Loading...
BLD-2022-2146InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10404 PARADISE DR Cupertino APN: 359 16 028 PERMIT NO: BLD-2022-2146 OWNER'S NAME: CHANG CHIEN-HSIUNG ET AL OWNER'S PHONE: 408-398-9803 CONTRACTOR: DALCON INC, 757 CHESTNUT ST #A SAN JOSE CONTRACTOR PHONE: DATE ISSUED 3/1/2024 8:34:44 AM ISSUED BY:VALUATION: $30000 JOB DESCRIPTION TO CLEAR CODE CASE - BATHROOMS REMODEL (88 SF); KITCHEN REMODEL (80SF); NEW ELECTRICAL SUBPANEL (100AMP); (N) PROPERTY LINE CLEANOUT; (N) TANKLESS WATER HEATER; REPLACE FURNACE SAME LOCATION; REPLACE MECHANICAL DUCTWORK; REWIRE HOUSE; (N) EV CHARGER; (N) CONDENSER. REVISION #1 - REPLACE SEWER LATERAL - APPROVED 05/19/2023 INSPECTION TYPE DATE STATUS INSPECTOR ROUGH ELECTRICAL 2023-06-20 Passed Antonio Torrez ROUGH FRAME 2023-06-20 Passed Antonio Torrez ROUGH PLUMBING 2023-06-20 Passed Antonio Torrez ROUGH MECHANICAL 2023-06-20 Passed Antonio Torrez PROPERTY LINE CLEANOUT 2023-07-11 Failed Bob Sabich PROPERTY LINE CLEANOUT 2023-07-13 Failed Rodney Weathers SANITARY - VISUAL 2023-07-14 Failed cupsanitary PROPERTY LINE CLEANOUT 2023-09-21 Cancelled James Lee PROPERTY LINE CLEANOUT 2023-09-26 Passed James Lee SHEETROCK 2023-09-26 Failed James Lee SHOWER PAN 2023-10-06 Passed Rodney Weathers INTERIOR SHEAR 2023-10-06 Passed Rodney Weathers SANITARY - VISUAL 2023-09-26 Passed cupsanitary SHEETROCK 2023-10-09 Cancelled   INTERIOR LATH 2023-10-06 Passed Rodney Weathers SANITARY - VISUAL 2023-10-16 Failed cupsanitary SANITARY - VISUAL 2024-01-22 Passed cupsanitary SHEETROCK 2024-01-26 Failed Rodney Weathers SHEETROCK 2024-02-02 Passed James Lee FINAL BUILDING 2024-02-23 Failed Rodney Weathers FINAL ELECTRICAL 2024-02-23 Failed Rodney Weathers FINAL PLUMBING 2024-02-23 Failed Rodney Weathers FINAL MECHANICAL 2024-02-23 Failed Rodney Weathers GAS TEST 2024-03-01 Scheduled Antonio Torrez FINAL BUILDING 2024-03-01 Passed Antonio Torrez SANITARY - FINAL 2024-02-28 Passed cupsanitary FINAL ELECTRICAL 2024-03-01 Passed Antonio Torrez FINAL MECHANICAL 2024-03-01 Passed Antonio Torrez FINAL PLUMBING 2024-03-01 Passed Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.