Loading...
CC 04-03-2024 Item No. 1 Study Session_Written CommunicationsCC 04-03-2024 Study Session Item #1 Two-Year FY 2023-2025 City Work Program Written Communications From:Kitty Moore To:City Clerk; Kirsten Squarcia Cc:Pamela Wu; Christopher Jensen; Greg Card, CPPO Subject:Amended Re: Written Communications Item 1 CC April 3, 2024 Date:Wednesday, April 3, 2024 2:05:40 PM Attachments:C - Description of Carryovers and Adjustments through December 31 2023 (1).pdf H – FY 2023-24 Mid-Year Special Projects Update.pdf Dear City Clerk, My earlier email of written communications on this item may be removed and replaced with the following which is the same content with additional questions added, if that is possible, to save on file size. Please include the attachments with this email for written communications item 1 of the Special Meeting today. I would like to have a greater understanding of the Work Program items definition and what makes an item a ‘work program.’ Some of the Special Projects appear to be Work Program type of items. Does Council need to approve Special Projects that are not normal maintenance and operations? is there a dollar amount which would require approval, for instance, if staff wanted to work on a software application that would cost $100,000 to make, would that be a Work Program, and would that need to go to Council? I noticed there is an economic development type of PR contract here: https://records.cupertino.org/WebLink/DocView.aspx? id=1055423&dbid=0&repo=CityofCupertino&searchid=916006c9-4a2f-4dfd-8d7f- 6b05efb518d4&cr=1 This contract is for approximately $174k and I wonder, since it exceeds the budgeted contract services amount in the Economic Development budget, unit 100-12-705, is this potentially a Work Program item? The included attached file from February 21, 2024 CC meeting agenda item 9: “Attachment C” shows only $20,000 allocated to economic development strategy. Additionally, $400,000 appears to have be granted with a contractor and the “Enterprise Foundation” to small businesses in the following contract, is this a Work Program Item, from which year: https://records.cupertino.org/WebLink/DocView.aspx? id=1020448&dbid=0&repo=CityofCupertino&searchid=24032241-d89f-4c9c-8f04-373ba55ac062 This appears to be a $400,000 community grant program to small businesses which is coordinated with the “Enterprise Foundation,” would you please provide responses to the following transparency questions: 1. When was this Work Program initiated? 2. How much has been granted to date and to which businesses? 3. What are the qualifications of small businesses for being granted funds? 4. Are there any regulations regarding the granting of city funds to for profit businesses? 5. Are these General Funds from the City? 6. Who is the Enterprise Foundation, what is their role in the grant process? 7. Where is the Work Program update for this project so that we can know how it is doing? I think we need to have a clearer picture of what are city Work Programs, and where the direction regarding spending city funds ultimately arises from to ensure that public funds are being spent appropriately with transparency. Thank you, Kitty Moore Image removed by sender. Kitty Moore​​​​ Councilmember City Council KMoore@cupertino.gov (408) 777-1389 Image removed by sender.Image removed by sender.Image removed by sender.Image removed by sender.Image removed by sender.Image removed by sender.Image removed by sender. Detailed Budget Carryovers, Council-approved Adjustments, and Encumbrance Carryovers as of December 31, 2023 Attachment C Budget Adjustment Type Fund Description Amount BUDGET CARRYOVERS Budget Carryover 100 General Fund $14,000 for media training $5,400 for City logo revamp 19,400 Budget Carryover 100 General Fund $80,000 for community survey 80,000 Budget Carryover 100 General Fund 4H Fence replacement 30,000 Budget Carryover 100 General Fund 4H roof/gutter, Milk Barn repainting 36,347 Budget Carryover 100 General Fund AC2 Traffic Monitoring 77,340 Budget Carryover 100 General Fund Adaptive Traffic Signaling - Projects in progress 5,970 Budget Carryover 100 General Fund ad-hoc Council meeting expenses 11,425 Budget Carryover 100 General Fund AV Social Room,Sports Center,Cupertino Room 33,571 Budget Carryover 100 General Fund Backflow Prevention Device Repl - on backorder 4,000 Budget Carryover 100 General Fund Backwater valve replacement - project in progress 13,596 Budget Carryover 100 General Fund Bench replacements 29,442 Budget Carryover 100 General Fund Bridge tread repair McClellan 70,000 Budget Carryover 100 General Fund CAP Vision Summary Doc 10,000 Budget Carryover 100 General Fund CAPIO conference (2 people)2,400 Budget Carryover 100 General Fund City Facility reconfiguration/remodels/return to work 127,404 Budget Carryover 100 General Fund City Work Plan for Homeless Jobs Program - ongoing 40,040 Budget Carryover 100 General Fund Commission meeting meals per council policy 1,750 Budget Carryover 100 General Fund Conf room carpet replacement - project in progress 25,000 Budget Carryover 100 General Fund Council phone service 3,000 Budget Carryover 100 General Fund Crowe successor auditor prep and reproduction 700 Budget Carryover 100 General Fund CSTI and Bay Area UASI 24,600 Budget Carryover 100 General Fund CWP Electrification Study 50,000 Budget Carryover 100 General Fund CWP Revisit 5G 250,000 Budget Carryover 100 General Fund Deferred education due to Covid school closures 60,700 Budget Carryover 100 General Fund Deferred training due to Covid 9,913 Budget Carryover 100 General Fund Don Burnett Bridge inspection/median repairs 161,553 Budget Carryover 100 General Fund Dry rot maint retreat center - project in progress 25,000 Budget Carryover 100 General Fund Economic Development Strategy 20,000 Budget Carryover 100 General Fund Electric Cooking 6,400 Budget Carryover 100 General Fund Emergency preparedness outreach materials 2,500 Budget Carryover 100 General Fund Employee Commute Program 2,586 Budget Carryover 100 General Fund Energy Mgmt System Upgrades - project in progress 105,675 Budget Carryover 100 General Fund EOC System Electrical Upgrades - project in progress 25,000 Budget Carryover 100 General Fund ERP evaluation training and webinar workshops 16,896 Budget Carryover 100 General Fund ERP Implementation. Adjunct Staffing 720,673 Budget Carryover 100 General Fund Fee Study special project ongoing 70,800 Budget Carryover 100 General Fund Fence replacementMR in parking lot and path repairs 13,483 Budget Carryover 100 General Fund General Plan special project - ongoing 239,805 Budget Carryover 100 General Fund General supply purchases - supply chain delay 11,641 Budget Carryover 100 General Fund Glass replacement - project in progress 20,183 Detailed Budget Carryovers, Council-approved Adjustments, and Encumbrance Carryovers as of December 31, 2023 Attachment C Budget Adjustment Type Fund Description Amount Budget Carryover 100 General Fund Grassroots Ecology contract 23,240 Budget Carryover 100 General Fund Greenhouse Gas emission, Climate Corps fellow 27,000 Budget Carryover 100 General Fund Homeland Security Conf,CESA, Naval Postgrad School APEX 3,240 Budget Carryover 100 General Fund Housing Element Update - ongoing 108,189 Budget Carryover 100 General Fund I-280 Wolfe Improvement - project in progress 800,199 Budget Carryover 100 General Fund Irrigation Controller Settlement 103,785 Budget Carryover 100 General Fund Library HVAC ventilation maint & repair 42,800 Budget Carryover 100 General Fund Marina application under review - ongoing 23,317 Budget Carryover 100 General Fund M-Group contract 50,000 Budget Carryover 100 General Fund Moss Adams Enterprise Leadership Study 10,175 Budget Carryover 100 General Fund MRC Rise 6,323 Budget Carryover 100 General Fund Muni Code update - ongoing 25,000 Budget Carryover 100 General Fund new PT Business Systems Analyst position 45,162 Budget Carryover 100 General Fund New staff ergo evals and office equipment 3,028 Budget Carryover 100 General Fund New staff memberships and dues 3,830 Budget Carryover 100 General Fund New staff,deferred training due to pandemic 3,411 Budget Carryover 100 General Fund New staff; defered training due to pandemic 9,171 Budget Carryover 100 General Fund New staff; deferred training due to pandemic 15,116 Budget Carryover 100 General Fund Performance Management App HR portal of ERP 32,000 Budget Carryover 100 General Fund Playground chip - purchase/work in progress 17,824 Budget Carryover 100 General Fund Portal Park concrete replacement 25,000 Budget Carryover 100 General Fund PR Strategy contract being finalized in FY24.15,000 Budget Carryover 100 General Fund PR Strategy special project 160,000 Budget Carryover 100 General Fund purchase reusable banners for SCB 7,975 Budget Carryover 100 General Fund PW Scanning - Project in progress 28,226 Budget Carryover 100 General Fund Redesign of City Website. Adjunct Staffing 104,396 Budget Carryover 100 General Fund Regional Emergency Operations 500,000 Budget Carryover 100 General Fund Residential Mixed Used - ongoing 48,999 Budget Carryover 100 General Fund SC Corridor Vision Study - Work Plan Item 154,079 Budget Carryover 100 General Fund Senior Strategy CWP item is ongoing 41,378 Budget Carryover 100 General Fund Service Center Security project in progress 5,388 Budget Carryover 