Loading...
TCO-A5 L1 P11TEMPORARY CERTIFICATE OF OCCUPANCY FORM COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION ALBERTSALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 C U PERTI N O (408) 777-3228 • FAX (408) 777-3333 • building(cDcupertino.org APN: 316-07-049 TB B 2b17-0519 DATE: 5/22/18 PROJECT VALUATION SITE ADDRESS: 1 Apple a le Park Way y OWNER'S NAME: Campus Holdings, LLC PHONE M 408-996-6684 FAX M MAILING ADDRESS (if different from site address): 1 Infinite LOOP, MS 21-AC2, Cupertino, CA 95014 CONTRACTOR/POINT OF CONTACT: PHONE M Holder Construction Company - Mike Drake FAX#: 708-204-3230 REFUND - CHECK PAYABLE TO: MAILING ADDRESS: Apple Inc. 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 TEMPORARY CERTIFICATE OF OCCUPANCY INFORMATION BOND TYPE: ❑ SURETY BOND OUNT (1 % VALUATION CODE ❑CHECK ❑CASH BOND BOND: 5K min- 10K max) $ [BLDBONDS] rF EDITION: 2010 TCO EXPIRATION FEE: $329.001mo TOTAL FEE: $ [iTEMPOCCJ DATE (6 MONTHS MAX): USE TYPE OF CONSTR FLOOR AREA OCC LOAD LEVEL COMMENT Bookend Lab S06 1 A 2,750 sf 30 L1 A6 Li P11 OTHER DEPARTMENT 1 AGENCY APPROVALS: anrnnq Signature: .........................................................Date:................,...... ❑ APPROVED ❑ APPROVED WITHCONDITIONS' ire Signature: ........... .....................................Date: []APPROVED ❑ APPROVED WITHCONDITIONS' Public Works Signature: ............... _ ...................... ................ ignature:........................................................ Date:....................... ❑ APPROVED ❑ APPROVED WITHCONDITIONS' Uther. Signature: .........................................................Date:....................... ❑ APPROVED ❑ APPROVED WITHCONDITIONS' "CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of theproperty stating the list of items required to be completed for each individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersigned covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings complete and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specified. If m orary Certificate of Occupancy expires, the total amount of the bond may be forfeited and the non-compliance may result' an enforcemen ction. Owner Contractor Si nature:......... .......'............ Date; .. Z..1 Si nature :..................................................... Date: 5/22/1.8..... This temporary certificate ensures that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building specified above to provide a reasonable degree of safety to the occupants from fire and similar emergencies4, Building Official: ..... 1W . ......:... .... ..:......................Print:....... !.... . ...... ....(....................f..... ..... Date: ":�.�...Ll".U........ DEPARTMENT ACTION: After determination, copies to: 1) applicant, 2) permit file empOccForn&2013.doc revised &122117 Friday, September 28, 2018 at 11:09:41 AM Pacific Daylight Time Subject: Fwd: Status of 4LEAF Recommendation for TCO for A6 Level 1, Pod 1, GL 68-69 S06 Bookend Lab Date: Friday, September 28, 2018 at 10:53:23 AM Pacific Daylight Time From: Dirk Mattern To: Albert Salvador CC: Traci Caton, Chris Fowler Albert, The Santa Clara County Fire Department has no objection to granting TCO for A6 Level 1, Pod 1, GL 68-69 S06 Bookend Lab. Regards, Dirk From: "Traci Caton" <tcaton@41eafinc.com> To: "Albert Salvador" <AlbertS@cupertino.org>, "Dirk Mattern" <dirk.mattern@sccfd.org> Cc: "Craig Tole" <ctole@4leafinc.com>, "Chris Fowler" <cfowler@41eafinc.com>, "Mike Drake" <mdrake@holder.com>, "Todd Turner" <toturner@holder.com>, "Mike Ossei-Antwi" <mosseiantwi@holder.com>, "Paul Yeomans" <pyeomans@apple.com>, "Bill Keane" <wkeane@apple.com>, "Sean Hatch" <SeanH@cupertino.org> Sent: Wednesday, July 25, 2018 3:40:16 PM Subject: Status of 4LEAF Recommendation for TCO for A6 Level 1, Pod 1, GL 68-69 S06 Bookend Lab Good afternoon Albert & Dirk, Pending SCCFD approval, 4LEAF is ready to recommend TCO for A6 Level 1, Pod 1, GL 68-69 S06 Bookend Lab. The Main Building Area A6 Level 1, Pod 1, GL 68-69 S06 Bookend Lab is substantially in conformance with approved construction documents & Project Designers revisions. See the attached full TCO packet for your review. TCO is pending required approval from Albert Salvador (City of Cupertino Building Official) and Chief Dirk Mattern (SCCFD) of this TCO as requested by Contractor / Design Professional (see attached). OUTSTANDING ITEMS: • SCCFD Approval • Fire Resistant Rated Doors shall be self -closing and latching. • Need CSD approval of public tie-in prior to C of O. Flow has been verified for TCO. • Excluded items from all Milestone inspections will require additional inspections prior to C of O. Page 1 of 2