Loading...
A-1 - SITE PLANCAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV CAPABLE EV S 0°13'00" E 372.28' N 0°13'00" W 372.28' S 8 9 ° 36 ' 0 0 " W 22 4. 9 6 ' N 8 9 ° 3 6 ' 0 0 " E 22 4 . 9 6 ' PR O P E R T Y L I N E PROPERTY LINE PR O P E R T Y L I N E PROPERTY LINE PARKING NO PARKING NO NO PARKING VANVAN Exception #8 of Prelim Title G A-3 2 A-3 4 A-3 3 A-3 1 A-1 2 ADJACENT TENANT SPACE S T E V E N S C R E E K B L V D. SHANE CO SUITE S2 S3S3 S3S3 S3S3 S3S3S3S3 S3S3 S3S3 S3 S3S3 S3S3 S3 S3S3 S6 S7 S7 S7 S7 S7 S7S7 S7 S7 S7 S7 S7 S7 S7 S8 S8 S11 S12 S13 S14 S15 S16 S16 S17 S18 S21 S22 S24 S24 S24 S24 S24 S26S26 S26S26 S31 S33S33 CL R . 4' - 3 " M I N . S19 S34 S35 S35 S35 S35 S35 S35 L1 L1 L3 L2 L3 L3 L3 L3 L3 L3 DEMO PROPOSED DE M O PR O P O S E D S3 S3 S7 S36S36 S37 S38S38 S38S38 S38S38 SETBACK DIAGRAM 49' - 3" S2 L4 L4 L4 L4L4 L4 (E) ROOF LINE (VARIEIS) 113' -6" FIRST FLOOR (F.F.) 100' - 0" (E) HIGH PARAPET LEVEL 120' - 1" (E) LOW PARAPET LEVEL 116' -1" (N) ENTRY TOWER LEVEL 122' - 0" 45°1:1 SLOPEMARK DESCRIPTION TYPE L1 4" OUTDOOR CYLINDER -FC OUTDOOR LIGHTING ZFCC410 (DOWN LT ONLY)WALL MTD L2 4" RECESSED SOFFIT -LITHONIA LIGHTING LBR4 RECESSED L3 LED FLOOD LIGHT -RSXF1 (FIXTURE TO MATCH (E) L.L. PROVIDED FIXTURES)WALL MTD L4 18" WALL SCONCE -WDGE3 LED (FIXTURE TO MATCH (E) L.L. PROVIDED FIXTURES) WALL MTD NOTES BE N J A M I N T A L P O S REVISIONS: C-31704 5/ 1 0 / 2 0 2 3 2 : 0 7 : 0 7 P M E: \ S h a n e C o _ C u p e r t i n o \ E X T E R I O R \ V E O p t i o n \ S H A N E C O _ C U P E R T I N O _ V E . r v t 5/10/23 SH A N E C O . E X T E R I O R I M P R O V E M E N T S PL A N N I N G SU B M I T T A L SI T E P L A N A-1 STACEY HALL 19 9 0 0 S T E V E N S C R E E K B L V D . , C U P E R T I N O , C A KEYNOTES - SITE Key Value Keynote Text S2 (E) ACCESSIBLE PARKING STALLS AND SIGNAGE TO REMAIN. S3 (E) PARKING STALL TO REMAIN, TYP. S6 (E) PAVING/WALKABLE SURFACE TO REMAIN, TYP. S7 (E) LANDSCAPE PLANTING AREA TO REMAIN. GC TO REPLACE (E) PLANTINGS AS REQ'D FOR NEW WORK. VERIFY PLANTING TYPE w/ AS-BUILTS AND MATCH (E). GC TO MODIFY (E) IRRIGATION SYSTEM AS REQ'D FOR NEW WORK. VERIFY EXTENTS IN THE FIELD. S8 (E) SHORT-TERM BIKE RACK TO REMAIN. S11 (E) TRANSFORMER TO REMAIN. S12 (E) TRUNCATED INDICATOR DOMES, TYP. S13 (E) TRASH ENCLOSURE TO REMAIN. S14 (E) FIRE DEPARTMENT VEHICLE TURNING RADIUS - PREVIOUSLY