BLD-2022-0433InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 1134 S STELLING RD Cupertino APN: 362 26 005 PERMIT NO: BLD-2022-0433
OWNER'S NAME: DING HENGZHOU AND WEN XIAOSI OWNER'S PHONE: 765-377-1294
CONTRACTOR: STANLEY- TEAM CONSTRUCTION LLC, 10068 PASADENA AVENUE CUPERTINO CONTRACTOR PHONE:
DATE ISSUED 1/8/2024 1:53:01 PM ISSUED BY:VALUATION: $132000
JOB DESCRIPTION
SFD ADDITION (743 SF); UPGRADE MAIN PANEL (200 AMP); NEW REAR PATIO (280SF); REMODEL OTHER (425); (2) NEW GARAGE MAN-DOORS; NEW TANKLESS WATER HEATER REV # 1
- REPLACE NEW FAU AND RELOCATE IN ATTIC; REPLACE NEW AC AND RELOCATE TO NEW LOCATION; UPDATE T24 -APPROVED 3/23/2023 REV # 2 - INSTALL EV CHARGER -
APPROVED 12/6/2023
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2022-09-02 Passed Rodney Weathers
PIERS 2022-09-02 Passed Rodney Weathers
UNDERFLOOR FRAMING 2022-09-09 Failed Rodney Weathers
UNDERFLOOR PLUMBING 2022-09-09 Cancelled
UNDERFLOOR FRAMING 2022-09-14 Rescheduled Rodney Weathers
UNDERFLOOR PLUMBING 2022-09-14 Rescheduled Rodney Weathers
UNDERFLOOR PLUMBING 2022-09-15 Passed Rodney Weathers
UNDERFLOOR FRAMING 2022-09-15 Passed Rodney Weathers
EXTERIOR SHEAR 2022-10-04 Failed Bob Sabich
ROOF NAIL 2022-10-04 Failed Bob Sabich
EXTERIOR SHEAR 2022-10-05 Conditional Rodney Weathers
ROOF NAIL 2022-10-05 Failed Rodney Weathers
TEMPORARY POWER POLE 2022-10-05 Cancelled Rodney Weathers
ELECTRIC METER RELEASE 2022-10-05 Passed Rodney Weathers
FINAL ELECTRICAL 2022-10-05 Failed Rodney Weathers
ROOF NAIL 2022-10-10 Passed Bob Sabich
EXTERIOR LATH 2022-11-21 Passed Bob Sabich
ROUGH ELECTRICAL 2022-11-21 Failed Bob Sabich
ROUGH FRAME 2022-11-21 Passed Bob Sabich
ROUGH MECHANICAL 2022-11-21 Failed Bob Sabich
ROUGH PLUMBING 2022-11-21 Passed Bob Sabich
INSULATION 2022-11-30 Passed Bob Sabich
SHEETROCK 2022-12-06 Failed Rodney Weathers
SCRATCH COAT 2022-12-06 Passed Rodney Weathers
SHOWER PAN 2022-12-06 Passed Rodney Weathers
INTERIOR LATH 2022-12-20 Passed Bob Sabich
GAS TEST 2022-12-20 Passed Bob Sabich
UNDERGROUND SEWER 2023-04-25 Passed Rodney Weathers
SANITARY - VISUAL 2023-04-21 Passed cupsanitary
PROPERTY LINE CLEANOUT 2023-04-25 Conditional Rodney Weathers
SANITARY - FINAL 2023-04-28 Passed cupsanitary
FINAL BUILDING 2023-10-11 Failed Rodney Weathers
FINAL BUILDING 2023-12-21 Failed Rodney Weathers
FINAL BUILDING 2024-01-08 Passed Rodney Weathers
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.