BLD-2023-0497InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10226 DENISON AVE Cupertino APN: 316 28 017 PERMIT NO: BLD-2023-0497
OWNER'S NAME: HINDI DAVID S AND LIU LILI OWNER'S PHONE: 408-771-7546
CONTRACTOR: SPV CONSTRUCTION, 11603 BRIDGE PARK CT CUPERTINO CONTRACTOR PHONE: 4085180465
DATE ISSUED 1/12/2024 7:35:14 AM ISSUED BY:VALUATION: $40000
JOB DESCRIPTION
KITCHEN REMODEL (150 SF); BATHROOMS REMODEL (220 SF); REMODEL FAMILY ROOM AND OFFICE (389 SF) REV#1 - INSTALL FIRE SUPPERSSIOIN SPRINKLER SYSTEM; REPLACE
EXISTING DROPPED CEILING BY CORRECTING HEEL CONNECTION THAT WAS MISSING PER ORIGINAL DESIGN-APPROVED 9/26/2023 REV#2 - NEW 1-1/2" COPPER DOMESTIC WATER
SERVICE; NEW DUCTWORK IN ATTIC; NEW SUBPANEL IN MASTER BEDROOM BEHIND BATHROOM WALL-APPROVED 12/1/2023
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2023-06-12 Cancelled
REINFORCEMENT 2023-06-12 Cancelled
FOUNDATION 2023-06-15 Passed James Lee
ROUGH ELECTRICAL 2023-09-27 Passed James Lee
ROUGH PLUMBING 2023-09-27 Passed James Lee
ROUGH MECHANICAL 2023-09-27 Passed James Lee
GAS TEST 2023-09-27 Cancelled James Lee
ROUGH FRAME 2023-09-27 Failed James Lee
EXTERIOR LATH 2023-09-27 Passed James Lee
ROUGH FRAME 2023-10-09 Conditional Rodney Weathers
SERVICE UPGRADE 2023-10-03 Rescheduled
SERVICE UPGRADE 2023-10-09 Passed Rodney Weathers
FIRE DEPT - SPRINKLERS - ROUGH 2023-10-02 Passed Santa Clara County Fire
INTERIOR LATH 2023-10-16 Passed James Lee
SHEETROCK 2023-10-16 Passed James Lee
INSULATION 2023-10-09 Passed Rodney Weathers
FINAL ELECTRICAL 2023-10-09 Failed Rodney Weathers
UNDERGROUND WATER SERVICE 2023-10-09 Failed Rodney Weathers
EXTERIOR SHEAR 2023-10-09 Passed Rodney Weathers
FINAL MECHANICAL 2023-10-09 Failed Rodney Weathers
GAS TEST 2023-11-06 Passed Rodney Weathers
FINAL BUILDING 2024-01-08 Failed Rodney Weathers
FIRE DEPT - SPRINKLERS - FINAL 2023-12-21 Passed Santa Clara County Fire
FINAL BUILDING 2024-01-12 Passed Rodney Weathers
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.