APPROVED, TYP. S15 (E) GAS METER AND FIRE SPRINKLER SERVICE TO REMAIN. S16 (E) "FUTURE" ELECTRIC VEHICLE PARKING STALL, TYP. VERIFY FINAL LOCATION AND QUANTITY W/ L.L. DWGS. S17 (E) MAIL/PARCEL BOX TO REMAIN. S18 (E) WHEELSTOP TO REMAIN, TYP. S19 ACCESSIBLE PATH OF TRAVEL. S21 (E) LONG-TERM BIKE STORAGE ROOM TO REMAIN. NOT PART OF SHANE CO LEASABLE AREA. S22 (E) MAIN BUILDING ELECTRICAL ROOM AND MAIN DISTRIBUTION PANEL TO REMAIN. NOT PART OF SHANE CO LEASABLE AREA. S23 (E) ADJACENT STRUCTURES TO REMAIN, TYP. S24 (E) BUILDING ENTRANCE TO REMAIN. S26 (E) PARKING AREA TO REMAIN, TYP. S31 (N) PLANTER AND INTEGRAL BENCH - REQUIRED AS A SECURITY ELEMENT TO PROTECT FRONT ENTRY FROM VEHICLE ENTRY. S33 (N) SUITE ENTRANCE AND ENTRANCE TOWER ELEMENT. ENTRANCE TOWER IS NON-CONDITIONED SPACE AND NOT CONSIDERED AS PART OF THE OVERALL OCCUPIABLE BUILDING AREA. S34 (E) DEMISING WALL TO REMAIN. S35 (N) DECORATIVE SITE BOLLARD W/ INTEGRAL LIGHTING COMPONENT (LIGHTWAVE 2 STRAIGHT BOLLARD, ULW-10874, W/ SECURITY CORE IN FRONT OF ALL FENESTRATION AREAS), TYP. S36 (N) PERMEABLE PAVER HARDSCAPE PATIO w/ MAX. 2% SLOPE IN ANY DIRECTION. MAX BEVEL TRANSITIONS BETWEEN ALL PAVERS TO BE 1/2" OR LESS w/ MAX. 1/4" BEVEL. PAVERS TO MATCH PREVIOUSLY L.L. APPROVED DESIGN. S37 (N) CONCRETE WALKWAY. MAX 2% SLOPE IN ANY DIRECTION w/ 0" TRANSITION BETWEEN (E) CONCRETE WALKWAY/LANDING AND PAVER PATIO. S38 (N) LANDSCAPE AREA. PLANTING TO MATCH (E) AREA PLANTERS. SCALE: 1/16" = 1'-0" SITE PLAN -PROPOSED PLANNING VE SCALE: 1/16" = 1'-0"A-1 2 ELEVATION -EAST (BUILDING BULK SETBACK DIAGRAM) LOT AREA 83,766 SF BUILDING AREA EXISTING BUILDING AREA:28,813 SF LOT COVERAGE:35.1% REQUIRED PARKING *THERE IS NO NEW SF PROPOSED AS PART OF THIS SCOPE OF WORK TOTAL PARKING PROVIDED:114 SPACES SITE STATISTICS / PARKING ANALYSIS NOTE: WITH THE EXCEPTION OF WORK REQUIRED TO PREPARE EXISTING SITE ELEMENTS FOR THE NEW ENTRY TOWER AND PERMEABLE HARDSCAPING PATIO PROPOSED HEREIN AS PART OF THE SCOPE WORK, ALL SITE ELEMENTS ARE EXISTING TO REMAIN AND NOT INCLUDED IN THIS APPLICATION. THE (E) SITE PLAN AND SITE ELEMENTS NOT IDENTIFIED AS (N) WERE PREPARED AND PROVIDED BY L.L. AND SHOWN FOR REFERENCE ONLY. ORIGINAL SITE WORK COMPLETED UNDER PERMIT # BLD-2020-0387. NORTH LIGHTING SCHEDULE PROPOSED SIGN A PROPOSED SIGN B PROPOSED SIGN C (PREVIOUSLY APPROVED) EXC-2022-004 12/14/23 Gian Paolo Martire