Loading...
14020130TEMPORARY CERTIFICATE OF OCCUPANCY FORM CUPERTINO COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION ALBERTSALVADOR, P.E., G.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE - CUPERTINO, CA95014-3255 (408) 777-3228 - FAX (408) 777-3333 - building(a�cupertino.org APN: 316-07-049 BP3#20072, 14020126, 14020130 DATE: 3/20/18 vALOUATION $ SITE 1 Apple Park Wa ADDRESS: pP Y OWNER'S NAME: Campus Holdings, LLC p 9 PHONE #: 408-996-6684 FAX #: MAILING ADDRESS (if different from site address): 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 CONTRACTOR/POINT OF CONTACT: PHONE #: Holder Construction Company - Mike Drake FAX #: 708-204-3230 REFUND - CHECK PAYABLE TO: MAILING ADDRESS: Apple Inc. 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 TEMPORARY CERTIFICATE OF OCCUPANCY INFORMATION BOND TYPE: ❑ SURETY BONA AMOUNT (1 % VALUATION CODE ❑CHECK ❑CASH BOND F BOND: 5K min- 10K max) $ [BLDBONDSj EDITION: 2010 TCO EXPIRATION FEE: $329.00/mo TOTAL FEE: $ [ITEMPOCCJ DATE (6 MONTHS MAX): USE TYPE OF CONSTR FLOOR AREA OCC LOAD LEVEL COMMENT Entrance E4 and Sector A4 1 A 166,981 sf 1,626 L1-Plant See attached drawing for exclusions 4 L3 Pods 2-10 for 8-1 -2018 L3 OTHER DEPARTMENT ! AGENCY APPROVALS: anninq Signature :.......................................... ...... Date:.......,............... ❑ APPROVED ❑ APPROVED WITHCONDITIONS` Fire Signature: ............... Date:.............. .......... ❑APPROVED ❑APPROVED WITHCONDITiONS' PublicWorks Signature: ......................................................... Date:....................... ❑APPROVED 0 APPROVED WITH CONDITIONS' Other Signature: ............................................Date:....................... APPROVED El APPROVED WITH CONDITIONS' *CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of theproperty stating the list of items required to be completed for each individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersigned covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings complete and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specified. If this Temporary Certificate of Occupancy expires, the total amount of the bond may be forfeited and the non-compliance may result in an enforcement action. Owner / ,r / 4e Contractor Si nature:....k:L.i -. �• ................ Date MRJ ..�..... Si nature:................ ...... ........................... Date:..!..`'X!.47.... This temporary certificate ensures that all fire protection and 1rfe safety systems have been completed, inspected, successfully tested and approved for the specific area of the building specified above to provide a reasonable degree of safety to the occupants from fire and similar emer encies Buildino Official t ........................Print:.............................................. ....................... Date:.....s.....c-....i........... DEPARTMENT ACTION: After determination, copies to: 1) applicant, 2) permit file emp0ccFoma2013.doc revised 8/22I1 Wednesday, July 11, 2018 at 3:58:25 PM Pacific Daylight Time Subject: (none) Date: Tuesday, July 10, 2018 at 3:49:04 PM Pacific Daylight Time From: Dirk Mattern To: Albert Salvador CC: Traci Caton, Chris Fowler Albert, The Santa Clara County Fire Department has no objection to granting TCO approval for A4, L1 to Plant Level, with the following excluded areas: Level 1 Pod 2 Product Lab Stands 003 and 004. Level 1 Pod 10 Product Lab Stands 011 and 012. Level 1 Pod 11 Bookend Lab H 15. Level 2 Pod 10 Product Lab Stand 011 and X-Lab 012. Level 2 Pod 11 Bookend Lab H09. Regards, Dirk Page 1 of 1