Loading...
H16 A5 L2 P11TEMPORARY CERTIFICATE OF OCCUPANCY FORM COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION ALBERTSALVADOR, P.E., G.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 CUPERTINO (408) 777-3228 - FAX (408) 777-3333 - buildingtckupertino.org API : 316-07-049 BB 2017-0519 DATE: 6/26/18 PROJECT VALUATION $ SITE 1 Apple Park Wa ADDRESS: PP Y OWNER'S NAME: us Cam Holdings, LLC P 9 PHONE #: 408-996-6684 FAX #: MAILING ADDRESS (if differentfrom site address): 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 CONTRACTORIPOINT OF CONTACT: PHONE #: Holder Construction Company - Mike Drake FAX#: 708-204-3230 REFUND - CHECK PAYABLE TO: MAILING ADDRESS: Apple Inc. 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 TEMPORARY CERTIFICATE OF OCCUPANCY INFORMATION BOND TYPE: ❑ SURETY BOND MOUNT (1 % VALUATION CODE ❑CHECK CASH BOND F BOND: 5K min- 10K max) $ [BLDBONDS] EDITION: 2010 TCO EXPIRATION FEE: $329.00/ma TOTAL FEE: $ [1 TEMPOCC] DATE (6 MONTHS MAX): USE TYPE OF CONSTR FLOOR AREA OCC LOAD LEVEL COMMENT H16 A5 L2 P11 1 A 5,750 sf 57 L2 OTHER DEPARTMENT / AGENCY APPROVALS: anninq Signature: ................................................... ...... Date:....................... ❑ APPROVED ❑ APPROVED WITH CONDITIONS* ire Signature: .........................................................Date:.... -TrubTic 6 ❑ APPROVED ❑ APPROVED WITH CONDITIONS° Works Signature: .........................................................Date:................ ❑ APPROVED ❑ APPROVED WITH CONDITIONS` Uther: Signature:......................................................... Date:....................... ❑ APPROVED ❑ APPROVED WITH CONDITIONS' *CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of the property stating the list of items required to be completed for each individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersigned covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings complete and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specified. If this Temporary Certificate of Occupancy expires, the total amount of the bond may be forfeited and the non-compliance may result in en orce nt action. Owner o Zgt Contractor 6/26/18 ............ .4. Signature:. . ............... Date:...... Signature: .... .......... Date:...................... This temporary certificate ensures that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building specified above to provide a reasonable degree of safety to the occupants from fire and similar emer encies e pp (` Building Official:..... �. � 0� ...Print:............'. C.T �' t' ........... DEPARTMENT ACTION: After determination, copies to: 1) applicant, 2) permit file empOccForn&013.doc revised &22117 Wednesday, August 1, 2018 at 2:14:52 PM Pacific Daylight Time Subject: Fwd: Status of 4LEAF Recommendation for TCO for A5 Level 2, Pod 11, GL 65-66 H16 Bookend Lab Date: Wednesday, August 1, 2018 at 1:10:58 PM Pacific Daylight Time From: Dirk Mattern To: Albert Salvador CC: Traci Caton, Chris Fowler Albert, The Santa Clara County Fire Department has no objection to granting TCO for the H16 Bookend Lab, A5 Level 2, Pod 11, GL 65-66. Regards, Dirk From: "Traci Caton" <tcaton@41eafinc.com> To: "Dirk Mattern" <dirk.mattern@sccfd.org>, "Albert Salvador" <AlbertS@cupertino.org> Cc: "Chris Fowler" <cfowler@41eafinc.com>, "Craig Tole" <ctole@41eafinc.com>, "Mike Drake" <mdrake@holder.com>, "Todd Turner" <toturner@holder.com>, "Mike Ossei-Antwi" <mosseiantwi@holder.com>, "Paul Yeomans" <pyeomans@apple.com>, "Bill Keane" <wkeane@apple.com>, "Sean Hatch" <SeanH@cupertino.org> Sent: Wednesday, August 1, 2018 10:06:52 AM Subject: Status of 4LEAF Recommendation for TCO for A5 Level 2, Pod 11, GL 65-66 H16 Bookend Lab Good morning Albert & Dirk, Pending SCCFD approval, 4LEAF is ready to recommend TCO for the H16 Bookend Lab, A5 Level 2, Pod 11, GL 65-66. The Main Building H16 Bookend Lab, Area A5 Level 2, Pod 11, GL 65-66 is substantially in conformance with approved construction documents & Project Designers revisions. See the attached full TCO packet for your review. TCO is pending required approval from Albert Salvador (City of Cupertino Building Official) and Chief Dirk Mattern (SCCFD) of this TCO as requested by Contractor / Design Professional (see attached). OUTSTANDING ITEMS: • SCCFD Approval. • Contractor to provide specific TAB report for the fume hoods prior to C of O. Holder provided a revised TAB report for H16 from Nabco dated 7/26/2018 but it is not specific to the Fume Hoods as requested. • Fire Resistant Rated Doors shall be self -closing and latching. • Need CSD approval of public tie-in prior to C of O. Flow has been verified for TCO. • Excluded items from all Milestone inspections will require additional Page 1 of 2