100 General Fund Shade structure replacement 65,630 Budget Carryover 100 General Fund Small to Medium Business Resiliency 500,000 Budget Carryover 100 General Fund Solar Battery Chargers for potential generator replacements 8,400 Budget Carryover 100 General Fund Special project - CWP Bicycle facilities 50,000 Budget Carryover 100 General Fund Special Projects LOS to VMT Standards 130,000 Budget Carryover 100 General Fund Special ProjectsMunicipal Water System 22,677 Budget Carryover 100 General Fund Staff augmentation delayed recruitement-Torres Engineering 82,806 Budget Carryover 100 General Fund Stay Active Fund used for Senior members 40,888 Budget Carryover 100 General Fund Sustainable Infrastructure Audit 10,000 Budget Carryover 100 General Fund The Hamptons developer agreement expires 2025 108,640 Detailed Budget Carryovers, Council-approved Adjustments, and Encumbrance Carryovers as of December 31, 2023 Attachment C Budget Adjustment Type Fund Description Amount Budget Carryover 100 General Fund Tree and concrete work in progress 6,657 Budget Carryover 100 General Fund Trees and Badges - projects in progress 1,263 Budget Carryover 100 General Fund Trench work - special project in progress 40,000 Budget Carryover 100 General Fund Turf supplies not received until FY24 35,512 Budget Carryover 100 General Fund Vallco Town Center - ongoing 188,680 Budget Carryover 100 General Fund Vallco Town Center building inspections - ongoing 5,406,634 Budget Carryover 100 General Fund Vallco Town Center plan review - ongoing 13,500,000 Budget Carryover 100 General Fund VIA Community Shuttle Pilot Program Work Plan Item 10,574 Budget Carryover 100 General Fund VTA CMP Member Agency Fees; invoice pending 73,374 Budget Carryover 100 General Fund VTC-Project in progress 766,777 Budget Carryover 100 General Fund Zoom Room Improvements 40,316 TOTAL GENERAL FUND 25,990,872 Budget Carryover 210 Storm Drain Improvement Pumpkin/Fiesta Storm Drain Ph 1 & 2 249,346 Budget Carryover 230 Env Mgmt Cln Crk Strm Drain New staff; defered training due to pandemic 3,077 Budget Carryover 230 Env Mgmt Cln Crk Strm Drain Outfall repairs-unpurchased compost,recology payment 133,791 Budget Carryover 230 Env Mgmt Cln Crk Strm Drain Outstanding payment for school busing,APN fee audit 39,328 Budget Carryover 265 BMR Housing City Work plan for low income 234,722 Budget Carryover 265 BMR Housing City Work Plan for Support for Unhoused - ongoing 50,000 Budget Carryover 270 Transportation Fund 1 additional gateway sign 25,859 Budget Carryover 270 Transportation Fund Annual asphalt project-work in progress 3,542,503 Budget Carryover 270 Transportation Fund Annual SW Curb & Gutter project in progress 257,294 Budget Carryover 270 Transportation Fund Bridge Rehab Minor 492,082 Budget Carryover 270 Transportation Fund Homestead/De Anza Signal Upgrade 98,132 Budget Carryover 270 Transportation Fund Orange & Byrne Sidewalk Improvements 399,990 Budget Carryover 270 Transportation Fund Ph 1 & Ph 2 Pavement digouts, crack seal & fog seal 561,043 Budget Carryover 270 Transportation Fund SBI Funds-work scheduled - project in progress 818,959 Budget Carryover 270 Transportation Fund Sidewalk inspections in progress 62,774 Budget Carryover 270 Transportation Fund Sign survey - project in progress 73,491 Budget Carryover 280 Park Dedication Granite Rock PO 2022-540 (74,751) Budget Carryover 280 Park Dedication Lawrence-Mitty Park 5,940,908 Budget Carryover 280 Park Dedication Memorial Park Pond Repurposing 1,140,478 Budget Carryover 280 Park Dedication MRP Community Garden Improvements 32,900 TOTAL SPECIAL REVENUE FUNDS 14,081,926 Budget Carryover 420 Capital Improvement Fund ADA Improvements, multi-year 120,166 Budget Carryover 420 Capital Improvement Fund BBF Pool Improvements 710,704 Budget Carryover 420 Capital Improvement Fund Bike Plan Implementation 8,649,892 Budget Carryover 420 Capital Improvement Fund California Commercial Fence PO 2021-514 (72,335) Budget Carryover 420 Capital Improvement Fund Carmen Road Bridge Right-of-Way 72,700 Budget Carryover 420 Capital Improvement Fund City Hall & Community Hall Improvements 454,037 Detailed Budget Carryovers, Council-approved Adjustments, and Encumbrance Carryovers as of December 31, 2023 Attachment C Budget Adjustment Type Fund Description Amount Budget Carryover 420 Capital Improvement Fund City Hall Annex (formerly10455 Torre Ave) Improv 1,901,522 Budget Carryover 420 Capital Improvement Fund City Lighting LED Transition Assessment 1,334,310 Budget Carryover 420 Capital Improvement Fund Citywide Community Garden - project scheduled 34,795 Budget Carryover 420 Capital Improvement Fund CW Bldg Condition Assess Impl 510,787 Budget Carryover 420 Capital Improvement Fund De Anza Blvd Buffered Bike Lanes 524,947 Budget Carryover 420 Capital Improvement Fund EV Parking Expansion - project in progress 208,000 Budget Carryover 420 Capital Improvement Fund Full-size Outdoor Basketball Court 29,493 Budget Carryover 420 Capital Improvement Fund G. Bortolotto PO 2023-204 (2,728) Budget Carryover 420 Capital Improvement Fund Guerra 3, 2022-11 Wilson Park Basketball Ct (97,225) Budget Carryover 420 Capital Improvement Fund Guerra Construction Group PO 2023-367 (18,086) Budget Carryover 420 Capital Improvement Fund Inclusive Play Area Planning 4,315,954 Budget Carryover 420 Capital Improvement Fund Library Expansion - project in progress 396,144 Budget Carryover 420 Capital Improvement Fund Mary Ave Protected Bikeway 49,000 Budget Carryover 420 Capital Improvement Fund McClellan Ranch Parking Lot Impro enviro monitoring 59,037 Budget Carryover 420 Capital Improvement Fund Memorial Park Specific Plan - project in progress 134,274 Budget Carryover 420 Capital Improvement Fund MR Community Garden Improv 1,099 Budget Carryover 420 Capital Improvement Fund Playground Equipment (Creekside & Varian)602,810 Budget Carryover 420 Capital Improvement Fund Pub Bldg Solar Service Center 18,571 Budget Carryover 420 Capital Improvement Fund Regnart Road Improvements 736,500 Budget Carryover 420 Capital Improvement Fund SCB/Bandley Signal & Median Imps (PM-Stillman)142,208 Budget Carryover 420 Capital Improvement Fund School Walk Audit Implementation 939,405 Budget Carryover 420 Capital Improvement Fund SLTG/280 Ped Bridge Lighting - (dev in lieu)46,449 Budget Carryover 420 Capital Improvement Fund St Light Install - Annual Infill - multi-year 74,838 Budget Carryover 420 Capital Improvement Fund St Light Replacement CW (labor) (PM-Alexander)99,330 Budget Carryover 420 Capital Improvement Fund Stelling/Alves Crosswalk Install 54,039 Budget Carryover 420 Capital Improvement Fund Stevens Crk Bank Repair Concept 30,216 Budget Carryover 420 Capital Improvement Fund Tree Inventory Stevens Creek Corridor 10,840 Budget Carryover 420 Capital Improvement Fund TYMAN Construction PO 2023-374 (9,537) Budget Carryover 420 Capital Improvement Fund Various Park Amenities - project in progress 471,221 TOTAL CAPITAL PROJECT FUNDS 22,533,377 Budget Carryover 520 Resource Recovery Calrecyle billing cycle delay 15,216 Budget Carryover 520 Resource Recovery New Landfill Agreement/Solid Waste 223,859 Budget Carryover 520 Resource Recovery SB1383 Procurement Requirements 44,640 Budget Carryover 520 Resource Recovery Single use Plastics Special project 3,986 Budget Carryover 560 Blackberry Farm BBF Golf Course recent fence repair 5,000 Budget Carryover 560 Blackberry Farm BBF Golf Renovation/Alt Use 270 Budget Carryover 570 Sports Center Door refinishing - project in progress 10,775 Budget Carryover 570 Sports Center HVAC Maint & Repair Special Projects in progress 23,705 Budget Carryover 570 Sports Center replacement windscreens for the Tennis Courts 72,853 Budget Carryover 570 Sports Center Sport Center Community Needs Analysis 25,000 Detailed Budget Carryovers, Council-approved Adjustments, and Encumbrance Carryovers as of December 31, 2023 Attachment C Budget Adjustment Type Fund Description Amount Budget Carryover 570 Sports Center Unforeseen purchase of umbrellas for Sports Center 1,700 Budget Carryover 580 Recreation Program Quinlan Sustainable Infrastructure 181,329 TOTAL ENTERPRISE FUNDS 608,333 Budget Carryover 610 Innovation & Technology ActiveNet Additional Readers 6,666 Budget Carryover 610 Innovation & Technology Business Automation platform additional support 30,000 Budget Carryover 610 Innovation & Technology CH Ent Server & Storage Tech Ref 140,000 Budget Carryover 610 Innovation & Technology City Hall Enterprise Server & Storage Tech refresh 275,639 Budget Carryover 610 Innovation & Technology CWP Cybersecurity Public Education 7,500 Budget Carryover 610 Innovation & Technology CWP License Plate Readers 60,000 Budget Carryover 610 Innovation & Technology LaserFiche Scanning 21,550 Budget Carryover 610 Innovation & Technology PT GIS Tech reclassification and transfer of Web Specialist 24,848 Budget Carryover 610 Innovation & Technology Security Framework and Audit 60,000 Budget Carryover 610 Innovation & Technology Senior Center Access Controls 16,000 Budget Carryover 610 Innovation & Technology Special Project Additional Telematic Devices 5,300 Budget Carryover 610 Innovation & Technology Special Project Facility Battery 40,037 Budget Carryover 610 Innovation & Technology upgrade to SaaS solution 30,000 Budget Carryover 630 Vehicle/Equip Replacement Equipment/vehicle