Loading...
BLD-2023-0497InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10226 DENISON AVE Cupertino APN: 316 28 017 PERMIT NO: BLD-2023-0497 OWNER'S NAME: HINDI DAVID S AND LIU LILI OWNER'S PHONE: 408-771-7546 CONTRACTOR: SPV CONSTRUCTION, 11603 BRIDGE PARK CT CUPERTINO CONTRACTOR PHONE: 4085180465 DATE ISSUED 1/12/2024 7:35:14 AM ISSUED BY:VALUATION: $40000 JOB DESCRIPTION KITCHEN REMODEL (150 SF); BATHROOMS REMODEL (220 SF); REMODEL FAMILY ROOM AND OFFICE (389 SF) REV#1 - INSTALL FIRE SUPPERSSIOIN SPRINKLER SYSTEM; REPLACE EXISTING DROPPED CEILING BY CORRECTING HEEL CONNECTION THAT WAS MISSING PER ORIGINAL DESIGN-APPROVED 9/26/2023 REV#2 - NEW 1-1/2" COPPER DOMESTIC WATER SERVICE; NEW DUCTWORK IN ATTIC; NEW SUBPANEL IN MASTER BEDROOM BEHIND BATHROOM WALL-APPROVED 12/1/2023 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2023-06-12 Cancelled   REINFORCEMENT 2023-06-12 Cancelled   FOUNDATION 2023-06-15 Passed James Lee ROUGH ELECTRICAL 2023-09-27 Passed James Lee ROUGH PLUMBING 2023-09-27 Passed James Lee ROUGH MECHANICAL 2023-09-27 Passed James Lee GAS TEST 2023-09-27 Cancelled James Lee ROUGH FRAME 2023-09-27 Failed James Lee EXTERIOR LATH 2023-09-27 Passed James Lee ROUGH FRAME 2023-10-09 Conditional Rodney Weathers SERVICE UPGRADE 2023-10-03 Rescheduled   SERVICE UPGRADE 2023-10-09 Passed Rodney Weathers FIRE DEPT - SPRINKLERS - ROUGH 2023-10-02 Passed Santa Clara County Fire INTERIOR LATH 2023-10-16 Passed James Lee SHEETROCK 2023-10-16 Passed James Lee INSULATION 2023-10-09 Passed Rodney Weathers FINAL ELECTRICAL 2023-10-09 Failed Rodney Weathers UNDERGROUND WATER SERVICE 2023-10-09 Failed Rodney Weathers EXTERIOR SHEAR 2023-10-09 Passed Rodney Weathers FINAL MECHANICAL 2023-10-09 Failed Rodney Weathers GAS TEST 2023-11-06 Passed Rodney Weathers FINAL BUILDING 2024-01-08 Failed Rodney Weathers FIRE DEPT - SPRINKLERS - FINAL 2023-12-21 Passed Santa Clara County Fire FINAL BUILDING 2024-01-12 Passed Rodney Weathers EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.