Loading...
CC Resolution No. 8363 RESOIlJI'ION NO. 8363 A RESOIlJI'ION OF THE Cl'I'Y CXXJNCIL OF THE Cl'I'Y OF aJPERl'INO AUIHORIZING REIMElJRSn1ENT 'IO MARIANI GBœP OF cnœANIES FRœ MASTER STORM DRAIN FUND FOR MASTER STORM LINE OONS'IRUCI'ED IN CDNJUNcrION WITH TRAcr NO. 8325, HœŒSTEAD ROAD M DE ANZA B:XJIEVARD WHEREAS, in conjunction with the Developnent of Tract No. 8325 (Porotofoni) located at Homestead Road am De Anza Boulevard, the developer, Mariani Group of Callpanies was required, in accordance with City policy, to install certain master stenn drain facilities with reiInbursement to be made by the city from the master stenn drain fund at the c:xmpletion of the project; and WHEREAS, the master stonn facilities in Tract 8325 has now been caupleted by the developer and a reiInbursement in the ærount of $37,259.00 is in order as outlined in a attached Exhibit "A". New, 'lliEREFORE, BE IT RESOLVED that the City Council of the City of CUpertino hereby authorized the appropriation and reimbursement of $37,259.00 from the master stenn drain fund to Mariani Group of Callpanies as explained herein. PASSED AND AOOPI'ED at a regular meeting of the city Council of the City of CUpertino, this lst day of April , 1991, by the following vote: vote Members of the City Council AYES: Rogers, Sorensen, Szabo, Koppel NOFS: None ABSENT: None ABSTAIN: Goldman A'ITEST: APImVED: /s/ Dorothy Cornelius City Clerk /s/ Barb Koppel Mayor, City of CUpertino ~ PHIL AUGER Civil Engineer ~D~~D@lrD ~lrD@DlrD~~~~~ DlrD(Ço Results DON NUNES Civil Engineer March 1. 1991 88100 Bert J. Viskovich City Engineer City of Cupertino 10300 Torre Avenue Cupertino. California 95011j Re: Storm Drain Reimbursement Certification - Portofino Dear Mr. Viskovich: As per City Agreement with the developer. I hereby certify that the following is an accurate summary of the field installed quantities and description of work for the portion of the major storm drain system installed along the Homestead Road frontage of this site. Summary Description 36" diameter 1j2" diameter 1j8" diameter Manhole Catch Basin Estimated Lenqth 22 L. F. 292 L. F. 511 L.F. Ij Each 1 Each Master Storm Drain Report Unit Price $ 30.00 $ 37.00 $ 1j5.00 $600.00 $1j00.00 Estimated Total Extension $ 660.00 $10.801j.00 $22.995.00 $ 2.1j00.00 $ 1j00.00 $37.259.00 . "0 ¡;:::, PHIL AUGER. ~) PA:sc cc: Tim Kelly 2285 Martin Avenue, Suite A Santa Clara, California 95050 (408) 727-8262 ~ 1\. ~ ..~ -_._---~- - _.---- -_.--