Loading...
TCO - LAB SO7 A7 L3 P11TEMPORARY CERTIFICATE OF OCCUPANCY FORM CUPERTINO COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • building@cupertino.org APN: 316-07-049 B B2%17-0519 DATE: 4/11 /18 PROJECT VALUATION $ SITE 1 Apple Park Wa ADDRESS: pp Y OWNER'S NAME: Campus Holdings, LLC p 9 PHONE #: 408-996-6684 FAX #: MAILING ADDRESS (if different from site address): 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 CONTRACTOR/POINT OF CONTACT: PHONE #: Holder Construction Company - Mike Drake FAX#: 708-204-3230 REFUND - CHECK PAYABLE TO: MAILING ADDRESS: Apple Inc. 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 TEMPORARY CERTIFICATE OF OCCUPANCY INFORMATION BOND TYPE: ❑SURETY BOND MOUNT (1% VALUATION CODE []CHECK ❑CASH BOND F BOND: 5K min- 10K max) $ [BLDBONDS] EDITION: 2010 TCO EXPIRATION FEE: $329.00/mo TOTAL FEE: $ [1TEMPOCC) DATE (6 MONTHS MAX): USE TYPE OF CONSTR FLOOR AREA OCC LOAD LEVEL COMMENT Lab S07 A7 L3 P11 1 A 5,750 sf 59 L3 Previously excluded from A7 TCO OTHER DEPARTMENT / AGENCY APPROVALS: anrnnq Signature: ........ ................................................ Date:....................... ❑ APPROVED ❑ APPROVED WITH CONDITIONS' Fire Signature: ......... >- Date: �.` Z �l D []APPROVED ❑ APPROVED WITHCONDITIONS- u is Works Signature: ................... ­ .......... ......................... Date:....................... O APPROVED ❑ APPROVED WITH CONDITIONS` Other: Signature: .........................................................Date:....................... 13APPROVED El APPROVED WITHCONNTIONS` *CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of the property stating the list of items required to be completed for each individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersigned covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings complete and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specified. If this Temporary Certificate of Occupancy expires, the total amount of the bond may be forfeited and the non-compliance may result in an enforcement action. Owner `/. . 0 i/ Contractor Signature: ...........:.............•...............,................. Date:..��1 &#...... Signature:................ ........................... Date:... 0¢ . This temporary certificate ensures that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building specified above to provide a reasonable degree of safety to the occupants from fire and similar emer encie Building Official ... ..."............................................................ Print: ............... Date:... Z-14—I DEPARTMENT ACTION: After determination, copies to: 1) applicant, 2) permit file en:pOceForm[ 2013.doc revised 8/22117 Thursday, May 24, 2018 at 9:58:42 AM Pacific Daylight Time Subject: Fwd: Status of 4LEAF Recommendation for TCO for A7 Level 3, Pod 11 Bookend S07, GL 91-92 Date: Thursday, May 24, 2018 at 9:55:13 AM Pacific Daylight Time From: Dirk Mattern To: Albert Salvador CC: Traci Caton, Chris Fowler Albert, The Santa Clara County Fire Department has no objection to granting TCO for A7 Level 3, Pod 11 Bookend S07, GL 91-92. Regards, Dirk From: "Traci Caton" <tcaton@4leafinc.com> To: "Albert Salvador" <AlbertS@cupertino.org>, "Dirk Mattern" <dirk.mattern@sccfd.org> Cc: "Craig Tole" <ctole@41eafinc.com>, "Chris Fowler" <cfowler@41eafinc.com>, "Mike Drake" <mdrake @holder.com>, "Mike Ossei-Antwi" <mosseiantwi@holder.com>, "Paul Yeomans" <pyeomans@apple.com>, "Bill Keane" <wkeane@apple.com>, "Sean Hatch" <SeanH@cupertino.org> Sent: Wednesday, May 23, 2018 12:56:31 PM Subject: Status of 4LEAF Recommendation for TCO for A7 Level 3, Pod 11 Bookend S07, GL 91-92 Good afternoon Albert & Dirk, Pending SCCFD approval, 4LEAF is ready to recommend TCO for Bookend S07: A7 Level 3, Pod 11. Contractor is requesting an amendment to the existing A7 TCO to include Pod 11 on Level 3. This pod is identified in the plans as Bookend S07 and is part of building permit no: B-2017-0519. The Main Building area A7 L3 Pod 11, GL 91-92 is substantially in conformance with approved construction documents & Project Designers revisions. See the attached full TCO packet for your review. TCO is pending required approval from Albert Salvador (City of Cupertino Building Official) and Chief Dirk Mattern (SCCFD) of this TCO as requested by Contractor / Design Professional (see attached). OUTSTANDING ITEMS: • SCCFD Approval • CSD approval of public tie-in prior to C of O. Flow has been verified for TCO • Final inspections for all excluded items from all Milestones and inspections Pagel of 2