CC Resolution No. 8363
RESOIlJI'ION NO. 8363
A RESOIlJI'ION OF THE Cl'I'Y CXXJNCIL OF THE Cl'I'Y OF aJPERl'INO
AUIHORIZING REIMElJRSn1ENT 'IO MARIANI GBœP OF cnœANIES
FRœ MASTER STORM DRAIN FUND FOR MASTER STORM LINE OONS'IRUCI'ED
IN CDNJUNcrION WITH TRAcr NO. 8325, HœŒSTEAD ROAD M DE ANZA
B:XJIEVARD
WHEREAS, in conjunction with the Developnent of Tract No. 8325
(Porotofoni) located at Homestead Road am De Anza Boulevard, the
developer, Mariani Group of Callpanies was required, in accordance with
City policy, to install certain master stenn drain facilities with
reiInbursement to be made by the city from the master stenn drain fund at
the c:xmpletion of the project; and
WHEREAS, the master stonn facilities in Tract 8325 has now been
caupleted by the developer and a reiInbursement in the ærount of $37,259.00
is in order as outlined in a attached Exhibit "A".
New, 'lliEREFORE, BE IT RESOLVED that the City Council of the City of
CUpertino hereby authorized the appropriation and reimbursement of
$37,259.00 from the master stenn drain fund to Mariani Group of Callpanies
as explained herein.
PASSED AND AOOPI'ED at a regular meeting of the city Council of the
City of CUpertino, this lst day of April , 1991, by the
following vote:
vote
Members of the City Council
AYES:
Rogers, Sorensen, Szabo, Koppel
NOFS:
None
ABSENT:
None
ABSTAIN:
Goldman
A'ITEST:
APImVED:
/s/ Dorothy Cornelius
City Clerk
/s/ Barb Koppel
Mayor, City of CUpertino
~
PHIL AUGER
Civil Engineer
~D~~D@lrD ~lrD@DlrD~~~~~ DlrD(Ço
Results
DON NUNES
Civil Engineer
March 1. 1991
88100
Bert J. Viskovich
City Engineer
City of Cupertino
10300 Torre Avenue
Cupertino. California 95011j
Re: Storm Drain Reimbursement Certification - Portofino
Dear Mr. Viskovich:
As per City Agreement with the developer. I hereby certify that the following
is an accurate summary of the field installed quantities and description of
work for the portion of the major storm drain system installed along the
Homestead Road frontage of this site.
Summary
Description
36" diameter
1j2" diameter
1j8" diameter
Manhole
Catch Basin
Estimated Lenqth
22 L. F.
292 L. F.
511 L.F.
Ij Each
1 Each
Master Storm Drain
Report Unit Price
$ 30.00
$ 37.00
$ 1j5.00
$600.00
$1j00.00
Estimated Total
Extension
$ 660.00
$10.801j.00
$22.995.00
$ 2.1j00.00
$ 1j00.00
$37.259.00 .
"0 ¡;:::,
PHIL AUGER. ~)
PA:sc
cc: Tim Kelly
2285 Martin Avenue, Suite A
Santa Clara, California 95050
(408) 727-8262
~
1\. ~
..~
-_._---~- - _.---- -_.--