BLD-2022-1514InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 7777 ORION PL Cupertino APN: 362 18 046 PERMIT NO: BLD-2022-1514
OWNER'S NAME: YUEN MANLEAD AND LEE YUEN MING TRUSTEE OWNER'S PHONE: 4084068812
CONTRACTOR: BARON CONSTRUCTION & REMODELING CORP, 14510 BIG BASIN WAY UNIT B SARATOGA CONTRACTOR PHONE: 4088684552
DATE ISSUED 1/18/2024 12:29:50 PM ISSUED BY:VALUATION: $150000
JOB DESCRIPTION
STRUCTURAL KITCHEN REMODEL (250 SF) INCLUDES (2) (N) PAD FOOTINGS, (N) BEAM, (2) (N) SHEARWALLS; REPLACE (2) DOORS WITH WINDOWS AND (1) WINDOW WITH A (N)
DOOR; REPLACE (4) WINDOWS LIKE FOR LIKE (NOT IN BIRD SENSITIVE ZONE).
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2023-05-31 Failed Bob Sabich
FOUNDATION 2023-06-01 Passed Bob Sabich
UNDERFLOOR FRAMING 2023-06-06 Passed Rodney Weathers
PIERS 2023-06-21 Conditional Bob Sabich
PIERS 2023-06-26 Passed Bob Sabich
ROUGH FRAME 2023-07-11 Conditional Antonio Torrez
ROUGH ELECTRICAL 2023-07-11 Conditional Antonio Torrez
INTERIOR SHEAR 2023-07-20 Conditional Bob Sabich
ROUGH FRAME 2023-07-20 Cancelled Bob Sabich
ROUGH ELECTRICAL 2023-07-25 Passed Rodney Weathers
ROUGH PLUMBING 2023-07-25 Passed Rodney Weathers
ROUGH MECHANICAL 2023-07-25 Passed Rodney Weathers
ROUGH FRAME 2023-07-31 Passed Bob Sabich
INSULATION 2023-08-03 Passed Rodney Weathers
SHEETROCK 2023-08-09 Passed Bob Sabich
INTERIOR SHEAR 2023-08-09 Passed Bob Sabich
SLAB 2023-08-17 Cancelled James Lee
INTERIOR LATH 2023-08-17 Passed James Lee
EXTERIOR LATH 2023-08-29 Passed James Lee
SANITARY - VISUAL 2023-08-30 Passed cupsanitary
PROPERTY LINE CLEANOUT 2023-09-06 Passed Antonio Torrez
SANITARY - FINAL 2023-09-07 Passed cupsanitary
PW – DEV SERVICES FINAL 2024-01-11 Passed Kevin Rieden
FINAL BUILDING 2024-01-12 Failed James Lee
FINAL BUILDING 2024-01-18 Passed 4LEAF1 4LEAF1
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.