Loading...
TCO-BOOKEND LAB S03 A6 L3 P1TEMPORARY CERTIFICATE OF OCCUPANCY FORM COMMUNITY DEVELOPMENT DEPARTMENT - BUILDING DIVISION ALBERTSALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE - CUPERTINO, CA 95014-3255 C U P E RTI N O (408) 777-3228 - FAX (408) 777-3333 - building(@cupertino.org APN:316-07-049 BB-2b17-0519 DATE: 5/22/18 IYALPROJECTUATION SITE 1 Apple Park Wa ADDRESS: pp Y OWNER'S NAME: Campus Holdings, LLC PHONE #' 408-996-6684 MAILING ADDRESS (if different from site address): 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 CONTRACTOR/POINT OF CONTACT: PHONE #: Holder Construction Company - Mike Drake FAX #: 708-204-3230 REFUND - CHECK PAYABLE TO: MAILING ADDRESS: Apple Inc. 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 TEMPORARY CERTIFICATE OF OCCUPANCY INFORMATION BOND TYPE: ❑ SURETY BOND JAMOUNT (1 % VALUATION CODE ❑CHECK ❑CASH BOND F BOND: 5K min- 10K max) 5 [BLDBONDSj EDITION: 2010 TCO EXPIRATION FFEE.-S329.00/mo TOTAL FEE: $ [1TEMPOCCJ DATE (6 MONTHS MAX): USE TYPE OF CONSTR FLOOR AREA OCC LOAD LEVEL COMMENT Bookend Lab S03 1 A 5,750 sf 55 L3 A6 L3 P1 OTHER DEPARTMENT / AGENCY APPROVALS: anninq ................... Signature: .... ---- ........................ Date:....................... ❑ APPROVED E3 APPROVED WITH CONDITIONS- Signature: .........................................................Date�^�Etj�� �� ��zz C�. ❑ APPROVED ❑ APPROVED WITHCONDITIONS' Public Works ignature:..................................................... ..,.Date:....................... Signature: ..................................................... APPROVED 0 APPROVED WITH CONDITIONS' er. Signature: ......................................... ............... Date: ....... ............... APPROVED 11 APPROVED WITHCONDITIONS' "CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of the property stating the list of items required to be completed for each individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersigned covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings complete and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specified. If this Temporary Certificate of Occupancy expires, the total amount of the bond may be forfeited and the non-compliance may result in an -enforcement action. Owner s Contractor15 - ........ Date: . Signature: ...... ..... Dae:5i nature:..t......5/22/18 This temporary certificate ensures that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building specified above to provide a reasonable degree of safety to the occupants from fire and similar emergencies, I rr,,�� ""C, n Building Official:.... .Print:...(.l(itr.::..9"r- ............4.1............Date:.. DEPARTMENT ACTION: After determination, copies to: 1) applicant, 2) permit file enrpOccForrr{?/113.c1oc revis,,d &:2117 Friday, September 28, 2018 at 10:57:28 AM Pacific Daylight Time Subject: Fwd: Status of 4LEAF Recommendation for TCO for A6 Level 3, Pod 1, GL 68-69 S03 Bookend Lab Date: Friday, September 28, 2018 at 10:52:01 AM Pacific Daylight Time From: Dirk Mattern To: Albert Salvador CC: Traci Caton, Chris Fowler Albert, The Santa Clara County Fire Department has no objection to granting TCO for A6 Level 3, Pod 1, GL 68-69 S03 Bookend Lab. Regards, Dirk From: "Traci Caton" <tcaton@41eafinc.com> To: "Albert Salvador" <AlbertS@cupertino.org>, "Dirk Mattern" <dirk.mattern@sccfd.org> Cc: "Craig Tole" <ctole@41eafinc.com>, "Chris Fowler" <cfowler@41eafinc.com>, "Mike Drake" <mdrake@holder.com>, "Todd Turner" <toturner@holder.com>, "Mike Ossei-Antwi" <mosseiantwi@holder.com>, "Paul Yeomans" <pyeomans@apple.com>, "Bill Keane" <wkeane@apple.com>, "Sean Hatch" <SeanH@cupertino.org> Sent: Wednesday, July 25, 2018 3:34:16 PM Subject: Status of 4LEAF Recommendation for TCO for A6 Level 3, Pod 1, GL 68-69 S03 Bookend Lab Good afternoon Albert & Dirk, Pending SCCFD approval, 4LEAF is ready to recommend TCO for A6 Level 3, Pod 1, GL 68-69 S03 Bookend Lab. The Main Building Area A6 Level 3, Pod 1, GL 68-69 S03 Bookend Lab is substantially in conformance with approved construction documents & Project Designers revisions. See the attached full TCO packet for your review. TCO is pending required approval from Albert Salvador (City of Cupertino Building Official) and Chief Dirk Mattern (SCCFD) of this TCO as requested by Contractor / Design Professional (see attached). OUTSTANDING ITEMS: • SCCFD Approval • Fire Resistant Rated Doors shall be self -closing and latching. • Need CSD approval of public tie-in prior to C of O. Flow has been verified for TCO. • Excluded items from all Milestone inspections will require additional inspections prior to C of O. Thank you, Page 1 of 2