purchase 46,970 Budget Carryover 630 Vehicle/Equip Replacement Sign shop roof repair - project in progress 56,182 TOTAL INTERNAL SERVICE FUNDS 820,692 TOTAL BUDGET CARRYOVERS 64,035,200 Detailed Budget Carryovers, Council-approved Adjustments, and Encumbrance Carryovers as of December 31, 2023 Attachment C Budget Adjustment Type Fund Description Amount COUNCIL ACTIONS Council Action 100 General Fund SVCE Community Resilience Grant for EV Chargers 233,963 TOTAL GENERAL FUND 233,963 Council Action 260 CDBG CDBG fund transfer to BCA CIP Project Snr Cntr Fire Alarm 367,951 Council Action 270 Transportation Fund CC approved budget transfer for McClellan Rd. Bike Corridor Ph 3 948,552 TOTAL SPECIAL REVENUE FUNDS 1,316,503 Council Action 420 Capital Improvement Fund CDBG fund transfer to BCA CIP Project Snr Cntr Fire Alarm 367,951 Council Action 420 Capital Improvement Fund Council-approved BA-SCB Calabazas Emergency Storm Drain Repair 460,000 Council Action 420 Capital Improvement Fund CC-approved budget adjustment for Cristo Rey Bike Lanes Project 30,000 Council Action 420 Capital Improvement Fund CC-approved budget adjustment for Regnart Rd Improv Project 876,766 Council Action 429 Capital Reserve Council-approved BA-SCB Calabazas Emergency Storm Drain Repair 460,000 Council Action 429 Capital Reserve CC-approved budget adjustment for Cristo Rey Bike Lanes Project 15,000 Council Action 429 Capital Reserve CC-approved budget adjustment for Regnart Rd Improv Project 876,766 TOTAL CAPITAL PROJECT FUNDS 3,086,483 TOTAL COUNCIL ACTIONS 4,636,949 Detailed Budget Carryovers, Council-approved Adjustments, and Encumbrance Carryovers as of December 31, 2023 Attachment C Budget Adjustment Type Fund Description Amount FIRST QUARTER ADJUSTMENTS First Quarter Adjustment 100 General Fund 4H Rack Room Building Damage 2,500 First Quarter Adjustment 100 General Fund CA Volunteer N2N Grant 64,405 First Quarter Adjustment 100 General Fund Ceramic Room A/C Unit Repair 3,631 First Quarter Adjustment 100 General Fund Compressor Repair 14,636 First Quarter Adjustment 100 General Fund Emergency Management Performance Grant 8,000 First Quarter Adjustment 100 General Fund Fire Sprinkler Repair 2,401 First Quarter Adjustment 100 General Fund IMPEC Additional Janitorial Services 29,118 First Quarter Adjustment 100 General Fund Transfer fr I&T Fund for Senior Center Access Controls 16,000 First Quarter Adjustment 100 General Fund Transfer from F520 for ClimateNav Hub funds 20,000 First Quarter Adjustment 100 General Fund Transfer from I&T Fund for License Plate Readers 60,000 First Quarter Adjustment 100 General Fund Unforeseen Breaker Repair 7,882 First Quarter Adjustment 100 General Fund Unforeseen Generator Repair 14,574 First Quarter Adjustment 100 General Fund Unforeseen HVAC Repair 10,858 First Quarter Adjustment 100 General Fund Unforeseen Panel Replacement 8,831 TOTAL GENERAL FUND 262,836 First Quarter Adjustment 230 Env Mgmt Cln Crk Strm Drain Defund Permeable Pavement Rebate (12,500) First Quarter Adjustment 270 Transportation Fund Transfer from CIP for Street Sign damage at Wilson Park 467 TOTAL SPECIAL REVENUE FUNDS (12,033) First Quarter Adjustment 420 Capital Improvement Fund Transfer from CIP for Street Sign damage at Wilson Park 467 TOTAL CAPITAL PROJECT FUNDS 467 First Quarter Adjustment 560 Blackberry Farm Tree Maintenance 55,000 First Quarter Adjustment 560 Blackberry Farm Utilities Adjustment 77,000 TOTAL ENTERPRISE FUNDS 132,000 First Quarter Adjustment 610 Innovation & Technology Transfer fr Gen Fund for Municipal Code Publishing 7,684 First Quarter Adjustment 610 Innovation & Technology Transfer from Gen Fund for LaserFiche Conference 2,500 First Quarter Adjustment 610 Innovation & Technology Transfer from Gen Fund for LaserFiche Consultation 15,900 First Quarter Adjustment 610 Innovation & Technology Transfer from Gen Fund for LaserFiche Subscription 45,000 First Quarter Adjustment 610 Innovation & Technology Transfer from Gen Fund for NexSan WORM Device 10,600 First Quarter Adjustment 610 Innovation & Technology Transfer from General Fund for Salaries Part Time 56,000 First Quarter Adjustment 630 Vehicle/Equip Replacement Install Wood Chipper Safety Shields 19,187 TOTAL INTERNAL SERVICE FUNDS 156,871 TOTAL FIRST QUARTER ADJUSTMENTS 540,141 Detailed Budget Carryovers, Council-approved Adjustments, and Encumbrance Carryovers as of December 31, 2023 Attachment C Budget Adjustment Type Fund Description Amount ENCUMBRANCE CARRYOVERS Encumbrance Carryover 100 General Fund Year End Soft Close 9,723,884 TOTAL GENERAL FUND 9,723,884 Encumbrance Carryover 210 Storm Drain Improvement Year End Soft Close 1,566,693 Encumbrance Carryover 230 Env Mgmt Cln Crk Strm Drain Year End Soft Close 296,053 Encumbrance Carryover 260 CDBG Year End Soft Close 6,637 Encumbrance Carryover 265 BMR Housing Year End Soft Close 3,666 Encumbrance Carryover 270 Transportation Fund Year End Soft Close 1,998,991 Encumbrance Carryover 280 Park Dedication Year End Soft Close 229,394 TOTAL SPECIAL REVENUE FUNDS 4,101,434 Encumbrance Carryover 420 Capital Improvement Fund Year End Soft Close 1,994,887 Encumbrance Carryover 427 Stevens Creek Corridor Park Year End Soft Close 7,848 TOTAL CAPITAL PROJECT FUNDS 2,002,735 Encumbrance Carryover 520 Resource Recovery Year End Soft Close 284,540 Encumbrance Carryover 560 Blackberry Farm Year End Soft Close 5,858 Encumbrance Carryover 570 Sports Center Year End Soft Close 7,925 TOTAL ENTERPRISE FUNDS 298,323 Encumbrance Carryover 610 Innovation & Technology Year End Soft Close 239,797 Encumbrance Carryover 630 Vehicle/Equip Replacement Year End Soft Close 761,591 TOTAL INTERNAL SERVICE FUNDS 1,001,388 TOTAL ENCUMBRANCE CARRYOVERS 17,127,764 BUDGET CARRYOVER, COUNCIL APPROVED ADJUSTMENT, AND ENCUMBRANCE CARRYOVER TOTAL 86,340,054 FY 2023-24 ADOPTED BUDGET 121,765,857 FY 2023-24 AMENDED BUDGET AS DECEMBER 31, 2023 208,105,911$ FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY24 Administration 120  City Manager 750.239 ‐ PR & Strategic Comm Strategy 100‐12‐120 ‐   General Fund‐City  Manager‐City  Manager               175,000             11,700 In Progress 8/30/2025 FY19 Administration 122  Sustainability Division 750.018 ‐ Climate Action Plan 100‐12‐122 ‐   General Fund‐City  Manager‐ Sustainability  Division                            ‐                        ‐ Transferred Transferred to Public Works 100‐81‐ 122 750.018 in FY24 FY19 Administration 122  Sustainability Division 750.019 ‐ Employee Commute Program 100‐12‐122 ‐   General Fund‐City  Manager‐ Sustainability  Division                            ‐                        ‐ Transferred Transferred to Public Works 100‐81‐ 122 750.019 in FY24 FY21 Administration 122  Sustainability Division 750.069 ‐ Sustainable Infrastructure Audit 100‐12‐122 ‐   General Fund‐City  Manager‐ Sustainability  Division                            ‐                        ‐ Transferred n/a Transferred to Public Works 100‐81‐ 122 750.069 in FY24 FY20 Administration 632  Comm Outreach & Neigh Watch 750.056 ‐ Neighborhood Engagement 100‐12‐632 ‐   General Fund‐City  Manager‐Comm  Outreach & Neigh  Watch                 64,405                        ‐ In Progress 10/2024 FY24 Administration 632  Comm Outreach & Neigh Watch 750.227 ‐ CWP License Plate Readers 100‐12‐632 ‐   General Fund‐City  Manager‐Comm  Outreach & Neigh  Watch                 10,000                        ‐ In Progress 10/2024 The $10,000 is allocated for Block  Leader enhancements. Staff will  correct this to CWP ‐ Public Safety in  residential/commercial areas for  transparency and visibility. FY24 Administration 633  Disaster Preparedness 750.230 ‐ Business Continuity Resilience 100‐12‐633 ‐   General Fund‐City  Manager‐Disaster  Preparedness               500,000                        ‐ Not Started The $500k for disaster preparedness  is on hold until a permanent EOC is  identified.  FY23 Administration 633  Disaster Preparedness 750.240 ‐ MRC Rise 100‐12‐633 ‐   General Fund‐City  Manager‐Disaster  Preparedness                   6,323                        ‐ In Progress 3/2024 Special Project from transfer from  materials FY22 Administration 705  Economic Development 750.103 ‐ CWP Regulate Diversified Retail 100‐12‐705 ‐   General Fund‐City  Manager‐ Economic  Development                   5,000                        ‐ Pending Recommended Service Level  Reduction (Potential Cancellation of  this item) FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY23 Administration 705  Economic Development 750.179 ‐ Econ Dev Strategy Outreach 100‐12‐705 ‐   General Fund‐City  Manager‐ Economic  Development                 20,000                        ‐ Pending Recommended Service Level  Reduction (Potential Cancellation of  this item) FY23 Administration 705  Economic Development 750.221 ‐ CWP Cupertino Store  Implementation 100‐12‐705 ‐   General Fund‐City  Manager‐ Economic  Development                            ‐                     62 Completed Unanticipated close out expense FY24 Administration 705  Economic Development 750.230 ‐ Business Continuity Resilience 100‐12‐705 ‐   General Fund‐City  Manager‐ Economic  Development               485,000                        ‐ In Progress 7/2024 FY22 Administration 122  Sustainability Division 750.106 ‐ Electric Cooking Workshop  Series 100‐12‐122 ‐   General Fund‐City  Manager‐ Sustainability  Division                            ‐                        ‐ Transferred 6/30/2024 Transferred to Public Works 100‐81‐ 122 750.106 in FY24 FY24 Administration 122  Sustainability Division 750.176 ‐ Climate AP Vision Summary Doc 100‐12‐122 ‐   General Fund‐City  Manager‐ Sustainability  Division                            ‐                        ‐ Transferred 6/30/2025 Transferred to Public Works 100‐18‐ 122 750.176 in FY24 FY24 Administration 122  Sustainability Division 750.223 ‐ CWP Electrification Study 100‐12‐122 ‐   General Fund‐City  Manager‐ Sustainability  Division                            ‐                        ‐ Transferred 6/30/2024 Transferred to Public Works 100‐81‐ 122 750.223 in FY24 FY23 Administrative  services 405  Accounting 750.189 ‐ Fee Study 100‐41‐405 ‐   General Fund‐ Finance‐ Accounting                 70,800             41,800 In Progress 2/2024 FY23 Administrative  services 426  Budgeting 750.217 ‐ CWP Analyze Potential Rev  Measrs 100‐41‐426 ‐   General Fund‐ Finance‐ Budgeting                 42,450                        ‐ In Progress 2/2024 FY23 Community  development 700  Community Development Admin 750.104 ‐ CWP Homeless Jobs Program 100‐70‐700 ‐   General Fund‐ Planning &  Community  Development‐ Community  Development  Admin               176,935             46,604 In Progress 6/30/2024 For FY 2023‐24, the Homeless Jobs  Program did not receive funding in  the CWP, but was allowed to  continue operating with leftover  funds from prior years. It is on the  list to be reconsidered for the FY  2024‐25 CWP, and was  recommended to be continued by  the Housing Commission in their  CWP recommendations.  FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY17 Community  development 701  Current Planning 750.007 ‐ The Hamptons 100‐71‐701 ‐   General Fund‐ Planning‐Current  Planning               108,640                        ‐ Not Started Waiting for building submittal.  Project approval expires in 2026 FY21 Community  development 701  Current Planning 750.009 ‐ Marina Plaza 100‐71‐701 ‐   General Fund‐ Planning‐Current  Planning                 23,317                        ‐ In Progress ongoing Waiting for building permit. FY22 Community  development 701  Current Planning 750.029 ‐ Vallco SB35/Rise 100‐71‐701 ‐   General Fund‐ Planning‐Current  Planning               188,680                        ‐ In Progress ongoing Waiting for building permit. FY20 Community  development 702  Mid Long Term Planning 750.032 ‐ General Plan 100‐71‐702 ‐   General Fund‐ Planning‐Mid  Long Term  Planning               239,805                        ‐ In Progress ongoing Operational item, no completion  date FY20 Community  development 702  Mid Long Term Planning 750.049 ‐ MuniCode Updates 100‐71‐702 ‐   General Fund‐ Planning‐Mid  Long Term  Planning                 25,000                        ‐ In Progress 11/2024 Project delayed due to COVID and  department turnover.  FY17 Community  development 702  Mid Long Term Planning 750.090 ‐ Residential/Mixed Use Design 100‐71‐702 ‐   General Fund‐ Planning‐Mid  Long Term  Planning               202,216                5,147 In Progress 12/2024 Delays in project due to previous  contractor/consultant and housing  element. FY22 Community  development 702  Mid Long Term Planning 750.101 ‐ CWP RHNA and Gen Plan Update 100‐71‐702 ‐   General Fund‐ Planning‐Mid  Long Term  Planning           1,026,581           330,914 In Progress Spring/Summer  2024 Pending State of California Housing  and Community Development  Department adoption of Housing  Element. FY22 Community  development 702  Mid Long Term Planning 750.135 ‐ Laserfiche planning map  scanning 100‐71‐702 ‐   General Fund‐ Planning‐Mid  Long Term  Planning                   3,990                   923 In Progress Winter 2024 Ongoing operational item. FY24 Community  development 702  Mid Long Term Planning 750.235 ‐ CWP Tree List 100‐71‐702 ‐   General Fund‐ Planning‐Mid  Long Term  Planning                 50,000                        ‐ In Progress August 2024 FY20/FY22 Community  development 711  BMR Affordable Housing Fund 750.051 ‐ Support for the Unhoused 265‐72‐711 ‐   BMR Housing‐ Housing Services‐ BMR Affordable  Housing Fund               100,000                        ‐ In Progress Pending budget depletion. $50k will  be defunded in Q3 to true up to the  required County match. No  completion date. FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY20 Community  development 711  BMR Affordable Housing Fund 750.052 ‐ Develop ELI Housing 265‐72‐711 ‐   BMR Housing‐ Housing Services‐ BMR Affordable  Housing Fund               238,386                        ‐ In Progress Pending development of Mary Ave,  then operational. FY19 Community  development 713  General Building 750.036 ‐ Ongoing Bldg Recrd  scan/conversn 100‐73‐713 ‐   General Fund‐ Building‐General  Building                 14,387                        ‐ In Progress Winter 2024 Ongoing operational item. FY22 Community  development 714  Construction Plan Check 750.031 ‐ Westport 100‐73‐714 ‐   General Fund‐ Building‐ Construction Plan  Check                 98,739                5,285 In Progress 2026 Pending building permit status. The  timeline is uncertain however staff  estimates the townhome portion  should be completed/occupied by  end of this year. The Senior BMR  apartments should be occupied by  Spring 2025. The assisted living  parcel will be submitting revisions by  2026. FY20 Community  development 714  Construction Plan Check 750.067 ‐ VTC 100‐73‐714 ‐   General Fund‐ Building‐ Construction Plan  Check         14,595,179                        ‐ In Progress This pertains to building permits and  staff estimates that the developer  will submit additional building  permits in 2024. FY20 Community  development 715  Building Inspection 750.067 ‐ VTC 100‐73‐715 ‐   General Fund‐ Building‐Building  Inspection           5,406,634                        ‐ Not Started This pertains to building inspections.  No construction has been  completed, and will occur over the  build‐out of the project at least 5  years. FY23 Information Services 300  Administration 750.197 ‐ Aclima & Envirosuite Pilot Ext 610‐30‐300 ‐   Innovation &  Technology‐I&T  Administration‐ Administration                 66,000                        ‐ Completed 8/15/2023 Funds have been encumbered and  awaiting invoices. FY23 Information Services 300  Administration 750.222 ‐ CWP Cybersecurity Public Edu 610‐30‐300 ‐   Innovation &  Technology‐I&T  Administration‐ Administration                   7,500                1,317 Completed 9/16/2023 Recommended to be defunded in  Q3. FY23 Information Services 300  Administration 750.227 ‐ CWP License Plate Readers 610‐30‐300 ‐   Innovation &  Technology‐I&T  Administration‐ Administration                            ‐                        ‐ Transferred Transferred to Law Enforcement 100‐ 20‐200 750.227 in FY24 and was  renamed CWP Block Leader  Enhancements. Staff will correct this  to CWP ‐ Public Safety in  residential/commercial areas for  transparency and visibility. FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY20 Information Services 305  Video 900.945 ‐ Fixed Asset Acquisition 100‐31‐305 ‐   General Fund‐I&T  Video‐Video                 40,316                        ‐ In Progress 6/30/2024 This account was added in FY20 to  account for Video fixed assets  acquisitions. These purchases vary  from year and were added to special  projects for visibility and to maintain  ongoing material and contract  trendlines. FY20 Information Services 305  Video 900.995 ‐ Special Projects ‐ CDD/I&T 100‐31‐305 ‐   General Fund‐I&T  Video‐Video                 40,891                8,215 Completed 9/30/2023 Projects delayed due to COVID and  will be defunded in Q3 with savings  due to descaling a project at Quinlan. FY22 Information Services 308  Applications 750.120 ‐ Performance Management App 100‐32‐308 ‐   General Fund‐I&T  Applications‐ Applications                 32,000                        ‐ Cancelled Recommended to be defunded in  Q3. FY22 Information Services 308  Applications 750.123 ‐ Redesign of City Website 100‐32‐308 ‐   General Fund‐I&T  Applications‐ Applications                 20,700                2,719 In Progress 10/30/2024 FY23 Information Services 308  Applications 750.181 ‐ ERP (Phase II) 100‐32‐308 ‐   General Fund‐I&T  Applications‐ Applications                 94,076             24,910 Pending Recommended Service Level  Reduction (Potential Cancellation of  this item) FY23 Information Services 308  Applications 750.183 ‐ ACA Guide & Wrapper 100‐32‐308 ‐   General Fund‐I&T  Applications‐ Applications                 25,000                        ‐ In Progress 6/30/2024 FY23 Information Services 308  Applications 750.184 ‐ Accela Roadmap 100‐32‐308 ‐   General Fund‐I&T  Applications‐ Applications                 23,000                        ‐ In Progress 6/30/2024 FY23 Information Services 308  Applications 750.186 ‐ Consolidated Code Enf Services 100‐32‐308 ‐   General Fund‐I&T  Applications‐ Applications                 22,408             22,133 Completed 2/27/2024 FY21 Information Services 308  Applications 750.236 ‐ Project Dox 100‐32‐308 ‐   General Fund‐I&T  Applications‐ Applications               129,475             90,820 In Progress 6/30/2024 FY24 Information Services 308  Applications 750.237 ‐ ERP (Phase III) 100‐32‐308 ‐   General Fund‐I&T  Applications‐ Applications               450,000                        ‐ Pending Recommended Service Level  Reduction (Potential Cancellation of  this item) FY22 Information Services 310  Infrastructure 750.107 ‐ Security Framework and Audit 610‐34‐310 ‐   Innovation &  Technology‐I&T  Infrastructure‐ Infrastructure                 60,000             18,938 In Progress 6/30/2024 FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY22 Information Services 310  Infrastructure 750.124 ‐ ActiveNet Additional Readers 610‐34‐310 ‐   Innovation &  Technology‐I&T  Infrastructure‐ Infrastructure                   9,000             10,999 Completed 2/28/2024 FY22 Information Services 310  Infrastructure 750.125 ‐ Council Voting System and Timer 610‐34‐310 ‐   Innovation &  Technology‐I&T  Infrastructure‐ Infrastructure                 32,000                        ‐ Cancelled Recommended to defund in Q3.  