Loading...
23-041 SO #8 dated 6-17-24 Creekside Park picnic tables concrete pad installation project - PO 2024-504Contract/Purchasing Action Personnel Information Name Brian Gathers Department Public Works  Division Grounds Date 06.06.2024 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Alvernaz Construction Quote - Creekside Picnic Tabel Pads.pdf Service Order Amount $23,600.00 Master Agreement Number 2023-010 Start Date 05/30/2023 End Date 06/30/2025 Firm Name Alvernaz Construction Address PO Box 366 San Martin, CA. 95046 Phone (408) 595-2817 Consultant/Contractor Name Alvernaz Construction Consultant/Contractor Email michaelalvernaz@alvernazconstruction.com Project Name SO 8 Creekside Park picnic tables concrete pad installation project Project Location Creekside Park 10455 Miller Ave. Cupertino, CA. 95014 Cupertino Project Manager Name Brian Gathers Cupertino Project Manager Email briang@cupertino.org Master Agreement Maximum Compensation $175,000.00 Total Previously Encumbered to Date $107,100.00 Encumbrance this Service Order $23,600.00 Master Agreement Unencumbered Balance $44,300.00 SO GL #100-84-814 900-945 Signature       06/17/2024 PDT  Consultant/Contractor Signature Date       06/17/2024 PDT  Manager/Supervisor Signature Date Date: 06/17/2024 PDT Email: michaelalvernaz@alvernazconstruction.com Date: 06/17/2024 PDT Email: briang@cupertino.gov Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       06/17/2024 PDT  Management Analyst Signature DateDate: 06/17/2024 PDT Email: jindyg@cupertino.org Quote June 3 2024 Alvernaz Construction Po Box 366 San Martin CA 95046 Lic# 711435 408-595-2817 To: Brian Gathers Job Name City of Cupertino Creekside Park 10300 Torre Avenue Picnic Tables Concrete slabs 1- Excavate existing soil approximately 4 inches to 5 inches for 7-slabs. 2- Form 6- concrete slabs approximately 10 ft. X 10 ft. 3- Form 1 concrete slab approximately 14 ft. x 10 ft. 4- Install ⅜ rebar in all concrete pads. 5- Pour all concrete pad with six sack pump mix 6- All concrete to have a broom finish. 7-Clean all unnecessary material and soil to stay on site.. Total cost due 100% completed $ 23,600.00 Thank you, Michael Alvernaz SO 8 Creekside Park picnic tables concrete pad installation project - Service Request Created:06/16/2024 Status:Signed Transaction ID:a40a5df7-3d13-4b2b-aa3f-b7fc25b1c8bc "SO 8 Creekside Park picnic tables concrete pad installation project - Service Request" history Jindy Gonzalez created the document. 06/16/2024 7:11:49 PM PDT - IP address 174.85.102.16 Document was emailed to Alvernaz Construction 06/16/2024 7:11:50 PM PDT Alvernaz Construction signed the document. 06/17/2024 3:46:16 AM PDT - IP address 174.87.177.71:49390 Document was emailed to briang@cupertino.gov 06/17/2024 3:46:17 AM PDT briang@cupertino.gov signed the document. 06/17/2024 6:29:23 AM PDT - IP address 64.165.34.3:29627 Document was emailed to Jindy Gonzalez 06/17/2024 6:29:24 AM PDT Jindy Gonzalez signed the document. 06/17/2024 6:41:01 AM PDT - IP address 174.85.102.16:64272 Document was successfully signed and filed 06/17/2024 6:41:02 AM PDT