Loading...
BLD-2022-1514InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 7777 ORION PL Cupertino APN: 362 18 046 PERMIT NO: BLD-2022-1514 OWNER'S NAME: YUEN MANLEAD AND LEE YUEN MING TRUSTEE OWNER'S PHONE: 4084068812 CONTRACTOR: BARON CONSTRUCTION & REMODELING CORP, 14510 BIG BASIN WAY UNIT B SARATOGA CONTRACTOR PHONE: 4088684552 DATE ISSUED 1/18/2024 12:29:50 PM ISSUED BY:VALUATION: $150000 JOB DESCRIPTION STRUCTURAL KITCHEN REMODEL (250 SF) INCLUDES (2) (N) PAD FOOTINGS, (N) BEAM, (2) (N) SHEARWALLS; REPLACE (2) DOORS WITH WINDOWS AND (1) WINDOW WITH A (N) DOOR; REPLACE (4) WINDOWS LIKE FOR LIKE (NOT IN BIRD SENSITIVE ZONE). INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2023-05-31 Failed Bob Sabich FOUNDATION 2023-06-01 Passed Bob Sabich UNDERFLOOR FRAMING 2023-06-06 Passed Rodney Weathers PIERS 2023-06-21 Conditional Bob Sabich PIERS 2023-06-26 Passed Bob Sabich ROUGH FRAME 2023-07-11 Conditional Antonio Torrez ROUGH ELECTRICAL 2023-07-11 Conditional Antonio Torrez INTERIOR SHEAR 2023-07-20 Conditional Bob Sabich ROUGH FRAME 2023-07-20 Cancelled Bob Sabich ROUGH ELECTRICAL 2023-07-25 Passed Rodney Weathers ROUGH PLUMBING 2023-07-25 Passed Rodney Weathers ROUGH MECHANICAL 2023-07-25 Passed Rodney Weathers ROUGH FRAME 2023-07-31 Passed Bob Sabich INSULATION 2023-08-03 Passed Rodney Weathers SHEETROCK 2023-08-09 Passed Bob Sabich INTERIOR SHEAR 2023-08-09 Passed Bob Sabich SLAB 2023-08-17 Cancelled James Lee INTERIOR LATH 2023-08-17 Passed James Lee EXTERIOR LATH 2023-08-29 Passed James Lee SANITARY - VISUAL 2023-08-30 Passed cupsanitary PROPERTY LINE CLEANOUT 2023-09-06 Passed Antonio Torrez SANITARY - FINAL 2023-09-07 Passed cupsanitary PW – DEV SERVICES FINAL 2024-01-11 Passed Kevin Rieden FINAL BUILDING 2024-01-12 Failed James Lee FINAL BUILDING 2024-01-18 Passed 4LEAF1 4LEAF1 EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.