23-041 SO #8 dated 6-17-24 Creekside Park picnic tables concrete pad installation project - PO 2024-504Contract/Purchasing Action
Personnel Information
Name Brian Gathers Department Public Works
Division Grounds Date 06.06.2024
Service Order
Upload Quote
Quote, Description of
Project, Scope of Service,
Schedule of Performance
and Compensation
Alvernaz Construction Quote - Creekside Picnic Tabel Pads.pdf
Service Order Amount $23,600.00
Master Agreement
Number
2023-010 Start Date 05/30/2023 End Date 06/30/2025
Firm Name Alvernaz
Construction
Address PO Box 366 San Martin, CA. 95046
Phone (408) 595-2817
Consultant/Contractor
Name
Alvernaz
Construction
Consultant/Contractor
Email
michaelalvernaz@alvernazconstruction.com
Project Name SO 8
Creekside
Park picnic
tables
concrete
pad
installation
project
Project Location Creekside Park 10455 Miller Ave. Cupertino,
CA. 95014
Cupertino Project
Manager Name
Brian Gathers Cupertino Project
Manager Email
briang@cupertino.org
Master Agreement
Maximum
Compensation
$175,000.00 Total Previously
Encumbered to Date
$107,100.00
Encumbrance this
Service Order
$23,600.00 Master Agreement
Unencumbered
Balance
$44,300.00
SO GL #100-84-814 900-945
Signature
06/17/2024 PDT
Consultant/Contractor Signature Date
06/17/2024 PDT
Manager/Supervisor Signature Date
Date: 06/17/2024 PDT
Email: michaelalvernaz@alvernazconstruction.com
Date: 06/17/2024 PDT
Email: briang@cupertino.gov
Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above
fund for the above contract as estimated and that fund are available as of this date of signature.
06/17/2024 PDT
Management Analyst Signature DateDate: 06/17/2024 PDT
Email: jindyg@cupertino.org
Quote June 3 2024
Alvernaz Construction
Po Box 366
San Martin CA 95046
Lic# 711435
408-595-2817
To: Brian Gathers Job Name
City of Cupertino Creekside Park
10300 Torre Avenue Picnic Tables Concrete slabs
1- Excavate existing soil approximately 4 inches to 5 inches for 7-slabs.
2- Form 6- concrete slabs approximately 10 ft. X 10 ft.
3- Form 1 concrete slab approximately 14 ft. x 10 ft.
4- Install ⅜ rebar in all concrete pads.
5- Pour all concrete pad with six sack pump mix
6- All concrete to have a broom finish.
7-Clean all unnecessary material and soil to stay on site..
Total cost due 100% completed $ 23,600.00
Thank you,
Michael Alvernaz
SO 8 Creekside Park picnic tables concrete pad
installation project - Service Request
Created:06/16/2024
Status:Signed
Transaction ID:a40a5df7-3d13-4b2b-aa3f-b7fc25b1c8bc
"SO 8 Creekside Park picnic tables concrete pad installation
project - Service Request" history
Jindy Gonzalez created the document.
06/16/2024 7:11:49 PM PDT - IP address 174.85.102.16
Document was emailed to Alvernaz Construction
06/16/2024 7:11:50 PM PDT
Alvernaz Construction signed the document.
06/17/2024 3:46:16 AM PDT - IP address 174.87.177.71:49390
Document was emailed to briang@cupertino.gov
06/17/2024 3:46:17 AM PDT
briang@cupertino.gov signed the document.
06/17/2024 6:29:23 AM PDT - IP address 64.165.34.3:29627
Document was emailed to Jindy Gonzalez
06/17/2024 6:29:24 AM PDT
Jindy Gonzalez signed the document.
06/17/2024 6:41:01 AM PDT - IP address 174.85.102.16:64272
Document was successfully signed and filed
06/17/2024 6:41:02 AM PDT