BLD-2022-2146InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10404 PARADISE DR Cupertino APN: 359 16 028 PERMIT NO: BLD-2022-2146
OWNER'S NAME: CHANG CHIEN-HSIUNG ET AL OWNER'S PHONE: 408-398-9803
CONTRACTOR: DALCON INC, 757 CHESTNUT ST #A SAN JOSE CONTRACTOR PHONE:
DATE ISSUED 3/1/2024 8:34:44 AM ISSUED BY:VALUATION: $30000
JOB DESCRIPTION
TO CLEAR CODE CASE - BATHROOMS REMODEL (88 SF); KITCHEN REMODEL (80SF); NEW ELECTRICAL SUBPANEL (100AMP); (N) PROPERTY LINE CLEANOUT; (N) TANKLESS WATER
HEATER; REPLACE FURNACE SAME LOCATION; REPLACE MECHANICAL DUCTWORK; REWIRE HOUSE; (N) EV CHARGER; (N) CONDENSER. REVISION #1 - REPLACE SEWER LATERAL -
APPROVED 05/19/2023
INSPECTION TYPE DATE STATUS INSPECTOR
ROUGH ELECTRICAL 2023-06-20 Passed Antonio Torrez
ROUGH FRAME 2023-06-20 Passed Antonio Torrez
ROUGH PLUMBING 2023-06-20 Passed Antonio Torrez
ROUGH MECHANICAL 2023-06-20 Passed Antonio Torrez
PROPERTY LINE CLEANOUT 2023-07-11 Failed Bob Sabich
PROPERTY LINE CLEANOUT 2023-07-13 Failed Rodney Weathers
SANITARY - VISUAL 2023-07-14 Failed cupsanitary
PROPERTY LINE CLEANOUT 2023-09-21 Cancelled James Lee
PROPERTY LINE CLEANOUT 2023-09-26 Passed James Lee
SHEETROCK 2023-09-26 Failed James Lee
SHOWER PAN 2023-10-06 Passed Rodney Weathers
INTERIOR SHEAR 2023-10-06 Passed Rodney Weathers
SANITARY - VISUAL 2023-09-26 Passed cupsanitary
SHEETROCK 2023-10-09 Cancelled
INTERIOR LATH 2023-10-06 Passed Rodney Weathers
SANITARY - VISUAL 2023-10-16 Failed cupsanitary
SANITARY - VISUAL 2024-01-22 Passed cupsanitary
SHEETROCK 2024-01-26 Failed Rodney Weathers
SHEETROCK 2024-02-02 Passed James Lee
FINAL BUILDING 2024-02-23 Failed Rodney Weathers
FINAL ELECTRICAL 2024-02-23 Failed Rodney Weathers
FINAL PLUMBING 2024-02-23 Failed Rodney Weathers
FINAL MECHANICAL 2024-02-23 Failed Rodney Weathers
GAS TEST 2024-03-01 Scheduled Antonio Torrez
FINAL BUILDING 2024-03-01 Passed Antonio Torrez
SANITARY - FINAL 2024-02-28 Passed cupsanitary
FINAL ELECTRICAL 2024-03-01 Passed Antonio Torrez
FINAL MECHANICAL 2024-03-01 Passed Antonio Torrez
FINAL PLUMBING 2024-03-01 Passed Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.