Loading...
B-2018-0283 InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 21610 RAINBOW DR CUPERTINO, CA 95014-4815 CUPERTINO APN: 366 38 011 PERMIT NO: B-2018-0283 OWNER'S NAME: TEPMAN AVI AND ILANA TRUSTEE OWNER'S PHONE: 408-777-0937 CONTRACTOR: TOP GENERATION BUILDERS INC, 449 MEEK AVE HAYWARD CONTRACTOR PHONE: 510-296-3059 DATE ISSUED 1/17/2024 3:44:45 PM ISSUED BY:VALUATION: $0 JOB DESCRIPTION NEW RETAINING WALLS (220 LF) INSPECTION TYPE DATE STATUS INSPECTOR PW – DEV SERVICES FINAL 2024-01-09 Passed Kevin Rieden FINAL BUILDING 2024-01-17 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED. $-X\%-ODL93 POLLAK ENGINEERING, INC. Geotechnical Engineering 909 University Avenue, #20 Los Gatos, CA 95032 Phone: 408-499-5589 Project No. 1300 26 December 2023 Mr. Don Tepman 21610 Rainbow Drive Cupertino CA 95014 Subject: Slope Repair 21610 Rainbow Drive Cupertino, California GEOTECHNICAL SUMMARY REPORT References: 1 ) Updated Geotechnical Investigation By Pollak Engineering, Inc. Dated 19 December 2019 2) Improvement Plans Sheets C0.0 — C6.0 & C4.1 By Greenwood and Moore, Inc. Dated 19 October 2020 Dear Mr. Tepman: In accordance with your authorization, Pollak Engineering, Inc. has conducted construction observation services for the subject project. Provided herein is our summary of the site foundation and drainage operations for the subject construction. Our final site visit occurred on 24 December 2023. 1. All pier holes encountered competent native material and were drilled in accordance with project geotechnical requirements and the referenced construction plans. 2. Over steepened fill soil has been placed on the slope face in the area of the new piers. Some over steepened fill soil remains on the slope western portion of the slope face. 4. Drainage inlets are elevated and mounted on the slope face making them unlikely to catch water. I declare that all work for which I have professional responsibility, performed during the grading and foundation operations described in this report, was done in accordance with the current standard of care in the geotechnical industry, and in accordance with the approved plans and specifications. I have personally performed field operations, and believe the grading and foundation operations were correct to the best of my knowledge and belief. Project No. 1300 Geotechnicat Summary Report/ 21610 Ranbow Drive 26 December 2023 Should you have any questions relating to the contents of this letter or should you require additional information, please do not hesitate to contact our office at your convenience. Very truly yours, Pollak Engineering, Inc. QRQF ESS/ph �a � IOSEP '0lcc �Q- Ol (9 r C 61831 v m i rn d FV. F � 2 Robert Pollak, P.E. Principal Engineer Pollak Engineering, Inc. Page 2 of 3 r, `I