BLD-2022-0652_Inspection RecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10690 PEBBLE PL Cupertino APN: 326 43 042 PERMIT NO: BLD-2022-0652
OWNER'S NAME: CHEN SHUO-HAO AND LIOU SU-LING OWNER'S PHONE: Not Provided
CONTRACTOR: REAL TIME CONSTRUCTION INC, 3947 PLEASANT HOLLOW LN SAN JOSE CONTRACTOR PHONE: (469) 544-8938
DATE ISSUED 3/12/2024 10:39:05 AM ISSUED BY:VALUATION: $250000
JOB DESCRIPTION
(N) DETACHED ADU (651 SF); PANEL UPGRADE (200 AMP).
INSPECTION TYPE DATE STATUS INSPECTOR
UNDERFLOOR PLUMBING 2023-08-01 Passed Bob Sabich
FOUNDATION 2023-08-04 Passed Antonio Torrez
ROOF NAIL 2023-08-24 Passed Rodney Weathers
EXTERIOR SHEAR 2023-08-24 Failed Rodney Weathers
ROUGH PLUMBING 2023-09-08 Rescheduled
EXTERIOR LATH 2023-09-08 Rescheduled
ROUGH MECHANICAL 2023-09-08 Rescheduled
ROUGH FRAME 2023-09-08 Rescheduled
ROUGH ELECTRICAL 2023-09-08 Rescheduled
INSULATION 2023-09-12 Rescheduled
SHOWER PAN 2023-09-15 Rescheduled
SHEETROCK 2023-09-15 Rescheduled
SHEETROCK 2023-09-22 Cancelled
ROUGH ELECTRICAL 2023-09-15 Cancelled
ROUGH PLUMBING 2023-09-15 Cancelled
ROUGH FRAME 2023-09-15 Cancelled
ROUGH MECHANICAL 2023-09-15 Cancelled
EXTERIOR LATH 2023-09-15 Cancelled
INSULATION 2023-09-19 Cancelled
SHOWER PAN 2023-09-22 Cancelled
EXTERIOR LATH 2023-09-29 Passed Rodney Weathers
ROUGH ELECTRICAL 2023-09-29 Conditional Rodney Weathers
ROUGH PLUMBING 2023-09-29 Failed Rodney Weathers
ROUGH MECHANICAL 2023-09-29 Passed Rodney Weathers
ROUGH FRAME 2023-09-29 Failed Rodney Weathers
SHEETROCK 2023-10-06 Rescheduled
INSULATION 2023-10-03 Rescheduled
EXTERIOR SHEAR 2023-09-29 Passed Rodney Weathers
INSULATION 2023-10-06 Passed Rodney Weathers
SHEETROCK 2023-10-10 Passed Rodney Weathers
SHOWER PAN 2023-10-13 Rescheduled
ROUGH PLUMBING 2023-10-06 Passed Rodney Weathers
ROUGH FRAME 2023-10-06 Passed Rodney Weathers
EXTERIOR LATH 2023-10-06 Passed Rodney Weathers
RE-ROOF - BATTENS 2023-10-10 Passed Rodney Weathers
SHOWER PAN 2023-10-19 Passed Antonio Torrez
UNDERGROUND SEWER 2023-11-13 Passed Antonio Torrez
UNDERGROUND WATER SERVICE 2023-11-13 Failed Antonio Torrez
UNDERGROUND WATER SERVICE 2023-11-21 Passed James Lee
PROPERTY LINE CLEANOUT 2023-11-21 Passed James Lee
SANITARY - VISUAL 2023-11-22 Passed cupsanitary
SANITARY - FINAL 2024-02-14 Passed cupsanitary
FINAL BUILDING 2024-03-12 Passed 4LEAF1 4LEAF1
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.