Loading...
BLD-2022-1968InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 7598 SQUIREWOOD WAY Cupertino APN: 362 26 034 PERMIT NO: BLD-2022-1968 OWNER'S NAME: CHEN MEICHIH TRUSTEE & ET AL OWNER'S PHONE: Not Provided CONTRACTOR: SONNY BUILDERS INC, 357 S FAIRFAX AVE #274 LOS ANGELES CONTRACTOR PHONE: (855) 950-9181 DATE ISSUED 1/22/2024 2:03:09 PM ISSUED BY:VALUATION: $40000 JOB DESCRIPTION REMODEL KITCHEN (291 SF); REMODEL AND ENLARGE (2) BATHROOMS (141 SF); REMODEL DINING ROOM (90 SF); CREATE (N) OFFICE/STORAGE AREA FROM (E) BEDROOM (40 SF); (N) PROPERTY LINE CLEANOUT REV #1 - REPLACE SEWER LATERAL (40 FT) INSPECTION TYPE DATE STATUS INSPECTOR EXTERIOR SHEAR 2023-02-21 Conditional Bob Sabich UNDERGROUND SEWER 2023-03-03 Passed Bob Sabich SANITARY - VISUAL 2023-03-02 Passed cupsanitary SANITARY - FINAL 2023-03-08 Passed cupsanitary INTERIOR LATH 2023-03-20 Passed Rodney Weathers ROUGH ELECTRICAL 2023-03-20 Passed Rodney Weathers ROUGH FRAME 2023-03-20 Conditional Rodney Weathers ROUGH PLUMBING 2023-03-20 Passed Rodney Weathers ROUGH MECHANICAL 2023-03-20 Passed Rodney Weathers SHOWER PAN 2023-03-28 Passed Bob Sabich SHEETROCK 2023-03-28 Conditional Bob Sabich INSULATION 2023-03-28 Passed Bob Sabich FINAL BUILDING 2023-07-03 Failed Bob Sabich FINAL ELECTRICAL 2023-07-03 Failed Bob Sabich FINAL MECHANICAL 2023-07-03 Failed Bob Sabich FINAL PLUMBING 2023-07-03 Failed Bob Sabich SANITARY - FINAL 2023-07-03 Passed cupsanitary FINAL BUILDING 2023-07-12 Failed Bob Sabich FINAL ELECTRICAL 2023-07-12 Failed Bob Sabich FINAL MECHANICAL 2023-07-12 Failed Bob Sabich FINAL PLUMBING 2023-07-12 Failed Bob Sabich FINAL BUILDING 2023-07-20 Failed Rodney Weathers FINAL ELECTRICAL 2023-07-20 Failed Rodney Weathers FINAL MECHANICAL 2023-07-20 Failed Rodney Weathers FINAL PLUMBING 2023-07-20 Failed Rodney Weathers ROUGH FRAME 2023-07-20 Passed Rodney Weathers FINAL BUILDING 2024-01-22 Passed Antonio Torrez FINAL ELECTRICAL 2024-01-22 Passed Antonio Torrez FINAL MECHANICAL 2024-01-22 Passed Antonio Torrez FINAL PLUMBING 2024-01-22 Passed Antonio Torrez FINAL BUILDING 2024-01-22 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.