'S PHONE: Not Provided CONTRACTOR: MUST RETRIEVE DATA.CONTRACTOR PHONE: DATE ISSUED 11/15/2023 8:44:34 AM ISSUED BY:VALUATION: $175000 JOB DESCRIPTION ONE STORY ADDITION (308 SF); (N) COVERED PORCHES (502 SF); (N) 2ND STORY BALCONY (380 SF); 2ND STORY BAY WINDOW ADDITION (22 SF); REMODEL BATHROOMS (386 SF); REMODEL KITCHEN (325 SF); REMODEL OTHER (950 SF); CONVERT ATTIC SPACE INTO BEDROOM (274 SF); WHOLE HOUSE REWIRE; INSTALL (N) PROPERTY LINE CLEANOUT; REMOVE (E) BEDROOM #1 FROM FIRST FLOOR AND REPLACE WITH DECK (206 SF); REMOVE SECOND FLOOR BALCONY (120 SF). REV #1 - REBUILDING THE STAIRCASE TO CREATE A 5 FT WIDE OPENING FROM DINING TO THE FAMILY ROOM; ADD A 14 FT WIDE CONCRETE PATIO IN THE BACK; REMOVE (2) WINDOWS IN KITCHEN; REMOVE (1) SLIDING DOOR IN FAMILY ROOM; REPLACE (7) WINDOWS IN LIVING/DINING ROOMS; REVISE TYPE OF WINDOW AT KITCHEN SINK-APPROVED 8/5/2022 REV # 2 - REVISE PROPOSED COVERED PORCH INTO AN ATTACHED STUDIO ADU (206 SF) - APPROVED 02/14/2023 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2022-07-19 Passed Antonio Torrez UNDERFLOOR FRAMING 2022-08-03 Passed Antonio Torrez UNDERFLOOR PLUMBING 2022-08-03 Passed Antonio Torrez UNDERFLOOR INSULATION 2022-08-04 Passed Antonio Torrez FOUNDATION 2022-09-27 Passed Antonio Torrez EXTERIOR SHEAR 2022-09-27 Conditional Antonio Torrez ROUGH PLUMBING 2022-10-17 Conditional Antonio Torrez ROUGH MECHANICAL 2022-11-04 Conditional Bob Sabich SHOWER PAN 2022-11-28 Passed Antonio Torrez INSULATION 2022-12-02 Conditional Antonio Torrez SHEETROCK 2022-12-12 Conditional Antonio Torrez SLAB 2022-12-16 Conditional Rodney Weathers INTERIOR LATH 2022-12-19 Cancelled   INTERIOR LATH 2022-12-16 Passed Rodney Weathers EXTERIOR LATH 2022-12-16 Failed Rodney Weathers UNDERGROUND GAS PIPING 2022-12-16 Failed Rodney Weathers INSULATION 2023-01-04 Conditional Antonio Torrez ROUGH ELECTRICAL 2023-01-04 Passed Antonio Torrez ROUGH MECHANICAL 2023-01-04 Passed Antonio Torrez ROUGH PLUMBING 2023-01-04 Passed Antonio Torrez EXTERIOR LATH 2023-01-18 Passed Antonio Torrez SHEETROCK 2023-01-18 Passed Antonio Torrez SCRATCH COAT 2023-01-31 Passed Antonio Torrez FOUNDATION 2023-03-10 Passed Rodney Weathers UNDERFLOOR FRAMING 2023-04-26 Passed Antonio Torrez UNDERFLOOR PLUMBING 2023-04-26 Passed Antonio Torrez UNDERFLOOR INSULATION 2023-04-28 Passed Antonio Torrez EXTERIOR SHEAR 2023-05-04 Passed Antonio Torrez EXTERIOR LATH 2023-05-24 Passed Antonio Torrez ROUGH ELECTRICAL 2023-06-09 Passed Antonio Torrez ROUGH FRAME 2023-06-09 Conditional Antonio Torrez ROUGH MECHANICAL 2023-06-09 Conditional Antonio Torrez ROUGH PLUMBING 2023-06-09 Conditional Antonio Torrez INSULATION 2023-06-15 Passed Antonio Torrez ROUGH MECHANICAL 2023-06-15 Passed Antonio Torrez ROUGH PLUMBING 2023-06-15 Passed Antonio Torrez ROUGH FRAME 2023-06-15 Passed Antonio Torrez SHEETROCK 2023-06-29 Passed Antonio Torrez FINAL BUILDING 2023-10-31 Failed Antonio Torrez SANITARY - FINAL 2023-11-07 Passed cupsanitary FINAL BUILDING 2023-11-15 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.