BLD-2023-2371InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 22229 HAMMOND WAY Cupertino APN: 342 58 007 PERMIT NO: BLD-2023-2371
OWNER'S NAME: DELEPINE FRANCOIS AND KELLY ANN KAM TRUSTEE OWNER'S PHONE: 650-968-8846
CONTRACTOR: CLEAN SOLAR INC, 1445 KOLL CIRCLE STE 109 SAN JOSE CONTRACTOR PHONE: 510-305-1875
DATE ISSUED 1/16/2024 11:37:38 AM ISSUED BY:VALUATION: $37820
JOB DESCRIPTION
INSTALL (2) NEW TESLA POWERWALL ENERGY STORAGE SYSTEM (27 KWH); TESLA BACKUP GATEWAY 2 WITH INTERNAL LOAD CENTER (200A); LOAD CENTER (125A); ESSENTIAL LOAD
PANEL (200A) REV # 1 - PAGE ES-3 THE TWO 30A DISCONNECTS WERE REMOVED AND REPLACED WITH A SINGLE 60A DISCONNECT AT THE MAIN. PAGE ES-3 THE CONDUIT/WIRING
RUNNING FROM THE GATEWAY TO THE MAIN WAS UPSIZED TO 2” CONDUIT AND #3/0 WIRE-APPROVED 11/28/2023
INSPECTION TYPE DATE STATUS INSPECTOR
FINAL BUILDING 2023-12-18 Rescheduled
FINAL ELECTRICAL 2023-12-18 Rescheduled
FINAL BUILDING 2023-12-15 Rescheduled
FINAL ELECTRICAL 2023-12-15 Rescheduled
FINAL ELECTRICAL 2023-12-18 Cancelled
FINAL BUILDING 2023-12-18 Cancelled
FINAL BUILDING 2024-01-16 Passed Antonio Torrez
FINAL ELECTRICAL 2024-01-16 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.