Loading...
TCO-BOOKEND LAB H07 A6 L4 P1TEMPORARY CERTIFICATE OF OCCUPANCY FORM COMMUNITY DEVELOPMENT DEPARTMENT- BUILDING DIVISION ALBERT SALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 CUPERTINO(408)777-3228+FAX (408)777-3333-building@cupeOino.org APN:PROJECT 316-07-049 TB$-2()17-0519 DATE: 5/22/18 VALUATION SITE ADD 1 Apple Park Wa ADDRESS; Pp Y OWNER'S NAME: Campus Holdings, LLC P 9 PHONE* 408-996-6684 FAX #: MAILING ADDRESS (if different from site address): 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 CONTRACTOR/POINT OF CONTACT: PHONE #: Holder Construction Company - Mike Drake FAX #: 708-204-3230 REFUND - CHECK PAYABLE TO: MAILING ADDRESS: Apple Inc. 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 TEMPORARY CERTIFICATE OF OCCUPANCY INFORMATION BOND TYPE: ❑SURETYBOND MOUNT (1%a VALUATION CODE ❑CHECK F BOND: 5K min-10K max) $ 2010 ❑CASH BOND [BLDBQNDS] EDITION: TCO EXPIRATION FEE: S329.00/mo TOTAL FEE: $ [1T'EMPOCC] DATE (6 MONTHS MAX): USE TYPE OF CONSTR FLOOR AREA OCC LOAD LEVEL COMMENT Bookend Lab H07 1 A 5,750 sf 57 L4 A6 L4 P1 OTHER DEPARTMENT / AGENCY APPROVALS: Filanninq Signature: ......................................................... Date: ..... ............pp..... ❑ APPROVED ❑ APPROVED WITHCONDITIONS' Siire 0`1" t 4 ' gnature: .........................................................Date:.......,...........,._ ❑ APPROVED ❑ APPROVED WITHCONDITIONS' Public Works Signature: ... ................ Date:....................... ❑ APPROVED ❑ APPROVED WITHCONDITIONS' Uther: Signature: .................. .... Date:..........,.. .... ❑ APPROVED ❑ APPROVED WITHCONDITIONS- 'CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of the property stating the list of items required to be completed for each Individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersigned covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings complete and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specified. If this Temporary Certificate of Occupancy expires, the total amount of the bond may be forfeited and the non-compliance may result infan• srfto""rceme clion. Owner Contractor 118 Si nature:..........,..-.-- ..... ~............. Date:.-� ZJr..I ;.. Signature:...... ............................................... Date: 5/22...--- This temporary certificate ensures that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building specified above to provide a reasonable degree of safety to the occupants from fire and similar emergencies, f � C �1 BuildingOfficial• .. _k, Print:..... '� `� v........6....j`:..........Date:..E?.... At? ........ DEPARTMENT ACTION: After determination, copies to: 1) applicant, 2) permit file emp0ccForn f 2013.dac revived V2 217 7 Thursday, June 7, 2018 at 4:23:43 PM Pacific Daylight Time Subject: Fwd: Status of 4LEAF Recommendation for TCO for A6 Level 4, Pod 1 Bookend H07, GL 68-69 Date: Thursday, June 7, 2018 at 3:17:02 PM Pacific Daylight Time From: Dirk Mattern To: Albert Salvador CC: Traci Caton, Chris Fowler Albert, The Santa Clara County Fire Department has no objection to granting TCO for Bookend H07: A6 Level 4, Pod 1. Regards, Dirk From: "Traci Caton" <tcaton@41eafinc.com> To: "Albert Salvador" <AlbertS@cupertino.org>, "Dirk Mattern" <dirk.mattern@sccfd.org> Cc: "Craig Tole" <ctole@41eafinc.com>, "Chris Fowler" <cfowler@41eafinc.com>, "Mike Drake" <mdrake @holder.com>, "Mike Ossei-Antwi" <mosseiantwi@holder.com>, "Paul Yeomans" <pyeomans@apple.com>, "Bill Keane" <wkeane@apple.com>, "Sean Hatch" <SeanH@cupertino.org> Sent: Thursday, June 7, 2018 2:53:01 PM Subject: Status of 4LEAF Recommendation for TCO for A6 Level 4, Pod 1 Bookend H07, GL 68-69 Good afternoon Albert & Dirk, Pending SCCFD approval, 4LEAF is ready to recommend TCO for Bookend H07: A6 Level 4, Pod 1. Contractor is requesting an amendment to the existing A6 TCOs to include Pod 1 on Level 4. This pod is identified in the plans as Bookend H07 and is part of building permit no: B-2017-0519. The Main Building area A6 L4 Pod 1, GL 68-69 is substantially in conformance with approved construction documents & Project Designers revisions. See the attached full TCO packet for your review. TCO is pending required approval from Albert Salvador (City of Cupertino Building Official) and Chief Dirk Mattern (SCCFD) of this TCO as requested by Contractor / Design Professional (see attached). OUTSTANDING ITEMS: • SCCFD Approval • CSD approval of public tie-in prior to C of O. Flow has been verified for TCO • Final inspections for all excluded items from all Milestones and inspections prior to C of O. Pagel of 2