Loading...
BLD-2023-2671_Re-roof Tear off Policy14 PROJECT ADDRESS: 2� �7% tJ %]� LUIN , rS r (r `Kh!'! APN # OWNER NAME: �� ] zHA 0 t PHONE: E-MAIL: STREErADDRESS Z / �/S L{ CITY.STATE, ZIP: FAX LICENSE: NUMBER-- I _ f%1J CONi"ItAC"IOR.NAME. G /— & (,��T�-'' �7 LICENSE TYPE:/ r_ L_ 1�U5. LIC. tJ COMPANY NAME: �, I � ^,,., %� (�j (� E-MAIL, FAX: STREETADpRESS, 7 0s- � ClT 5 ATE,Z orl PHONE' The re -roof project shall comply with all applicable provisions of the 2022 California Codes and Cupertino Municipal Codes. *NOTE: PV/Solar removed from the existing roof to install new roofing will require a separate permit for re -installation of PV/Solar An inspection request may be scheduled up to one business day before the requested inspection date. Please schedule inspections online or call (408) 777-3228 from 7:30am-3:30pm (Mon-Thurs) or 7:30am-2:30pm (Friday) to schedule inspections. "Roof Tear-Of1P'and "Roof Plywood Nail" inspections are "ON CALL" inspections. You must call in on the day of the inspection ONLY after that phase of the work is completed. The building inspector should be available within one hour. The hours for this service are: 7:30-10:30am and Far all reroot inspections, safe ladder access to roof is to be provided per CAL OSHA requirements (https:JJwww.dir.ca.gnvldosh/etoo1s108-001/regs.htm). Ladder side rails must extend to at Ieast 3 ft. above the landing (roof surface) unless handholds are provided. The ladder shall be so placed as to prevent slipping, or it shall be tied, blocked, held, or otherwise "Roof Tear -Off inspection is required. All dry -rotted wood sh completely removed or knocked -down prior to this inspection. "Roof Plywood Nail" inspection is required if new solid sheathing is installed. "Roof Tear -Off` inspection, "Roof Plywood Nail" inspection may be omitted. "Roof Batten" inspection is required if installation of tile or metal shingle is required by manufacturer inspection, see 42 above for scheduling instructions. NOTE: NO underlayment or roofing shall be applied without first obtaining all required inspections and documented approva'. the building inspector. Failure to obtain inspection approvals will result in removal of all materials to sheathing to perform req inspections and a re -inspection fee will be charged. The re -inspection fee shall be paid prior to scheduling another inspection. A "Final Building" inspection and approval shall be obtained from final sign -off, the following items will he required and verified - Listings from approved testing agencies for all inspection. Note: Verification of class "A" fir( the required PV/Solar permit for re -installation. All construction debris is to be removed. NOTE: Ci�of Cupertino does NOT allow copper does NOT allow coffer roofing or copper architectural materials.