BLD-2023-1797InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 1032 NOVEMBER DR Cupertino APN: 362 15 005 PERMIT NO: BLD-2023-1797
OWNER'S NAME: HARIHARAN LAKSHMINARAYAN AND MENG XIANFENG OWNER'S PHONE: 626-252-2189
CONTRACTOR: MUST RETRIEVE DATA.CONTRACTOR PHONE:
DATE ISSUED 1/3/2024 7:06:12 AM ISSUED BY:VALUATION: $100000
JOB DESCRIPTION
REMODEL KITCHEN (130 SF); REMODEL (2) BATHROOMS (105 SF); REMODEL FAMILY ROOM TO DEMO FIREPLACE AND NON-STRUCTURAL PARTITION WALLS; REMODEL (2) BEDROOMS
TO EXPAND CLOSETS; RELOCATE LAUNDRY ROOM TO GARAGE; REMOVE (E) FURNACE TO EXPAND BATHROOM; (N) HEAT PUMP AC UNIT; (N) AIR HANDLER IN ATTIC; REPLACE (7)
WINDOWS AND (1) SLIDING DOOR; REWIRE; UPGRADE ELECTRICAL; SWITCHES, OUTLETS; PROPERTY LINE CLEAN-OUT- REV #1 - NEW SUB-PANEL (70AMP) GARAGE-APPROVED
11/15/2023
INSPECTION TYPE DATE STATUS INSPECTOR
AIR CONDITIONER 2023-10-23 Failed James Lee
PROPERTY LINE CLEANOUT 2023-10-31 Passed Antonio Torrez
ROUGH ELECTRICAL 2023-11-09 Failed Antonio Torrez
ROUGH MECHANICAL 2023-11-09 Passed Antonio Torrez
ROUGH PLUMBING 2023-11-09 Passed Antonio Torrez
ROUGH FRAME 2023-11-09 Failed Antonio Torrez
SANITARY - VISUAL 2023-10-31 Passed cupsanitary
SANITARY - FINAL 2023-11-09 Failed cupsanitary
INSULATION 2023-11-09 Passed Antonio Torrez
EXTERIOR LATH 2023-11-09 Passed Antonio Torrez
ROUGH FRAME 2023-11-16 Passed Rodney Weathers
ROUGH ELECTRICAL 2023-11-16 Passed Rodney Weathers
SHOWER PAN 2023-11-27 Rescheduled
SANITARY - FINAL 2023-11-16 Passed cupsanitary
SHEETROCK 2023-11-16 Conditional Rodney Weathers
SHOWER PAN 2023-11-22 Passed Paul O'Sullivan
SHEETROCK 2023-11-22 Passed Paul O'Sullivan
INTERIOR LATH 2023-12-01 Passed Rodney Weathers
FINAL ELECTRICAL 2023-12-22 Failed James Lee
FINAL MECHANICAL 2023-12-22 Passed James Lee
FINAL PLUMBING 2023-12-22 Passed James Lee
FINAL BUILDING 2023-12-22 Failed James Lee
FINAL BUILDING 2024-01-03 Passed James Lee
FINAL ELECTRICAL 2024-01-03 Passed James Lee
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.