Loading...
BLD-2021-1519InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 1198 S STELLING RD Cupertino APN: 362 25 018 PERMIT NO: BLD-2021-1519 OWNER'S NAME: SHARMA RAVI AND ALPANA OWNER'S PHONE: 408 220 4743 CONTRACTOR: BILGA CONSTRUCTION INC, PO BOX 1008 FREMONT CONTRACTOR PHONE: 510-775-0048 DATE ISSUED 11/6/2023 1:50:08 PM ISSUED BY:VALUATION: $250000 JOB DESCRIPTION (N) ADDITION (623 SF); REMODEL OTHER (1,532 SF); (N) WATER HEATER; (N) HEAT PUMP; FULLY SPRINKLER BLDG; UPGRADE MAIN ELEC PANEL (325 AMPS); (N) 4-INCH SEWER LATERAL INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2022-10-07 Rescheduled   FOUNDATION 2022-10-10 Passed James Lee UNDERFLOOR FRAMING 2022-10-28 Passed Antonio Torrez UNDERFLOOR PLUMBING 2022-10-28 Passed Antonio Torrez UNDERFLOOR INSULATION 2022-10-28 Passed Antonio Torrez EXTERIOR SHEAR 2023-01-20 Passed James Lee ROOF NAIL 2023-01-20 Passed James Lee FIRE DEPT - SPRINKLERS - ROUGH 2023-02-22 Passed Santa Clara County Fire ROUGH ELECTRICAL 2023-04-06 Passed James Lee ROUGH FRAME 2023-04-06 Passed James Lee ROUGH MECHANICAL 2023-04-06 Passed James Lee ROUGH PLUMBING 2023-04-06 Passed James Lee EXTERIOR LATH 2023-04-06 Passed James Lee INSULATION 2023-04-13 Passed Bob Sabich ELECTRIC METER RELEASE 2023-04-13 Passed Rodney Weathers INTERIOR SHEAR 2023-04-13 Passed Rodney Weathers SHOWER PAN 2023-04-13 Passed Rodney Weathers GAS TEST 2023-04-24 Passed Bob Sabich INTERIOR LATH 2023-04-24 Passed Bob Sabich SHEETROCK 2023-04-24 Passed Bob Sabich SCRATCH COAT 2023-06-12 Passed Bob Sabich UNDERGROUND WATER SERVICE 2023-06-12 Passed Bob Sabich PROPERTY LINE CLEANOUT 2023-08-01 Failed Rodney Weathers PROPERTY LINE CLEANOUT 2023-08-04 Passed Bob Sabich SANITARY - VISUAL 2023-08-02 Passed cupsanitary SANITARY - FINAL 2023-10-16 Passed cupsanitary FINAL BUILDING 2023-11-06 Passed Antonio Torrez PW – DEV SERVICES FINAL 2023-10-30 Passed Kevin Rieden FINAL ELECTRICAL 2023-11-06 Passed Antonio Torrez FINAL MECHANICAL 2023-11-06 Passed Antonio Torrez FINAL PLUMBING 2023-11-06 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.