BLD-2021-1519InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 1198 S STELLING RD Cupertino APN: 362 25 018 PERMIT NO: BLD-2021-1519
OWNER'S NAME: SHARMA RAVI AND ALPANA OWNER'S PHONE: 408 220 4743
CONTRACTOR: BILGA CONSTRUCTION INC, PO BOX 1008 FREMONT CONTRACTOR PHONE: 510-775-0048
DATE ISSUED 11/6/2023 1:50:08 PM ISSUED BY:VALUATION: $250000
JOB DESCRIPTION
(N) ADDITION (623 SF); REMODEL OTHER (1,532 SF); (N) WATER HEATER; (N) HEAT PUMP; FULLY SPRINKLER BLDG; UPGRADE MAIN ELEC PANEL (325 AMPS); (N) 4-INCH SEWER LATERAL
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2022-10-07 Rescheduled
FOUNDATION 2022-10-10 Passed James Lee
UNDERFLOOR FRAMING 2022-10-28 Passed Antonio Torrez
UNDERFLOOR PLUMBING 2022-10-28 Passed Antonio Torrez
UNDERFLOOR INSULATION 2022-10-28 Passed Antonio Torrez
EXTERIOR SHEAR 2023-01-20 Passed James Lee
ROOF NAIL 2023-01-20 Passed James Lee
FIRE DEPT - SPRINKLERS - ROUGH 2023-02-22 Passed Santa Clara County Fire
ROUGH ELECTRICAL 2023-04-06 Passed James Lee
ROUGH FRAME 2023-04-06 Passed James Lee
ROUGH MECHANICAL 2023-04-06 Passed James Lee
ROUGH PLUMBING 2023-04-06 Passed James Lee
EXTERIOR LATH 2023-04-06 Passed James Lee
INSULATION 2023-04-13 Passed Bob Sabich
ELECTRIC METER RELEASE 2023-04-13 Passed Rodney Weathers
INTERIOR SHEAR 2023-04-13 Passed Rodney Weathers
SHOWER PAN 2023-04-13 Passed Rodney Weathers
GAS TEST 2023-04-24 Passed Bob Sabich
INTERIOR LATH 2023-04-24 Passed Bob Sabich
SHEETROCK 2023-04-24 Passed Bob Sabich
SCRATCH COAT 2023-06-12 Passed Bob Sabich
UNDERGROUND WATER SERVICE 2023-06-12 Passed Bob Sabich
PROPERTY LINE CLEANOUT 2023-08-01 Failed Rodney Weathers
PROPERTY LINE CLEANOUT 2023-08-04 Passed Bob Sabich
SANITARY - VISUAL 2023-08-02 Passed cupsanitary
SANITARY - FINAL 2023-10-16 Passed cupsanitary
FINAL BUILDING 2023-11-06 Passed Antonio Torrez
PW – DEV SERVICES FINAL 2023-10-30 Passed Kevin Rieden
FINAL ELECTRICAL 2023-11-06 Passed Antonio Torrez
FINAL MECHANICAL 2023-11-06 Passed Antonio Torrez
FINAL PLUMBING 2023-11-06 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.