Vendor did not provide a SaaS  solution. FY22 Information Services 310  Infrastructure 750.130 ‐ Senior Center Access Controls 610‐34‐310 ‐   Innovation &  Technology‐I&T  Infrastructure‐ Infrastructure                            ‐                        ‐ Transferred 6/30/2024 Transferred to Facilities 100‐87‐831  750.025 in FY 24 FY22 Information Services 310  Infrastructure 750.171 ‐ Quinlan Touch Screen 610‐34‐310 ‐   Innovation &  Technology‐I&T  Infrastructure‐ Infrastructure                 25,130                   321 Cancelled FY23 Information Services 310  Infrastructure 750.199 ‐ City Facilities Video Capture 610‐34‐310 ‐   Innovation &  Technology‐I&T  Infrastructure‐ Infrastructure                   6,079                        ‐ In Progress 6/30/2024 FY23 Information Services 310  Infrastructure 750.200 ‐ CH Ent Server & Storage Tech  Ref 610‐34‐310 ‐   Innovation &  Technology‐I&T  Infrastructure‐ Infrastructure               150,000           150,000 Completed 2/28/2024 FY23 Information Services 310  Infrastructure 750.203 ‐ Suppl Wi‐Fi Exp in Public Areas 610‐34‐310 ‐   Innovation &  Technology‐I&T  Infrastructure‐ Infrastructure                   4,625                        ‐ Pending Recommended Service Level  Reduction (Potential Cancellation of  this item) FY23 Information Services 310  Infrastructure 750.205 ‐ Public Bike Smart Rack DockTech 610‐34‐310 ‐   Innovation &  Technology‐I&T  Infrastructure‐ Infrastructure                   2,000                        ‐ Cancelled Recommended to be defunded in  Q3. FY18 Information Services 310  Infrastructure 900.945 ‐ Fixed Asset Acquisition 610‐34‐310 ‐   Innovation &  Technology‐I&T  Infrastructure‐ Infrastructure                 40,037                        ‐ In Progress 6/30/2024 This account was added in FY18 to  account for IT fixed assets  acquisitions.  These purchases vary  from year and were added to special  projects for visibility and to maintain  ongoing material and contract  trendlines. FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY22 Information Services 986  GIS 750.166 ‐ AR McClellan Ranch 610‐35‐986 ‐   Innovation &  Technology‐I&T  GIS‐GIS                 26,667                2,000 In Progress 4/30/2024 FY23 Information Services 986  GIS 750.207 ‐ Additional Telematics Devices 610‐35‐986 ‐   Innovation &  Technology‐I&T  GIS‐GIS                   5,300                5,300 Completed 7/30/2023 FY24 Information Services 986  GIS 750.211 ‐ Drone Instructor Training 610‐35‐986 ‐   Innovation &  Technology‐I&T  GIS‐GIS                       775                   775 Completed 8/30/2023 FY23 Information Services 986  GIS 750.212 ‐ Laserfiche Scanning 610‐35‐986 ‐   Innovation &  Technology‐I&T  GIS‐GIS                 22,415             15,591 In Progress 4/30/2024 FY22 Information Services 986  GIS 750.216 ‐ CIP Management System 610‐35‐986 ‐   Innovation &  Technology‐I&T  GIS‐GIS                 10,740                8,405 In Progress 3/30/2024 FY24 Information Services 986  GIS 750.238 ‐ VR Decarb 610‐35‐986 ‐   Innovation &  Technology‐I&T  GIS‐GIS               112,000                        ‐ In Progress 5/30/2024 FY23 Law enforcement 200  Law Enforcement SC Sherif 750.227 ‐ CWP Block Leader  Enhancements 100‐20‐200 ‐   General Fund‐Law  Enforcement‐Law  Enforcement SC  Sherif                 60,000                        ‐ In Progress 10/2024 The $60,000 is allocated for the  license plate readers. Transferred  from Information Services 610‐30‐ 300 750.227 in FY24 and was  renamed CWP Block Leader  Enhancements. Staff will correct this  to CWP ‐ Public Safety in  residential/commercial areas for  transparency and visibility.  FY19 Public works 122  Sustainability Division 750.018 ‐ Climate Action Plan 100‐81‐122 ‐   General Fund‐ Environmental  Programs‐ Sustainability  Division                   1,236                        ‐ Completed 10/2023 Transferred from Administration 100‐ 12‐122 750.018 in FY 24. Remaining  amount to be defunded at Q3. FY19 Public works 122  Sustainability Division 750.019 ‐ Employee Commute Program 100‐81‐122 ‐   General Fund‐ Environmental  Programs‐ Sustainability  Division                   2,586                4,618 Completed 10/2023 Transferred from Administration 100‐ 12‐122 750.018 in FY 24. Remaining  amount to be defunded at Q3.  Project went over budget due to  claims exceeding projected budget  and will be covered with budget  savings. Program is discontinued. FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY21 Public works 122  Sustainability Division 750.069 ‐ Sustainable Infrastructure Audit 100‐81‐122 ‐   General Fund‐ Environmental  Programs‐ Sustainability  Division                 10,000                        ‐ Not Started N/A Transferred from Administration 100‐ 12‐122 750.069 in FY24. This project will most likely not move  forward. Recommended to defund in  Q3. FY22 Public works 122  Sustainability Division 750.106 ‐ Electric Cooking Workshop  Series 100‐81‐122 ‐   General Fund‐ Environmental  Programs‐ Sustainability  Division                   6,400                        ‐ In Progress 6/30/2024 Transferred from Administration 100‐ 12‐122 750.106 in FY24. FY24 Public works 122  Sustainability Division 750.176 ‐ Climate AP Vision Summary Doc 100‐81‐122 ‐   General Fund‐ Environmental  Programs‐ Sustainability  Division                 10,000                        ‐ In Progress 6/30/2025 Transferred from Administration 100‐ 12‐122 750.176 in FY 24. FY24 Public works 122  Sustainability Division 750.223 ‐ CWP Electrification Study 100‐81‐122 ‐   General Fund‐ Environmental  Programs‐ Sustainability  Division                 50,000                        ‐ In Progress 6/30/2024 Transferred from Administration 100‐ 12‐122 750.223 in FY24. FY21 Public works 800  Public Works Admin 750.071 ‐ Municipal Water System 100‐80‐800 ‐   General Fund‐PW  Administration‐ Public Works  Admin                 22,677             11,846 In Progress 8/1/2024 FY24 Public works 801  Resources Recovery 750.041 ‐ HHW and PaintCare 520‐81‐801 ‐   Resource  Recovery‐ Environmental  Programs‐ Resources  Recovery               115,733             70,456 In Progress Ongoing  annual project No completion date FY21 Public works 801  Resources Recovery 750.084 ‐ Single Use Plastics Ordinance 520‐81‐801 ‐   Resource  Recovery‐ Environmental  Programs‐ Resources  Recovery                 84,716             34,764 In Progress 6/30/2025 FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY22 Public works 801  Resources Recovery 750.137 ‐ SB1383 Procurement  Requirements 520‐81‐801 ‐   Resource  Recovery‐ Environmental  Programs‐ Resources  Recovery               112,742                        ‐ In Progress Ongoing  annual project No completion date FY22 Public works 801  Resources Recovery 750.174 ‐ New Lndfill Agrmnt/Solid Wst  con 520‐81‐801 ‐   Resource  Recovery‐ Environmental  Programs‐ Resources  Recovery               245,697           161,452 In Progress 8/31/2025 FY23 Public works 802  Non Point Source 750.196 ‐ Storm Water (SWPPP) Update 230‐81‐802 ‐  Env  Mgmt Cln Crk  Strm Drain‐ Environmental  Programs‐Non  Point Source                 19,539                        ‐ Completed 3/2023 Remaining amount will be defunded  in Q3.  FY19 Public works 804  Plan Review 750.039 ‐ PW Scanning Project 100‐82‐804 ‐   General Fund‐ Developmental  Services‐Plan  Review                 39,713             21,129 In Progress 6/30/2024 FY20 Public works 804  Plan Review 750.067 ‐ VTC 100‐82‐804 ‐   General Fund‐ Developmental  Services‐Plan  Review           1,961,366                        ‐ In Progress This pertains to plan review and  occurs prior to permit issuance with  the City awaiting the latest plan  submittal. FY22 Public works 804  Plan Review 750.105 ‐ CWP Revisit 5G 100‐82‐804 ‐   General Fund‐ Developmental  Services‐Plan  Review               250,000                        ‐ In Progress 9/30/2024 Most of the work to date has been  completed in‐house. Ongoing  changes to related laws, limited  staffing resources, and other  priorities have resulted in delays to  finalization. FY20 Public works 807  Service Center Administration 750.043 ‐ Office Reconfiguration 100‐83‐807 ‐   General Fund‐ Service Center‐ Service Center  Administration               189,861             50,445 In Progress Ongoing  annual project This an ongoing allocation that was  added in FY20 to account for the  various office reconfigurations need  as a result aging City facilities to help  mitigate space issues. FY23 Public works 808  McClellan Ranch Park 750.025 ‐ Special Maintenance 100‐84‐808 ‐   General Fund‐ Grounds‐ McClellan Ranch  Park                 70,000                        ‐ Pending 2026 McClellan Bridge repair not started  due to time and staffing. Quotes in  progress. Awaiting preliminary  assessment on McClellan Bridge. FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY22 Public works 808  McClellan Ranch Park 750.138 ‐ 4H Perimeter Fence  Replacement 100‐84‐808 ‐   General Fund‐ Grounds‐ McClellan Ranch  Park                 30,000             24,600 Completed 9/20/2023 Remaining amount will be defunded  in Q3. FY20 Public works 812  School Site Maintenance 750.025 ‐ Special Maintenance 100‐84‐812 ‐   General Fund‐ Grounds‐School  Site Maintenance                 20,000                        ‐ In Progress 6/30/2024 This account is used for various one‐ time maintenance projects that vary  from year to year.  