05040069 Inspection RecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 6432 MYRTLEWOOD DR CUPERTINO, CA 95014-4626
CUPERTINO APN: 369 20 023 PERMIT NO: 05040069
OWNER'S NAME: OWNER INFO MISSING FROM RECORD OWNER'S PHONE: 408-252-4451
CONTRACTOR: NO LICENSE INFO,CONTRACTOR PHONE:
DATE ISSUED 2/14/2024 7:21:15 AM ISSUED BY:VALUATION: $140000
JOB DESCRIPTION
ADD 616' (MS BEDRM/RELOCATE GARAGE) REROOF EXPIRED FILMED-2011
INSPECTION TYPE DATE STATUS INSPECTOR
BLD_RES_ADN SANITARY INSPECTION-CUPT SANIT 2006-01-11 Passed
EXTERIOR LATH 2005-09-19 Passed
EXTERIOR LATH Pending Passed
EXTERIOR SHEAR 2005-08-19 Failed
FINAL BUILDING 2006-01-12 Passed
FINAL BUILDING 2006-01-12 Failed
FINAL BUILDING 2006-01-18 Failed
FINAL ELECTRICAL 2006-01-12 Passed
FINAL ELECTRICAL 2006-01-12 Failed
FINAL ELECTRICAL 2006-01-18 Passed
FINAL MECHANICAL 2006-01-12 Passed
FINAL MECHANICAL 2006-01-12 Passed
FINAL PLUMBING 2006-01-12 Passed
FINAL PLUMBING 2006-01-12 Passed
FOUNDATION 2005-07-18 Passed
GAS METER RELEASE 2006-01-13 Cancelled
GAS TEST 2006-01-12 Failed
GAS TEST 2006-01-13 Passed
INSULATION 2005-08-26 Cancelled
INSULATION 2005-09-09 Cancelled
INSULATION 2005-09-13 Passed
INTERIOR LATH 2005-10-19 Cancelled
INTERIOR LATH 2005-10-20 Passed
INTERIOR SHEAR 2005-08-19 Passed
ROOF NAIL 2005-08-19 Passed
ROUGH ELECTRICAL 2005-09-01 Passed
ROUGH FRAME 2005-09-01 Passed
ROUGH MECHANICAL 2005-09-01 Passed
ROUGH PLUMBING 2005-09-01 Passed
SHEETROCK 2005-09-19 Failed
SHEETROCK 2005-09-21 Passed
UNDERFLOOR FRAMING 2005-07-22 Failed
UNDERFLOOR PLUMBING 2005-07-22 Passed
UNDERGROUND SEWER 2005-09-01 Passed
UNDERGROUND SEWER 2005-09-01 Passed
UNDERGROUND SEWER 2005-09-01 Passed
FINAL BUILDING 2024-02-14 Passed Rodney Weathers
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.