BLD-2022-1968InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 7598 SQUIREWOOD WAY Cupertino APN: 362 26 034 PERMIT NO: BLD-2022-1968
OWNER'S NAME: CHEN MEICHIH TRUSTEE & ET AL OWNER'S PHONE: Not Provided
CONTRACTOR: SONNY BUILDERS INC, 357 S FAIRFAX AVE #274 LOS ANGELES CONTRACTOR PHONE: (855) 950-9181
DATE ISSUED 1/22/2024 2:03:09 PM ISSUED BY:VALUATION: $40000
JOB DESCRIPTION
REMODEL KITCHEN (291 SF); REMODEL AND ENLARGE (2) BATHROOMS (141 SF); REMODEL DINING ROOM (90 SF); CREATE (N) OFFICE/STORAGE AREA FROM (E) BEDROOM (40 SF);
(N) PROPERTY LINE CLEANOUT REV #1 - REPLACE SEWER LATERAL (40 FT)
INSPECTION TYPE DATE STATUS INSPECTOR
EXTERIOR SHEAR 2023-02-21 Conditional Bob Sabich
UNDERGROUND SEWER 2023-03-03 Passed Bob Sabich
SANITARY - VISUAL 2023-03-02 Passed cupsanitary
SANITARY - FINAL 2023-03-08 Passed cupsanitary
INTERIOR LATH 2023-03-20 Passed Rodney Weathers
ROUGH ELECTRICAL 2023-03-20 Passed Rodney Weathers
ROUGH FRAME 2023-03-20 Conditional Rodney Weathers
ROUGH PLUMBING 2023-03-20 Passed Rodney Weathers
ROUGH MECHANICAL 2023-03-20 Passed Rodney Weathers
SHOWER PAN 2023-03-28 Passed Bob Sabich
SHEETROCK 2023-03-28 Conditional Bob Sabich
INSULATION 2023-03-28 Passed Bob Sabich
FINAL BUILDING 2023-07-03 Failed Bob Sabich
FINAL ELECTRICAL 2023-07-03 Failed Bob Sabich
FINAL MECHANICAL 2023-07-03 Failed Bob Sabich
FINAL PLUMBING 2023-07-03 Failed Bob Sabich
SANITARY - FINAL 2023-07-03 Passed cupsanitary
FINAL BUILDING 2023-07-12 Failed Bob Sabich
FINAL ELECTRICAL 2023-07-12 Failed Bob Sabich
FINAL MECHANICAL 2023-07-12 Failed Bob Sabich
FINAL PLUMBING 2023-07-12 Failed Bob Sabich
FINAL BUILDING 2023-07-20 Failed Rodney Weathers
FINAL ELECTRICAL 2023-07-20 Failed Rodney Weathers
FINAL MECHANICAL 2023-07-20 Failed Rodney Weathers
FINAL PLUMBING 2023-07-20 Failed Rodney Weathers
ROUGH FRAME 2023-07-20 Passed Rodney Weathers
FINAL BUILDING 2024-01-22 Passed Antonio Torrez
FINAL ELECTRICAL 2024-01-22 Passed Antonio Torrez
FINAL MECHANICAL 2024-01-22 Passed Antonio Torrez
FINAL PLUMBING 2024-01-22 Passed Antonio Torrez
FINAL BUILDING 2024-01-22 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.