This account was  added FY20 to provide visibility to  one‐time project costs that vary from  year to year to assist in showing  baseline expenses only in materials  and/or contracts. FY21 Public works 813  Neighborhood Parks 750.074 ‐ Tot Lot Rubber Resurfacing 100‐84‐813 ‐   General Fund‐ Grounds‐ Neighborhood  Parks                 17,824                        ‐ In Progress 6/30/2024 Tot lot rubber resurfacing 3  completed June 2022 & May 2023, 1  in progress (Portal Park) FY22 Public works 813  Neighborhood Parks 750.141 ‐ Basketball Court Resurfacing 100‐84‐813 ‐   General Fund‐ Grounds‐ Neighborhood  Parks                 20,000             20,000 Completed 12/2023 FY17 Public works 813  Neighborhood Parks 900.990 ‐ Special Projects ‐ PW 100‐84‐813 ‐   General Fund‐ Grounds‐ Neighborhood  Parks                 25,000             24,100 Completed 9/2023 This account is used for various l one‐ time maintenance projects that vary  from year to year.  This account was  added FY17 to provide visibility to  one‐time project costs that vary from  year to year to assist in showing  baseline expenses only in materials  and/or contracts. Portal Park  concrete replacement is completed. FY22 Public works 814  Sport Fields Jollyman CRK 750.140 ‐ Backflow Prevention Device Repl 100‐84‐814 ‐   General Fund‐ Grounds‐Sport  Fields Jollyman  CRK                   4,000                        ‐ In Progress 6/30/2024 FY22 Public works 814  Sport Fields Jollyman CRK 750.141 ‐ Basketball Court Resurfacing 100‐84‐814 ‐   General Fund‐ Grounds‐Sport  Fields Jollyman  CRK                 10,000             10,000 Completed 12/2023 FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY19 Public works 820  Sidewalk Curb and Gutter 750.020 ‐ Annual Sidewalk Curb & Gutter 270‐85‐820 ‐   Transportation  Fund‐Streets‐ Sidewalk Curb  and Gutter           2,868,400           724,222 In Progress 6/30/2025 This is annual pavement  maintenance and was added in  special projects for visibility and  reporting.  FY13?Public works 821  Street Pavement Maintenance 900.921 ‐ Annual Asphalt Project 270‐85‐821 ‐   Transportation  Fund‐Streets‐ Street Pavement  Maintenance           5,600,754             14,370 In Progress Ongoing  annual project This is annual pavement  maintenance and was added in  special projects for visibility and  reporting.   This is in a dedicated account for SB1  reporting.  Should be removed from  this list beginning in FY25. FY23 Public works 824  Overpasses and Medians 750.194 ‐ Trench Work 100‐86‐824 ‐   General Fund‐ Trees and Right of  Way‐Overpasses  and Medians                 40,000                        ‐ Pending Recommended to defund in Q3.  FY24 Public works 825  Street Tree Maintenance 750.235 ‐ CWP Tree List 100‐86‐825 ‐   General Fund‐ Trees and Right of  Way‐Street Tree  Maintenance                 60,000                        ‐ In Progress 6/30/2024 Collaborating with CDD FY13?Public works 825  Street Tree Maintenance 900.911 ‐ Trees and Badges 100‐86‐825 ‐   General Fund‐ Trees and Right of  Way‐Street Tree  Maintenance                 16,263                   325 In Progress Ongoing  annual project This is annual tree badges program  and was added in special projects for  visibility. FY22 Public works 827  Bldg Maint City Hall 750.144 ‐ Electrical Preventive Maint 100‐87‐827 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  City Hall                 25,000                        ‐ Completed 2023 Remaining amount will be defunded  in Q3. Work was completed. OK to  remove, defund as close out this line  as we now budget electrical  preventative maintenance in base.  FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY19 Public works 828  Bldg Maint Library 750.025 ‐ Special Maintenance 100‐87‐828 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  Library                 45,000                        ‐ In Progress 6/30/2024 This account is used for various one‐ time maintenance projects that vary  from year to year.  This account was  added FY19 to provide visibility to  one‐time project costs that vary from  year to year to assist in showing  baseline expenses only in materials  and/or contracts. FY23 Public works 829  Bldg Maint Service Center 750.025 ‐ Special Maintenance 100‐87‐829 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  Service Center                 40,000                        ‐ In Progress 6/30/2024 FY15 Public works 829  Bldg Maint Service Center 900.990 ‐ Special Projects ‐ PW 100‐87‐829 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  Service Center               233,963                        ‐ Pending 4/2024 This account is used for various l one‐ time maintenance projects that vary  from year to year.  This account was  added FY16 to provide visibility to  one‐time project costs that vary from  year to year to assist in showing  baseline expenses only in materials  and/or contracts. Awaiting delivery  of materials. FY20 Public works 830  Bldg Maint Quinlan Center 750.025 ‐ Special Maintenance 100‐87‐830 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  Quinlan Center                 85,000                        ‐ In Progress 6/30/2024 This account is used for various one‐ time maintenance projects that vary  from year to year.  This account was  added FY20 to provide visibility to  one‐time project costs that vary from  year to year to assist in showing  baseline expenses only in materials  and/or contracts. FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY23 Public works 831  Bldg Maint Senior Center 750.025 ‐ Special Maintenance 100‐87‐831 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  Senior Center               121,675                        ‐ Not Started 6/30/2025 This account is used for various one‐ time maintenance projects that vary  from year to year.  This account was  added FY20 to provide visibility to  one‐time project costs that vary from  year to year to assist in showing  baseline expenses only in materials  and/or contracts. Senior Center  Access Controls 750.130 ($16,000)  was transferred from Information  Services. Roof repair, deck dry rot  repair, AC replacement ‐ not started  due to lack of staffing, need for  multiple quotes and multiple vendor  contracts FY23 Public works 831  Bldg Maint Senior Center 900.945 ‐ Fixed Asset Acquisition 100‐87‐831 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  Senior Center                 65,835             65,259 Completed 11/2023 FY19 Public works 832  Bldg Maint McClellan Ranch 750.025 ‐ Special Maintenance 100‐87‐832 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  McClellan Ranch               101,347                        ‐ In Progress 6/30/2024 This account is used for various one‐ time maintenance projects that vary  from year to year.  This account was  added FY19 to provide visibility to  one‐time project costs that vary from  year to year to assist in showing  baseline expenses only in materials  and/or contracts. FY23 Public works 834  Bldg Maint Wilson 750.025 ‐ Special Maintenance 100‐87‐834 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  Wilson                   7,000                        ‐ Not Started 6/30/2024 Project to start in 2/2024.   