Loading...
BLD-2023-1797InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 1032 NOVEMBER DR Cupertino APN: 362 15 005 PERMIT NO: BLD-2023-1797 OWNER'S NAME: HARIHARAN LAKSHMINARAYAN AND MENG XIANFENG OWNER'S PHONE: 626-252-2189 CONTRACTOR: MUST RETRIEVE DATA.CONTRACTOR PHONE: DATE ISSUED 1/3/2024 7:06:12 AM ISSUED BY:VALUATION: $100000 JOB DESCRIPTION REMODEL KITCHEN (130 SF); REMODEL (2) BATHROOMS (105 SF); REMODEL FAMILY ROOM TO DEMO FIREPLACE AND NON-STRUCTURAL PARTITION WALLS; REMODEL (2) BEDROOMS TO EXPAND CLOSETS; RELOCATE LAUNDRY ROOM TO GARAGE; REMOVE (E) FURNACE TO EXPAND BATHROOM; (N) HEAT PUMP AC UNIT; (N) AIR HANDLER IN ATTIC; REPLACE (7) WINDOWS AND (1) SLIDING DOOR; REWIRE; UPGRADE ELECTRICAL; SWITCHES, OUTLETS; PROPERTY LINE CLEAN-OUT- REV #1 - NEW SUB-PANEL (70AMP) GARAGE-APPROVED 11/15/2023 INSPECTION TYPE DATE STATUS INSPECTOR AIR CONDITIONER 2023-10-23 Failed James Lee PROPERTY LINE CLEANOUT 2023-10-31 Passed Antonio Torrez ROUGH ELECTRICAL 2023-11-09 Failed Antonio Torrez ROUGH MECHANICAL 2023-11-09 Passed Antonio Torrez ROUGH PLUMBING 2023-11-09 Passed Antonio Torrez ROUGH FRAME 2023-11-09 Failed Antonio Torrez SANITARY - VISUAL 2023-10-31 Passed cupsanitary SANITARY - FINAL 2023-11-09 Failed cupsanitary INSULATION 2023-11-09 Passed Antonio Torrez EXTERIOR LATH 2023-11-09 Passed Antonio Torrez ROUGH FRAME 2023-11-16 Passed Rodney Weathers ROUGH ELECTRICAL 2023-11-16 Passed Rodney Weathers SHOWER PAN 2023-11-27 Rescheduled   SANITARY - FINAL 2023-11-16 Passed cupsanitary SHEETROCK 2023-11-16 Conditional Rodney Weathers SHOWER PAN 2023-11-22 Passed Paul O'Sullivan SHEETROCK 2023-11-22 Passed Paul O'Sullivan INTERIOR LATH 2023-12-01 Passed Rodney Weathers FINAL ELECTRICAL 2023-12-22 Failed James Lee FINAL MECHANICAL 2023-12-22 Passed James Lee FINAL PLUMBING 2023-12-22 Passed James Lee FINAL BUILDING 2023-12-22 Failed James Lee FINAL BUILDING 2024-01-03 Passed James Lee FINAL ELECTRICAL 2024-01-03 Passed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.