Loading...
BLD-2023-2006_Re-roof Tear offREROOF / TEAR -OFF POLICY COMMUNITY DEVELOPMENT DEPARTMENT BUILDING DIVISION G U PERTI N O 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • buildinnCaI)cupertino.om PROJECT ADDRESS: 10195PottemHatch APNe 01WNERNAM6 EMAIL STREET ADDRESS: 10195 POH¢rs Hatch CMN CITY' STALE' ZIP' Cu ertino CA FAX CCOONNTTRACroR NAME: LICENSENUMBER: LICEN ETYPE: BM UCW COWANY NAME: &MAR,: FAX ADDRESS: CITY, STATE, W PHONE' bSTRREET Wryer 1. The re -roof project shall comply with all applicable provisions of the 2022 California Cc 'NOTE: FV/Solar renewed from the existing roof to install new roofing will require a ser panels/system. 2. An inspection request may be scheduled up to one business day before the t d' online or call (408) 777-3228 from 7:30am-3:30pm (Mon-Thurs) or 7:30am-2:30pm (Friday) "Roof Plywood NaW inspections are "ON CALL" inspections. You most call in on the d the work is completed. The building inspector should be available within one hour. Th 1:00-3:30pm (Mon -Thum) and 7:30-30:30a , and 12:30-230 (Friday). "Final Buildind' im 3. For all reroof inspections, safe ladder access to roof is to be provided per CAL OSHA rec (https://www dir re gov/do IVY tools/n�-nm /regs htm). ladder side rails most extend to: unless handholds are provided. The ladder shall be so placed as to prevent slipping, or i secured to prevent slipping. 4. "Roof Tear -ON' inspection is required. All dry -rotted wood shall be replaced prior to tru completely removed or knocked -down prior to this inspection. 5. "Roof Pluwood Nail" inspection is required if new solid sheathing is installed. If solid s "Roof Tear -Off' inspection, "Roof Plywood Nail" inspection may be omitted. 6. "Roof Batten" inspection is requireif installation of 6le or metal shingle is required by inspection, we k2 above for scheduling instructions. 7. NOTE: NO underlayment or roofing shall be applied without first obtaining all required the building inspector. Failure to obtain inspection approvals will result in removal of a: inspections and a re -inspection fee will be charged. The re -inspection fee shall be vaid t 8. A "Final Building" ip t' d approval shall be obtained from final sign -off, the following items will be required and verified: a. Flat roofs shall have a minimum of %" per foot of slope and shall demonstrate no Pon b. Listings from approved testing agencies for all pre -manufactured products used sha: inspection. Note: Verification of class "A" fire rating may be requested by building i c. Spark arrestor installation, double wall flues have not been cut and 1" min clearance with water based synthetic latex paint, gutters/downspouts installed, and verification the required PV/Solar permit for re -installation. All construction debris is W be remov NOTE: City of Cupertino does NOT allow copper roofingpp hit to al !s and Cupertino Municipal Codes. rate permit for re -installation of PV/Solar section date. Please schedule inspections a schedule inspections. "Roof Tear-O/f' and r of the inspection ONLY after that phase of hours for this service are: 7:30-10:30am and ection will be given a two hour window. irements least 3 ft. above the landing (roof surface) shall be tied, blocked, held, or otherwise inspection. All nails/fasteners shall be nathmg is present on existing roof at time of anufacturer. This is an "ON CALL" Jspection/s and documented approvals from materials to sheathing to perform required for to scheduling another inspection r when the reroofing is completed. To receive ling. be available on -site to review at time of the ispector. D roof sheathing, plastic vents are painted of NO PV/Solar previously installed and or I certify each of the following is true: I am the property owner or authorized agent to act on Ihe property owner's behalf. I understand and agree to comply with the reroof policy stated above. I understand that smoke detectors al d carbon monoxide detectors are required to be installed in accordance with Sections R314 and R315 of the 2019 California Residentia Code for "Final Buildinw" sign off. 9/8123 Rer Rohcy_2022.doc revised 612712023