FY23 Public works 836  Bldg Maint Sports Center 750.025 ‐ Special Maintenance 570‐87‐836 ‐   Sports Center‐ Facilities and  Fleet‐Bldg Maint  Sports Center                 50,494                6,789 In Progress 6/30/2024 HVAC is the only project left FY22 Public works 836  Bldg Maint Sports Center 750.157 ‐ Door Refinishing 570‐87‐836 ‐   Sports Center‐ Facilities and  Fleet‐Bldg Maint  Sports Center                 10,775             14,337 Completed 10/2023 Budget savings used to cover the  overbudget. FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY16 Public works 836  Bldg Maint Sports Center 900.990 ‐ Special Projects ‐ PW 570‐87‐836 ‐   Sports Center‐ Facilities and  Fleet‐Bldg Maint  Sports Center                            ‐                       ‐ Completed FY24 Public works 837  Bldg Maint Creekside 750.025 ‐ Special Maintenance 100‐87‐837 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  Creekside                 12,000                        ‐ Completed 11/2023 Expensed to 900.990 GL account,  budget transfer will be initiated to  complete transaction. FY16 Public works 837  Bldg Maint Creekside 900.990 ‐ Special Projects ‐ PW 100‐87‐837 ‐   General Fund‐ Facilities and  Fleet‐Bldg Maint  Creekside                            ‐                       ‐ Completed 11/2023 FY23 Public works 841  BBF Facilities Maintenance 750.025 ‐ Special Maintenance 100‐87‐841 ‐   General Fund‐ Facilities and  Fleet‐BBF  Facilities  Maintenance                 25,000                        ‐ In Progress Ongoing Maint  as needed  Blesch, Byrne and Stocklmeir Maint  as needed FY16 Public works 841  BBF Facilities Maintenance 900.990 ‐ Special Projects ‐ PW 100‐87‐841 ‐   General Fund‐ Facilities and  Fleet‐BBF  Facilities  Maintenance                            ‐                6,803 Completed 7/2023 This account is used for various l one‐ time maintenance projects that vary  from year to year. This account was  added FY16 to provide visibility to  one‐time project costs that vary from  year to year to assist in showing  baseline expenses only in materials  and/or contracts. Expenses are  located in fixed assets. Expensed to  900.990 GL account, budget transfer  will be initiated to complete  transaction. FY23 Public works 844  Traffic Engineering 750.040 ‐ Planned Transportation Project 100‐88‐844 ‐   General Fund‐ Transportation‐ Traffic  Engineering                 56,023             16,025 In Progress 6/30/2024 FY20 Public works 844  Traffic Engineering 750.061 ‐ Community Shuttle Pilot  Program 100‐88‐844 ‐   General Fund‐ Transportation‐ Traffic  Engineering                 10,574                        ‐ Completed 6/30/23 Remaining amount will be defunded  in Q3. FY21 Public works 844  Traffic Engineering 750.079 ‐ Adaptive Traffic Signaling 100‐88‐844 ‐   General Fund‐ Transportation‐ Traffic  Engineering                 18,443             12,473 Completed 8/2023 Remaining amount will be defunded  in Q3. FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY22 Public works 844  Traffic Engineering 750.163 ‐ VMT to LOS Standards 100‐88‐844 ‐   General Fund‐ Transportation‐ Traffic  Engineering               130,000                        ‐ In Progress 6/30/2025 FY23 Public works 844  Traffic Engineering 750.219 ‐ CWP Bicycle Facilities 100‐88‐844 ‐   General Fund‐ Transportation‐ Traffic  Engineering                 50,000                        ‐ In Progress 6/30/2024 This has started although no money  has been spent.  There have been  several meetings with the BPC, and  most recently staff has been working  on completing an MOU with the  Rotary to partner on the installation  of bike racks on private property.   The MOU has now been executed  and meetings are ongoing between  staff, Rotary, and BPC subcommittee  to finalize bike rack installation  locations.  Once locations are  finalized, the division of labor  regarding installation will be  determined and the bike racks  purchased and installed. FY23 Public works 844  Traffic Engineering 750.231 ‐ SC Corridor Vision Study 100‐88‐844 ‐   General Fund‐ Transportation‐ Traffic  Engineering               154,079                        ‐ In Progress 6/30/2025 FY23 Public works 844  Traffic Engineering 750.242 ‐ AC2 Traffic Monitoring 100‐88‐844 ‐   General Fund‐ Transportation‐ Traffic  Engineering                            ‐             27,033 In Progress 6/30/2025 Budgeted funds will be transferred  here from 100‐88‐844 900.923.  FY17 Public works 844  Traffic Engineering 900.923 ‐ Apple Campus 2 100‐88‐844 ‐   General Fund‐ Transportation‐ Traffic  Engineering                 77,340                        ‐ Completed 6/30/2025 Budgeted in incorrect GL account,  departments will initiate a transfer  to correct to 100‐88‐844 750.242.  This is a development project that  spanned several years.  It was added  a special project to provide visability  and to maintain relevent baseline  expenses in materials and contracts. FY23 Public works 844  Traffic Engineering 900.964 ‐ I‐280/Wolfe Rd Interchange  Imprv 100‐88‐844 ‐   General Fund‐ Transportation‐ Traffic  Engineering               800,000           800,000 In Progress Est. completion  date unknown  as the project  is with VTA Originally budgeted in 750‐040 and  transferred to Capital Outlay  Account 100‐88‐844 900‐964.  Advanced payment made to VTA for  the City's portion. FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY21 Public works 845  Traffic Signal Maintenance 750.079 ‐ Adaptive Traffic Signaling 100‐88‐845 ‐   General Fund‐ Transportation‐ Traffic Signal  Maintenance                 16,042                        ‐ Completed 10/4/2023 Remaining amount will be defunded  in Q3. FY24 Public works 845  Traffic Signal Maintenance 900.945 ‐ Fixed Asset Acquisition 100‐88‐845 ‐   General Fund‐ Transportation‐ Traffic Signal  Maintenance                            ‐             41,529 Completed 7/10/2023 Expensed to 900.945 GL account,  budget transfer will be initiated to  complete transaction. FY21 Public works 846  Safe Routes 2 School 750.080 ‐ Pedestrian Education 100‐88‐846 ‐   General Fund‐ Transportation‐ Safe Routes 2  School                 10,118             10,118 Completed 11/2023 FY15 Public works 848  Street Lighting 900.990 ‐ Special Projects ‐ PW 100‐85‐848 ‐   General Fund‐ Streets‐Street  Lighting               230,000           171,163 In Progress 8/30/2024 This account is used for various l one‐ time maintenance projects that vary  from year to year.  This account was  added FY16 to provide visibility to  one‐time project costs that vary from  year to year to assist in showing  baseline expenses only in materials  and/or contracts. FY24 Public works 853  Storm Drain Fee 750.062 ‐ Permeable Pavement 230‐81‐853 ‐  Env  Mgmt Cln Crk  Strm Drain‐ Environmental  Programs‐Storm  Drain Fee                            ‐                       ‐ Completed Defunded by council at FY24 Q1 FY23 Public works 853  Storm Drain Fee 750.063 ‐ Rainwater Capture 230‐81‐853 ‐  Env  Mgmt Cln Crk  Strm Drain‐ Environmental  Programs‐Storm  Drain Fee                 47,719             12,369 In Progress Ongoing  annual project No completion date FY23 Public works 854  General Fund Subsidy 750.064 ‐ Low Income Cost Share 230‐81‐854 ‐  Env  Mgmt Cln Crk  Strm Drain‐ Environmental  Programs‐General  Fund Subsidy                 13,162                    (52) In Progress Ongoing  annual project No completion date. Payments were  voided as checks were not cashed. FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY23 Public works 854  General Fund Subsidy 750.065 ‐ CUSD Joint Use Cost Share 230‐81‐854 ‐  Env  Mgmt Cln Crk  Strm Drain‐ Environmental  Programs‐General  Fund Subsidy                   8,706                        ‐ In Progress Ongoing  annual project No completion date FY24 Public works 855  Storm Drain Maintenance 900.945 ‐ Fixed Asset Acquisition 230‐81‐855 ‐  Env  Mgmt Cln Crk  Strm Drain‐ Environmental  Programs‐Storm  Drain  Maintenance               131,000           128,895 Completed 12/2023 Rover storm drain camera purchase FY09 Public works 985  Fixed Assets Acquisition 900.945 ‐ Fixed Asset Acquisition 630‐90‐985 ‐   Vehicle/Equip  Replacement ‐ Citywide ‐ Non  Departmental‐ Fixed Assets  Acquisition           1,264,468           130,222 In Progress Ongoing  annual project This is annual acquisitions of vehicle  and equipment and was added in  special projects for visibility.   FY22 Recreation services 601  Rec & Comm Svcs Administration 750.098 ‐ CWP Senior Strategy 100‐60‐601 ‐   General Fund‐ Administration‐ Rec & Comm Svcs  Administration                 41,378                     32 In Progress 6/30/2024 Senior Survey Assessment FY22 Recreation services 601  Rec & Comm Svcs Administration 750.164 ‐ CWP Dogs Off Leash Area 100‐60‐601 ‐   General Fund‐ Administration‐ Rec & Comm Svcs  Administration                   5,000                   123 In Progress 6/30/2024 FY23 Recreation services 601  Rec & Comm Svcs Administration 750.226 ‐ CWP Intergenerational  Engagement 100‐60‐601 ‐   General Fund‐ Administration‐ Rec & Comm Svcs  Administration                            ‐                       ‐ Completed June 2023 FY24 Recreation services 601  Rec & Comm Svcs Administration 750.241 ‐ CWP Senior Svcs & Youth  Engagement 100‐60‐601 ‐   General Fund‐ Administration‐ Rec & Comm Svcs  Administration                 20,000                   239 In Progress 6/30/2024 FY 2023-24 Mid-Year Special Projects FY Added Function Program Base And Detail Account With Detail  Description Full Org Set Code  And Description  Amended  Budget   Actual  Amount  Status Estimated  Complete Notes (e.g., carried over to next  fiscal year) FY15 Recreation services 621  Sports Center Operation 900.959 ‐ Windscreens 570‐63‐621 ‐   Sports Center‐ Sports, Safety and  Outdoor Rec‐ Sports Center  Operation                 72,853             72,162 Completed September  2023 From:Santosh Rao To:City Council; Pamela Wu; Matt Morley; City Clerk Subject:Urgent Appeal: Reconsideration of FY 23-25 City Work Program Projects Date:Tuesday, April 2, 2024 7:54:42 PM CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Subject: Urgent Appeal: Reconsideration of FY 23-25 City Work Program Projects [CC: City Clerk] Dear Mayor Sheila, Esteemed Cupertino City Council Members, and City Manager Wu, I am compelled to address the current proposal for ongoing projects in the FY 