Loading...
TCO-LAB S04 A7 L1 P11TEMPORARY CERTIFICATE OF OCCUPANCY FORM CUPERTINO COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERTSALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 • FAX (408) 777-3333 • buildina &cupertino.org APN: 316-07-049 7 B B 2017-0519 DATE: 4/1 1 /1 VALUATION $ SITE 1 Apple Park Wa ADDRESS: pp Y OWNER'S NAME: Campus Holdings, LLC p PHONE #: 408-996-6684 FAX #: MAILING ADDRESS (if different from site address): 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 CONTRACTOR/POINT OF CONTACT: PHONE #: Holder Construction Company - Mike Drake FAX#: 708-204-3230 REFUND - CHECK PAYABLE TO: MAILING ADDRESS: Apple Inc. 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 TEMPORARY CERTIFICATE OF OCCUPANCY INFORMATION BOND TYPE: ❑ SURETY BOND MOUNT (1 % VALUATION CODE ❑CHECK []CASH BOND F BOND: 5K min- 10K max) $ [BLDBONDS] EDITION: 2010 TEXPIRATION FEE: $329.00/mo TOTAL FEE: $ [9TEMPOCC] DATCT E (6 MONTHS MAX): USE TYPE OF CONSTR FLOOR AREA OCC LOAD LEVEL COMMENT Lab SO4 A7 L1 P11 1 A 5,7940 sf 77 L1 Previously excluded from A7 TCO OTHER DEPARTMENT I AGENCY APPROVALS: annma Signature: ......................................................... Date:....................... ❑ APPROVED ❑ APPROVED WITH CONDITIONS" ire l . . Signature: ......................................................... Date:................... .. [3APPROVED ❑ APPROVED WITH CONDITIONS' u ors Signature: ......................................................... Qate:....................... ❑ APPROVED ❑ APPROVED WITH CONDITIONS' Other: Signature ......................... Date:....................... 0 APPROVED ❑ APPROVED WITH CONDITIONS" *CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of the property stating the list of items required to be completed for each individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersigned covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings complete and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specified. If this Temporary Certificate of Occupancy expires, the total amount of the bond may be forfeited and the non-compliance may result in an enforcement action. Owner Contractor Signature:......... ham'. ..: ............. Date:...`.`, 7// .... Signature:............. ..... ....... ................. ..... Date:... r ..Ir ..... This temporary certificate ensures that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building specified above to provide a reasonable degree of safety to the occupants from fire and similar eme encies. JJ Buildin...............Print:.......'....... .1....... .............�� .............Date:..,.IIL:"4'"�..... DEPARTMENT ACTION: After determination. conies to: 11 aoolicant. 21 Dermit file empeccForm02013.doc revised &22117 Tuesday, May 29, 2018 at 9:16:14 AM Pacific Daylight Time Subject: Fwd: Status of 4LEAF Recommendation for TCO for A7 Level 1, Pod 11 Bookend SO4, GL 91-92 Date: Tuesday, May 29, 2018 at 9:01:57 AM Pacific Daylight Time From: Dirk Mattern To: Albert Salvador CC: Traci Caton, Chris Fowler Albert, The Santa Clara County Fire Department has no objection to granting TCO for Bookend SO4: A7 Level 1, Pod 11. Regards, Dirk From: "Traci Caton" <tcaton@41eafinc.com> To: "Albert Salvador" <AlbertS@cupertino.org>, "Dirk Mattern" <dirk.mattern@sccfd.org> Cc: "Craig Tole" <ctole@41eafinc.com>, "Chris Fowler" <cfowler@41eafinc.com>, "Mike Drake" <mdrake@holder.com>, "Mike Ossei-Antwi" <mosseiantwi@holder.com>, "Paul Yeomans" <pyeomans@apple.com>, "Bill Keane" <wkeane@apple.com>, "Sean Hatch" <SeanH@cupertino.org> Sent: Tuesday, May 29, 2018 8:16:46 AM Subject: Status of 4LEAF Recommendation for TCO for A7 Level 1, Pod 11 Bookend SO4, GL 91-92 Good morning Albert & Dirk, Pending SCCFD approval, 4LEAF is ready to recommend TCO for Bookend SO4: A7 Level 1, Pod 11. Contractor is requesting an amendment to the existing A7 TCO to include Pod 11 on Level 1. This pod is identified in the plans as Bookend SO4 and is part of building permit no: B-2017-0519. The Main Building area A7 L1 Pod 11, GL 91-92 is substantially in conformance with approved construction documents & Project Designers revisions. See the attached full TCO packet for your review. TCO is pending required approval from Albert Salvador (City of Cupertino Building Official) and Chief Dirk Mattern (SCCFD) of this TCO as requested by Contractor / Design Professional (see attached). OUTSTANDING ITEMS: • SCCFD Approval • CSD approval of public tie-in prior to C of O. Flow has been verified for TCO Page 1 of 2