B-2018-0930 Inspection RecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10191 SANTA CLARA AVE CUPERTINO, CA
95014-1216 CUPERTINO APN: 326 22 036 PERMIT NO: B-2018-0930
OWNER'S NAME: Dmj Home Solutions LLC OWNER'S PHONE: 510-364-7924
CONTRACTOR: ECOSYS BUILDINGS INC, 2845 MOORPARK AVE #204 SAN JOSE CONTRACTOR PHONE: 4082031184
DATE ISSUED 2/13/2024 10:57:27 AM ISSUED BY:VALUATION: $405450
JOB DESCRIPTION
NEW 2 STORY SFD (2783 SF); PORCH (76 SF); DECK (339 SF); ATTACHED GAR (421 SF) DEF #1- TRUSSES -ISSUED 7-15-2019 REV #1 - ADD EXIT DOOR AT GARAGE; REVISE SLIDING DOOR
AT FAMILY RM; REMOVE SIDE WINDOWS AT MASTER BEDRM SLIDING DOOR; ADD COFFERED CEILING AT ENTRY; REVISE A FEW INTERIOR DOOR TYPES.- ISSUED 7-15-2019 REV #2 - -
REMOVE 1 FULL BATH INSIDE MASTER DOWNSTAIRS BEDROOM; CHANGE POWDER ROOM TO FULL BATH WITH SHOWER OUTSIDE THE MASTER DOWNSTAIRS BEDROOM; ADD VEGGIE
SINK AT KITCHEN COUNTER; REMOVE (1) SKYLIGHT RIGHT AT FRONT ENTRANCE; ADD (N) HEAT PUMP FURNACE FOR SERVICING 1ST FLOOR; RELOCATE CLOSET IN MASTER
DOWNSTAIRS BEDROOM; REMOVE (1) WINDOW AT FAMILY ROOM, AND (2) WINDOWS IN RIGHT SIDE BEDROOM UPSTAIRS; CHANGE SIZE OF WINDOWS: (1) IN MASTER DOWNSTAIRS
BEDROOM, (1) IN MASTER BATHROOM UPSTAIRS; ENLARGE THE SIZE THE BATHROOM UPSTAIRS - APPROVED 05/11/2021
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2019-03-05 Partial
FOUNDATION 2019-03-11 Partial
FOUNDATION 2019-03-20 Passed
SLAB 2019-04-08 Passed
UNDERFLOOR FRAMING 2019-05-21 Failed
UNDERFLOOR FRAMING 2019-05-22 Passed
UNDERFLOOR PLUMBING 2019-05-21 Passed
SLAB 2020-10-12 Passed Paul O'Sullivan
EXTERIOR SHEAR 2020-12-15 Failed Bob Sabich
INTERIOR SHEAR 2020-12-15 Failed Bob Sabich
ROOF NAIL 2020-12-15 Passed Bob Sabich
ROUGH ELECTRICAL 2021-02-16 Failed Bob Sabich
ROUGH MECHANICAL 2021-02-16 Failed Bob Sabich
ROUGH FRAME 2021-02-16 Failed Bob Sabich
EXTERIOR LATH 2021-02-16 Failed Bob Sabich
SHOWER PAN 2021-02-16 Cancelled Bob Sabich
ROUGH PLUMBING 2021-02-16 Failed Bob Sabich
FOUNDATION 2019-03-05 Cancelled Antonio Torrez
FOUNDATION 2019-03-20 Cancelled Antonio Torrez
UNDERFLOOR PLUMBING 2019-05-21 Cancelled James Lee
FOUNDATION 2019-03-11 Cancelled Antonio Torrez
EXTERIOR LATH 2021-05-19 Passed Antonio Torrez
ROUGH ELECTRICAL 2021-05-19 Passed Antonio Torrez
ROUGH MECHANICAL 2021-05-19 Passed Antonio Torrez
ROUGH PLUMBING 2021-05-19 Passed Antonio Torrez
ROUGH FRAME 2021-05-19 Failed Antonio Torrez
SHOWER PAN 2021-05-19 Passed Antonio Torrez
FIRE DEPT - SPRINKLERS - ROUGH 2021-05-12 Passed Santa Clara County Fire
INSULATION 2021-05-24 Passed Antonio Torrez
ROUGH FRAME 2021-05-24 Passed Antonio Torrez
GAS TEST 2021-06-08 Passed Antonio Torrez
SCRATCH COAT 2021-06-08 Passed Antonio Torrez
SHEETROCK 2021-06-08 Passed Antonio Torrez
INTERIOR LATH 2021-06-08 Passed Antonio Torrez
GAS TEST 2022-05-06 Passed Paul O'Sullivan
ELECTRIC METER RELEASE 2022-05-06 Passed Paul O'Sullivan
GAS METER RELEASE 2022-05-06 Passed Paul O'Sullivan
UNDERGROUND SEWER 2022-08-26 Passed Bob Sabich
UNDERGROUND WATER SERVICE 2022-09-16 Passed Antonio Torrez
SANITARY - VISUAL 2023-06-15 Passed cupsanitary
FIRE DEPT - SPRINKLERS - FINAL 2023-07-06 Passed Santa Clara County Fire
SANITARY - FINAL 2023-08-03 Passed cupsanitary
FINAL PLANNING 2024-01-16 Passed Danielle Condit
PW – DEV SERVICES FINAL 2024-01-25 Passed Kevin Rieden
FINAL BUILDING 2024-02-07 Failed Antonio Torrez
FINAL ELECTRICAL 2024-02-07 Passed Antonio Torrez
FINAL MECHANICAL 2024-02-07 Passed Antonio Torrez
FINAL PLUMBING 2024-02-07 Passed Antonio Torrez
FINAL BUILDING 2024-02-13 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.