23-25 City Work Program (CWP) and respectfully convey my staunch opposition to several items therein. In a time where fiscal prudence is paramount, the inclusion of certain projects, notably those outlined below, raises profound concerns about their alignment with our community's priorities and fiscal responsibility: Development of ELI and BMR housing units: While the aspiration to preserve affordable housing is commendable, the city's focus should remain on core municipal responsibilities. The proposed allocation of resources toward housing initiatives surpasses the city's core charter of services to your housed existing residents and ignores our budgetary constraints. Collaboration on regional unhoused support: While addressing homelessness is a critical issue, the proposed approach risks overextension beyond the city's core mandate. Fiscal resources should be prioritized towards essential services for residents, rather than expanding into non-core endeavors. Update to 5G Ordinance: Given the legitimate concerns surrounding 5G technology, a balanced approach is imperative. However, substantial investment in additional studies is unwarranted. We must prioritize the adoption of existing resident-friendly research and enforce safety measures rigorously. Lowering speed limits: The proposal to lower speed limits lacks empirical justification and may not address the root cause of traffic issues. Instead, resources should be redirected towards enhancing enforcement of existing speed regulations to ensure public safety. Development of Recycled Water Feasibility Study: While sustainable water management is crucial, the proposed study represents an undue financial burden on the city. We must exercise fiscal restraint and focus on pragmatic solutions that align with our budgetary limitations. New Bike Ped Plan: The disproportionate allocation of resources towards bike infrastructure projects warrants reassessment. Priority should be given to pedestrian safety initiatives, which serve a broader segment of the community and have been neglected in previous spending allocations. In light of these concerns, I implore the City Council to reject the current staff recommendation for the above and prioritize projects that adhere to our core municipal responsibilities, align with community needs, and demonstrate fiscal prudence. Thank you for your attention to this urgent matter. I remain optimistic that our collective efforts will ensure the prudent stewardship of Cupertino's resources and the prioritization of initiatives that serve the best interests of all residents. Sincerely, Santosh Rao From:Seema Lindskog To:City Council Cc:City Clerk; Cupertino City Manager"s Office Subject:Work Plan discussion this evening Date:Wednesday, April 3, 2024 2:20:59 PM CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Respected Mayor Mohan, Vice-Mayor Fruen, and council members, I am writing to urge you to keep or consider adding the following items to the Work Plan. A 5-year Bike Ped Plan or Active Transportation Plan. The current plans are several years out of date. They are separate Bike and Ped plans which creates confusing competing priorities, they don't take into account the new housing developments being planned or other plans that have been created recently such as the Climate Action Plan adopted in 2022. A new Active Transportation Plan is required to be able to apply to multiple grants, so the lack of it has a significant multi-million dollar negative impact on the city's fiscal health. A Complete Streets ordinance to be adopted in our municipal code. This is a partner to the Active Transportation Plan and is high impact/low resource. The City of San Jose has adopted an excellent Complete Streets ordinance in their municipal code which would be a good starting point for us so we can save staff time and not write one from scratch. A Small Business revitalization ordinance. Our small businesses are struggling. A few days, the Counter announced it's closing. Empty storefronts are everywhere. While we have an economic development manager and there are provisions in the municipal code that can be considered small-business friendly, they are scattered and there is no organized, concerted effort to pull all these pieces together into a cohesive whole and identify what else can be done, using other cities as benchmarks that have thriving small businesses like Sunnyvale and Mountain View. A Small Business Revitalization ordinance would indicate the city is serious about helping its small businesses and is willing to go beyond "business as usual" to make it happen. Streamline Permits for Small Residential Repairs. This would solve a major pain point for city residents and could help spur more renovation and home improvement work, which would increase city revenue and also helps our local businesses. These last two projects would also help change the narrative of our city governance which has been focused on the battle over housing for years now. It would benefit the city to be seen as being more small business and resident friendly and hopefully bring us some positive press as well. Best regards, Seema ___________________________________________________________________ "You must be the change you want to see in the world." - Mahatma Gandhi This message is from my personal email account. I am only writing as myself, not as a representative or spokesperson for any other organization. From:Srividya Sundaresan To:City Council; Pamela Wu; Matt Morley Cc:City Clerk Subject:Urgent Appeal: Reconsideration of FY 23-25 City Work Program Projects Date:Tuesday, April 2, 2024 9:57:37 PM CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Dear Mayor Sheila, Esteemed Cupertino City Council Members, and City Manager Wu, I am compelled to address the current proposal for ongoing projects in the FY 23-25 City Work Program (CWP) and respectfully convey my staunch opposition to several items therein. In a time where fiscal prudence is paramount, the inclusion of certain projects, notably those outlined below, raises profound concerns about their alignment with our community's priorities and fiscal responsibility: Development of ELI and BMR housing units: While the aspiration to preserve affordable housing is commendable, the city's focus should remain on core municipal responsibilities. The proposed allocation of resources toward housing initiatives surpasses the city's core charter of services to your housed existing residents and ignores our budgetary constraints. Collaboration on regional unhoused support: While addressing homelessness is a critical issue, the proposed approach risks overextension beyond the city's core mandate. Fiscal resources should be prioritized towards essential services for residents, rather than expanding into non- core endeavors. Update to 5G Ordinance: Given the legitimate concerns surrounding 5G technology, a balanced approach is imperative. However, substantial investment in additional studies is unwarranted. We must prioritize the adoption of existing resident-friendly research and enforce safety measures rigorously. Lowering speed limits: The proposal to lower speed limits lacks empirical justification and may not address the root cause of traffic issues. Instead, resources should be redirected towards enhancing enforcement of existing speed regulations to ensure public safety. Development of Recycled Water Feasibility Study: While sustainable water management is crucial, the proposed study represents an undue financial burden on the city. We must exercise fiscal restraint and focus on pragmatic solutions that align with our budgetary limitations. New Bike Ped Plan: The disproportionate allocation of resources towards bike infrastructure projects warrants reassessment. Priority should be given to pedestrian safety initiatives, which serve a broader segment of the community and have been neglected in previous spending allocations. In light of these concerns, I implore the City Council to reject the current staff recommendation for the above and prioritize projects that adhere to our core municipal responsibilities, align with community needs, and demonstrate fiscal prudence. Thank you for your attention to this urgent matter. I remain optimistic that our collective efforts will ensure the prudent stewardship of Cupertino's resources and the prioritization of initiatives that serve the best interests of all residents. Sincerely, Srividya Sundaresan From:Rhoda Fry To:City Clerk; City Council Subject:4/3/2024 City Council Agenda #1 Study Session Date:Wednesday, April 3, 2024 3:45:34 PM CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. 4/3/2024 City Council Agenda #1 Study Session Dear City Council, We have heard many times that the City Hall is not seismically safe. If that is true, then let’s please fix it and please also complete the work that was started on Torre. Employee safety should be a priority. Please be wise with our public money and provide high-level interim cost estimates on projects. For example, if you’re going to look at water use at the golf course and running a recycle water line to the property, please don’t spend a lot of time on it. My guess is that you’d be able to come up with an order of magnitude estimate in less than an hour and then decide whether to drill down some more. Thanks, Rhoda Virus-free.www.avg.com