BLD-2023-2284_Re-roof Tear off PolicyREROOF / TEAR -OFF POLICY
CUPERTINO
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
(408) 777-3228 • FAX (408) 777-3333 • buildina5cupertino.ora
PROJECT ADDRESS: 21706 NOONAN COURT
APN d
I
OWNERNAME:
STREET ADDRESS:
CITY. STATE. ZIP:
FAX
21706 NOONAN COURT
CUPERTINO, CA.95014
CONTRACTOR NAME
LICENSE NUMBER:
LICENSE TYPE:
BUS. LIC. &
NENNET MOONI
U14U
W9,L3.6
SL-0009I1
COMPANY NAME:
E-MAIL:
FAX:
YORKSHIRE ROOFING OF NOWHERN OALIFORNIA
TRACY®YORNSHIREROOFING COM
STREET ADDRESS:
CITY, STATE, ZIP:
PHONE.
IStO NATIONAL ORNE
LIVERMORE. CA. 54550
(W5)80661W
I UNDERSTAND AND AGREE TO THE FOLLOWING:
1. The re -roof project shall comply with all applicable provisions of the 2022 California Codes and Cupertino Municipal Codes.
*NOTE: PV/Solar removed from the existing roof to install new roofing will require a separate permit for re -installation of PV/Solar
panels/system.
2. An inspection request may be scheduled ui) to one business day before the requested inspection date. Please schedule inspections
online or call (408) 777-3228 from 7:30am-3:30pm (Mon-Thurs) or 7:30am-2:30pm (Friday) to schedule inspections. "Roof Tear- Ofj' and
"Roof Plywood Nail" inspections are "ON CALL" inspections. You must call in on the day of the inspection ONLY after that phase of
the work is completed. The building inspector should be available within one hour. The hours for this service are: 7:30-10:30am and
1:00-3-.30pm (Mon-Thurs) and 7:30-10:30am and 12:30-2:30 (Friday). "Final Buildinr" inspection will be given a two hour window.
3. For all reroof inspections, safe ladder access to roof is to be provided per CAL OSHA requirements
(https:Hl w.dir.ca.gov/dosh/etools/08-001/regs.htm). Ladder side rails must extend to at least 3 ft. above the landing (roof surface)
unless handholds are provided. The ladder shall be so placed as to prevent slipping, or it shall be tied, blocked, held, or otherwise
secured to prevent slipping.
4. "Roof Tear -Off inspection is required. All dry -rotted wood shall be replaced prior to this inspection. All nails/fastener: shall be
completely removed or knocked -down prior to this inspection.
5. "Roof Plywood Nail" inspection is required if new solid sheathing is installed. If solid sheathing is present on existing roof at time of
"Roof Tear -Off' inspection, "Roof Plywood Nail" inspection may be omitted.
6. "Roof Batten" inspection is required if installation of tile or metal shingle is required by manufacturer. This is an "ON CALL"
inspection, see #2 above for scheduling instructions.
NOTE: NO underlayment or roofing shall be applied without first obtaining all required inspectionIs and documented approvals from
the building inspector. Failure to obtain inspection approvals will result in removal of all materials to sheathing to perform required
inspections and a re -inspection fee will be charged. The re -inspection fee shall be paid prior to scheduling another inspection.
8. A "Final Building" inspection and approval shall be obtained from the building inspector when the reroofing is completed. To receive
final sign -off, the following items will be required and verified:
a. Flat roofs shall have a minimum of 1/A" per foot of slope and shall demonstrate no pending.
b. Listings from approved testing agencies for all pre -manufactured products used shall he available on -site to review at time of the
inspection. Note: Verification of class "A" fire rating may be requested by building inspector.
c. Spark arrestor installation, double wall flues have not been cut and 1" min. clearance to roof sheathing, plastic vents are painted
with water based synthetic latex paint, gutters/downspouts installed, and verification of NO PV/Solar previously installed and/or
the required PV/Solar permit for re -installation. All construction debris is to be removed.
NOTE: City of Cupertino does NOT allow copper roofing or copper architectural materials.
1 certify each of the following is true: I am the property owner or authorized agent to act on the property owner's behalf. I understand
and agree to comply with the reroof policy stated above. i understand that smoke detectors and carbon monoxide detectors are required
to be installed in accordance with Sections R314 and R315 of the 2019 California Residential Code for "Final Buildinc sign off.
Signature of Applicant/Agent: Date: 712 3
ReroofPolicv_2011.doc revised 6127/1023