Loading...
BLD-2023-2521InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10254 MINER PL Cupertino APN: 316 46 019 PERMIT NO: BLD-2023-2521 OWNER'S NAME: DUTT MOHAN AND SHIKHA TRUSTEE OWNER'S PHONE: 65079305836 CONTRACTOR: L H D CONSTRUCTION, 36735 BURDICK STREET NEWARK CONTRACTOR PHONE: 4089145783 DATE ISSUED 1/22/2024 9:43:34 AM ISSUED BY:VALUATION: $28680 JOB DESCRIPTION REMODEL KITCHEN - (200 AMP); UPGRADE SUB-PANEL SAME LOCATION - (100 AMP); DEDICATED 3/4' GAS LINE TO THE RANGE; REMOVE 4x 4 WINDOW REFRAME AND APPLY EXTERIOR SIDING. REV #1 - INSTALL TANKLESS WATER HEATER-APPROVED 1/11/2024 INSPECTION TYPE DATE STATUS INSPECTOR EXTERIOR LATH 2023-12-08 Cancelled   INSULATION 2023-12-08 Cancelled   ROUGH ELECTRICAL 2023-12-08 Cancelled   ROUGH FRAME 2023-12-08 Cancelled   ROUGH PLUMBING 2023-12-08 Cancelled   ROUGH MECHANICAL 2023-12-08 Cancelled   UNDERFLOOR PLUMBING 2023-12-08 Cancelled   UNDERFLOOR FRAMING 2023-12-08 Cancelled   EXTERIOR LATH 2023-12-07 Passed James Lee INSULATION 2023-12-07 Cancelled James Lee ROUGH ELECTRICAL 2023-12-07 Failed James Lee ROUGH FRAME 2023-12-07 Failed James Lee ROUGH MECHANICAL 2023-12-07 Failed James Lee ROUGH PLUMBING 2023-12-07 Failed James Lee UNDERFLOOR FRAMING 2023-12-07 Failed James Lee UNDERFLOOR PLUMBING 2023-12-07 Failed James Lee UNDERFLOOR ELECTRICAL 2023-12-07 Failed James Lee SHEETROCK 2023-12-19 Cancelled   GAS TEST 2023-12-19 Cancelled   EXTERIOR LATH 2023-12-19 Cancelled   INSULATION 2023-12-19 Cancelled   ROUGH ELECTRICAL 2023-12-19 Cancelled   ROUGH FRAME 2023-12-19 Cancelled   ROUGH ELECTRICAL 2023-12-08 Passed Antonio Torrez ROUGH PLUMBING 2023-12-08 Passed Antonio Torrez ROUGH PLUMBING 2023-12-19 Cancelled   UNDERFLOOR ELECTRICAL 2023-12-19 Cancelled   UNDERFLOOR PLUMBING 2023-12-19 Cancelled   UNDERFLOOR FRAMING 2023-12-19 Cancelled   ROUGH MECHANICAL 2023-12-19 Cancelled   GAS TEST 2023-12-08 Passed Antonio Torrez UNDERFLOOR FRAMING 2023-12-08 Passed Antonio Torrez ROUGH MECHANICAL 2023-12-08 Passed Antonio Torrez EXTERIOR LATH 2023-12-08 Passed Antonio Torrez INSULATION 2023-12-08 Passed Antonio Torrez FINAL ELECTRICAL 2024-01-22 Passed James Lee FINAL MECHANICAL 2024-01-22 Passed James Lee FINAL PLUMBING 2024-01-22 Passed James Lee HOODS 2024-01-22 Passed James Lee FINAL BUILDING 2024-01-22 Passed James Lee WATER HEATER 2024-01-22 Passed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.