Loading...
TCO-SECTOR A5 1D STUDIOTEMPORARY CERTIFICATE OF OCCUPANCY FORM CUPERTINO COMMUNITY DEVELOPMENT DEPARTMENT • BUILDING DIVISION ALBERTSALVADOR, P.E., C.B.O., BUILDING OFFICIAL 10300 TORRE AVENUE • CUPERTINO, CA 95014-3255 (408) 777-3228 - FAX (408) 777-3333 • buildin cupertino.org APNPROJECT : 316-07-049 B B 017.0520 DATE: 7/23/18 [VALUATION SITE 1 Apple Park Wa ADDRESS: pp Y OWNER'S NAME: Campus Holdings, LLC � 9 PHONE #: 408-996-6684 FAx #: MAILING ADDRESS (if different from site address): 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 CONTRACTOR/POINT OF CONTACT: PHONE M Holder Construction Company - Mike Drake FAX#: 708-204-3230 REFUND - CHECK PAYABLE TO: MAILING ADDRESS: Apple Inc. 1 Infinite Loop, MS 21-AC2, Cupertino, CA 95014 TEMPORARY CERTIFICATE OF OCCUPANCY INFORMATION BOND TYPE: ©SURETY BOND MOUNT (1% VALUATION CODE ❑CHECK ❑CASH BOND F BOND: 5K min- 10K max) $ [BLDBONDS] 2010 EDITION: TCO EXPIRATION FEE: $329.00/mo TOTAL FEE: $ [1TEMPOCCJ DATE (6 MONTHS MAX): USE TYPE OF CONSTR FLOOR AREA occ LOAD LEVEL COMMENT Sector A5 ID Studio 1 A 72,152 Sf 911 1-3-1-4 Includes W P1-P2 Inner only and all of L4 See attached for clarification on L3 OTHER DEPARTMENT / AGENCY APPROVALS: Siannq gnature: ......................................................... Date:........,.............. ❑ APPROVED ❑ APPROVED WITHCONDITIONS' ire Signature: ..... 1 Date:.1 C'-16— U ❑ APPROVED ❑ APPROVED WITHCONDITIONS' Flublic Works Signature: ..... ........................................ Date:,...................... ❑ APPROVED ❑ APPROVED WITHCONDITIONS" Uther: Signature: ......................................................... Date: ....................... ❑ APPROVED ❑ APPROVED WITHCONDITIONS' `CONDITIONS OF COMPLETION - Attach a letter signed by the contractor and owner of the property stating the list of items required to be completed for each individual Department before final occupancy can be granted. Include approximate completion dates for each item. The undersigned covenant and agree as a condition to the approval of the above request for temporary occupancy to have the building or buildings complete and in compliance with all building codes, ordinances and regulations and ready for inspection prior to the expiration date specified. If this Temporary Certificate of Occupancy expires, the total amount of the bond may be forfeited and the non-compliance mayresult i n enforcem ction. Owner kt Contractor Signalure:.1..... ... .......~.. ....... Dater. u!...a.t.... Signature: ......... Date. 7/23/18 . ... This temporary certificate ensures that all fire protection and life safety systems have been completed, inspected, successfully tested and approved for the specific area of the building specified above to provide a reasonable degree of safety to the occupants from fire and similar emergencies.4, Building Official:......:................................�....................Print:........................ Date:... DEPARTMENT ACTION: After determination, copies to: 11 aoDlicant. 21 permit file emp0ccForit&'013.c1oc revised �W-2f17 Thursday, October 18, 2018 at 11:10:38 AM Pacific Daylight Time Subject: Fwd: Status of 4LEAF Recommendation for TCO for A5 Level 4, Pods 1 through 11, Gridlines D- L/55-66 including A5 L3 GL E-G/55-57 for the ID Studio Mechanical Plant Room Date: Thursday, October 18, 2018 at 10:35:01 AM Pacific Daylight Time From: Dirk Mattern To: Albert Salvador CC: Traci Caton Albert, The subject areas were previously approved (by County Fire) on 8/17/18 for TCO with the exclusions noted below. Those areas are no longer excluded from TCO approval. • POD 1: Paint Booth and Paint Booth Vestibule • POD 2: Equipment corridor • POD 5-6 and 7-8: Concealed space behind TVs • POD 10: Speaker Room (hidden) Regards, Dirk From: "Dirk Mattern" <dirk.mattern@sccfd.org> To: "Albert Salvador" <alberts@cupertino.org> Sent: Thursday, October 18, 2018 10:24:33 AM Subject: Fwd: Status of 4LEAF Recommendation for TCO for A5 Level 4, Pods 1 through 11, Gridlines D-L/55-66 including A5 L3 GL E-G/55-57 for the ID Studio Mechanical Plant Room Albert, The Santa Clara County Fire Department has no objection to granting TCO approval for A5 Level 4, Pods 1 through 11, Gridlines D-L/55-66 including A5 L3 GL E-G/55-57 for the ID Studio Mechanical Plant Room. Regards, Dirk From: "Traci Caton" <tcaton@41eafinc.com> To: "Dirk Mattern" <dirk.mattern@sccfd.org>, "Albert Salvador" <AlbertS@cupertino.org> Cc: "Sean Hatch" <SeanH@cupertino.org>, "Chris Fowler" <cfowler@41eafinc.com>, "Craig Tole" <ctole@41eafinc.com>, "Mike Drake" <mdrake@holder.com>, "Todd Turner" <toturner@holder. com>, "Mike Ossei-Antwi" <mosseiantwi@holder.com>, "Paul Yeomans" <pyeomans@apple.com>, "Bill Keane" <wkeane@apple.com>, "Gerald Ebersole" <gebersole@apple.com>, "Peter Sokoloff" <psokoloff@Fostera nd Partners. com> Sent: Friday, August 31, 2018 1:43:07 PM Subject: Status of 4LEAF Recommendation for TCO for A5 Level 4, Pods 1 through 11, Gridlines D-L/55-66 including A5 L3 GL E-G/55-57 for the ID Studio Mechanical Plant Room Pagel of 2