B-2018-0283 InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 21610 RAINBOW DR CUPERTINO, CA 95014-4815
CUPERTINO APN: 366 38 011 PERMIT NO: B-2018-0283
OWNER'S NAME: TEPMAN AVI AND ILANA TRUSTEE OWNER'S PHONE: 408-777-0937
CONTRACTOR: TOP GENERATION BUILDERS INC, 449 MEEK AVE HAYWARD CONTRACTOR PHONE: 510-296-3059
DATE ISSUED 1/17/2024 3:44:45 PM ISSUED BY:VALUATION: $0
JOB DESCRIPTION
NEW RETAINING WALLS (220 LF)
INSPECTION TYPE DATE STATUS INSPECTOR
PW – DEV SERVICES FINAL 2024-01-09 Passed Kevin Rieden
FINAL BUILDING 2024-01-17 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.
$-X\%-ODL93
POLLAK ENGINEERING, INC.
Geotechnical
Engineering
909 University Avenue, #20
Los Gatos, CA 95032
Phone: 408-499-5589
Project No. 1300
26 December 2023
Mr. Don Tepman
21610 Rainbow Drive
Cupertino CA 95014
Subject: Slope Repair
21610 Rainbow Drive
Cupertino, California
GEOTECHNICAL SUMMARY REPORT
References: 1 ) Updated Geotechnical Investigation
By Pollak Engineering, Inc.
Dated 19 December 2019
2) Improvement Plans Sheets C0.0 — C6.0 & C4.1
By Greenwood and Moore, Inc.
Dated 19 October 2020
Dear Mr. Tepman:
In accordance with your authorization, Pollak Engineering, Inc. has conducted
construction observation services for the subject project. Provided herein is our
summary of the site foundation and drainage operations for the subject
construction. Our final site visit occurred on 24 December 2023.
1. All pier holes encountered competent native material and were drilled in
accordance with project geotechnical requirements and the referenced
construction plans.
2. Over steepened fill soil has been placed on the slope face in the area of the
new piers.
Some over steepened fill soil remains on the slope western portion of the
slope face.
4. Drainage inlets are elevated and mounted on the slope face making them
unlikely to catch water.
I declare that all work for which I have professional responsibility, performed
during the grading and foundation operations described in this report, was done
in accordance with the current standard of care in the geotechnical industry, and
in accordance with the approved plans and specifications. I have personally
performed field operations, and believe the grading and foundation operations
were correct to the best of my knowledge and belief.
Project No. 1300 Geotechnicat Summary Report/ 21610 Ranbow Drive 26 December 2023
Should you have any questions relating to the contents of this letter or should you require
additional information, please do not hesitate to contact our office at your convenience.
Very truly yours,
Pollak Engineering, Inc.
QRQF ESS/ph
�a � IOSEP '0lcc
�Q- Ol
(9 r C 61831 v m
i rn
d FV.
F � 2
Robert Pollak, P.E.
Principal Engineer
Pollak Engineering, Inc. Page 2 of 3