Loading...
B-2018-2152InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 21566 MONROVIA ST CUPERTINO, CA 95014-4804 CUPERTINO APN: 356 23 016 PERMIT NO: B-2018-2152 OWNER'S NAME: Anantharam Sushma And Kothavale Shantanu OWNER'S PHONE: 408-568-9776 CONTRACTOR: MUST RETRIEVE DATA.CONTRACTOR PHONE: DATE ISSUED 1/18/2024 1:06:08 PM ISSUED BY:VALUATION: $0 JOB DESCRIPTION ADDITION (842 SF); REMODEL (1468 SF). REVISION #1 - EXPAND FOOTPRINT OF STUDY (63 SF); RAISE CEILING AT KITCHEN, DINING, AND LIVING ROOMS; ENLARGE SHOWERS IN BATHROOMS 2 & 3 - APPROVED 09/20/2021 REV #2 - UPGRADE ELECTRICAL MAIN PANEL TO 200AMP - APPROVED 1/31/2023 INSPECTION TYPE DATE STATUS INSPECTOR DEMOLITION STRUCTURE 2020-12-02 Rescheduled   DEMOLITION STRUCTURE 2021-01-07 Rescheduled   DEMOLITION STRUCTURE 2021-02-16 Passed Paul O'Sullivan FOUNDATION 2021-03-01 Failed Paul O'Sullivan FOUNDATION 2021-03-09 Passed Paul O'Sullivan UNDERFLOOR FRAMING 2021-03-22 Passed Bob Sabich COURTESY FOUNDATION 2021-06-03 Passed Bob Sabich ROOF NAIL 2021-06-30 Passed Bob Sabich EXTERIOR SHEAR 2021-06-30 Passed Bob Sabich ROUGH ELECTRICAL 2021-12-09 Failed Antonio Torrez EXTERIOR LATH 2021-12-09 Conditional Antonio Torrez ROUGH MECHANICAL 2021-12-09 Passed Antonio Torrez ROUGH PLUMBING 2021-12-09 Passed Antonio Torrez ROUGH ELECTRICAL 2021-12-15 Conditional Rodney Weathers ROUGH FRAME 2021-12-15 Failed Rodney Weathers ROUGH FRAME 2021-12-09 Failed Antonio Torrez EXTERIOR LATH 2022-01-04 Cancelled Antonio Torrez ROUGH FRAME 2022-01-04 Failed Antonio Torrez ROUGH ELECTRICAL 2022-01-04 Passed Antonio Torrez ROUGH FRAME 2022-02-09 Passed Antonio Torrez EXTERIOR LATH 2022-02-09 Conditional Antonio Torrez INSULATION 2022-02-15 Passed Antonio Torrez SHEETROCK 2022-02-22 Passed Antonio Torrez EXTERIOR LATH 2022-03-21 Passed Antonio Torrez SHOWER PAN 2022-03-21 Conditional Antonio Torrez SHOWER PAN 2022-03-29 Rescheduled   SHOWER PAN 2022-03-22 Passed Antonio Torrez INTERIOR LATH 2022-07-25 Passed Antonio Torrez FIRE DEPT - SPRINKLERS - FINAL 2022-12-06 Passed Santa Clara County Fire GAS TEST 2023-01-06 Passed Bob Sabich GAS METER RELEASE 2023-01-06 Passed Bob Sabich ELECTRIC METER RELEASE 2023-01-06 Passed Bob Sabich PW – DEV SERVICES FINAL 2023-11-29 Passed Kevin Rieden FINAL BUILDING 2024-01-10 Rescheduled Antonio Torrez FINAL ELECTRICAL 2024-01-10 Rescheduled Antonio Torrez FINAL MECHANICAL 2024-01-10 Rescheduled Antonio Torrez FINAL PLUMBING 2024-01-10 Rescheduled Antonio Torrez FINAL BUILDING 2024-01-18 Rescheduled   FINAL ELECTRICAL 2024-01-18 Passed Antonio Torrez FINAL MECHANICAL 2024-01-18 Rescheduled   FINAL PLUMBING 2024-01-18 Rescheduled   FINAL BUILDING 2024-01-18 Rescheduled   FINAL MECHANICAL 2024-01-18 Passed Antonio Torrez FINAL BUILDING 2024-01-18 Rescheduled   FINAL BUILDING 2024-01-18 Passed Antonio Torrez FINAL PLUMBING 2024-01-18 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.