BLD-2020-1950InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10344 COLBY AVE Cupertino APN: 316 29 037 PERMIT NO: BLD-2020-1950
OWNER'S NAME: YAZGAN MUSTAFA AND HULYA OWNER'S PHONE: 408-839-6429
CONTRACTOR: ATLAS TR INC DBA ATLAS GENERAL CONSTRUCTION, 2450 PERALTA BLVD STE 207 FREMONT CONTRACTOR PHONE: 650-440-2236
DATE ISSUED 3/19/2024 12:18:00 PM ISSUED BY:VALUATION: $150000
JOB DESCRIPTION
(N) REAR ADDITION (703 SF); UNCOVERED REAR PATIO ADDITION (216 SF); REMODEL 2 BATHS (151 SF); REMODEL KITCHEN (200 SF); REMODEL OTHER (1,374 SF); UPGRADE MAIN
ELEC. PANEL (200 AMPS); (N) A/C UNIT; FULLY SPRINKLER BLDG; RE-ROOF COMP SHINGLES (2,500 SF) REV #1 - NO LONGER DOING ROOF EXTENSIONS ; REPLACE WOOD SIDING
WITH STUCCO ON FRONT FACADE AND PARTIAL ON LEFT SIDE OF GARAGE GABLE (400 SF)-APPROVED 10/6/21 REV#2 - ADDING A TANKLESS WATER HEATER OUTSIDE OF THE
GARAGE WALL; ADD EV CHARGER IN EXISTING GARAGE; NEW 200AMP ELECTRICAL MAIN PANEL - APPROVED 08/10/2023 REV #3 - NEW ATTIC ACCESS-APPROVED 3/12/2024
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2021-08-09 Passed James Lee
ROUGH FRAME 2021-08-23 Cancelled James Lee
UNDERFLOOR FRAMING 2021-08-23 Conditional James Lee
UNDERFLOOR PLUMBING 2021-08-27 Conditional James Lee
INSULATION 2021-08-27 Conditional James Lee
INSULATION 2021-09-01 Passed James Lee
ROUGH FRAME 2021-09-30 Cancelled James Lee
ROOF NAIL 2021-09-30 Passed James Lee
INTERIOR SHEAR 2021-09-30 Conditional James Lee
EXTERIOR SHEAR 2021-09-30 Conditional James Lee
INTERIOR SHEAR 2021-10-13 Cancelled Bob Sabich
ROOF NAIL 2021-10-13 Cancelled Bob Sabich
ROUGH FRAME 2021-11-04 Failed Rodney Weathers
ROUGH PLUMBING 2021-11-04 Failed Rodney Weathers
EXTERIOR SHEAR 2021-11-04 Passed Rodney Weathers
INTERIOR SHEAR 2021-11-04 Passed Rodney Weathers
SHOWER PAN 2021-11-04 Passed Rodney Weathers
ROUGH ELECTRICAL 2021-12-01 Passed James Lee
ROUGH FRAME 2021-12-01 Conditional James Lee
ROUGH MECHANICAL 2021-12-01 Passed James Lee
ROUGH PLUMBING 2021-12-01 Passed James Lee
INTERIOR LATH 2021-12-01 Passed James Lee
FIRE DEPT - SPRINKLERS - ROUGH 2021-11-24 Passed Santa Clara County Fire
EXTERIOR LATH 2021-12-01 Conditional James Lee
UNDERGROUND SEWER 2021-12-17 Passed James Lee
INSULATION 2021-12-17 Passed James Lee
SANITARY - VISUAL 2021-12-15 Passed cupsanitary
EXTERIOR LATH 2021-12-17 Passed James Lee
SHEETROCK 2022-01-03 Passed James Lee
INTERIOR LATH 2022-01-03 Passed James Lee
GAS TEST 2022-01-03 Passed James Lee
SCRATCH COAT 2022-02-15 Passed James Lee
SCRATCH COAT 2022-02-15 Passed James Lee
SANITARY - FINAL 2022-04-01 Passed cupsanitary
FIRE DEPT - SPRINKLERS - FINAL 2022-04-07 Passed Santa Clara County Fire
FIRE DEPT - FINAL 2022-04-07 Passed Santa Clara County Fire
FINAL PLUMBING 2023-01-31 Rescheduled Bob Sabich
FINAL ELECTRICAL 2023-01-31 Rescheduled Bob Sabich
FINAL MECHANICAL 2023-01-31 Rescheduled Bob Sabich
FINAL BUILDING 2023-01-31 Rescheduled Bob Sabich
FINAL PLUMBING 2023-02-07 Rescheduled
FINAL MECHANICAL 2023-02-07 Rescheduled
FINAL ELECTRICAL 2023-02-07 Rescheduled
FINAL BUILDING 2023-02-07 Rescheduled
FINAL MECHANICAL 2023-02-15 Rescheduled
FINAL ELECTRICAL 2023-02-15 Rescheduled
FINAL BUILDING 2023-02-15 Rescheduled
FINAL PLUMBING 2023-02-15 Rescheduled
GAS METER RELEASE 2023-02-13 Cancelled
FINAL PLUMBING 2023-02-17 Rescheduled
ELECTRIC METER RELEASE 2023-02-17 Rescheduled
ELECTRIC METER RELEASE 2023-02-15 Passed James Lee
FINAL BUILDING 2023-02-17 Rescheduled
FINAL ELECTRICAL 2023-02-17 Rescheduled
FINAL MECHANICAL 2023-02-17 Rescheduled
ELECTRIC METER RELEASE 2023-02-13 Rescheduled
ELECTRIC METER RELEASE 2023-02-15 Rescheduled
FINAL MECHANICAL 2023-02-21 Rescheduled
FINAL ELECTRICAL 2023-02-21 Rescheduled
FINAL PLUMBING 2023-02-21 Rescheduled
FINAL BUILDING 2023-02-21 Rescheduled
FINAL MECHANICAL 2023-04-03 Rescheduled
FINAL PLUMBING 2023-04-03 Rescheduled
FINAL ELECTRICAL 2023-04-03 Rescheduled
FINAL BUILDING 2023-04-03 Rescheduled
FINAL BUILDING 2023-03-27 Rescheduled
FINAL ELECTRICAL 2023-03-27 Rescheduled
FINAL PLUMBING 2023-03-27 Rescheduled
FINAL MECHANICAL 2023-03-27 Rescheduled
FINAL MECHANICAL 2023-05-11 Rescheduled
FINAL BUILDING 2023-05-11 Rescheduled
FINAL ELECTRICAL 2023-05-11 Rescheduled
FINAL PLUMBING 2023-05-11 Rescheduled
FINAL MECHANICAL 2023-06-02 Rescheduled
FINAL BUILDING 2023-06-02 Rescheduled
FINAL ELECTRICAL 2023-06-02 Rescheduled
FINAL PLUMBING 2023-06-02 Rescheduled
FINAL PLUMBING 2023-06-12 Rescheduled
FINAL ELECTRICAL 2023-06-12 Rescheduled
FINAL MECHANICAL 2023-06-12 Rescheduled
FINAL BUILDING 2023-06-12 Rescheduled
FINAL BUILDING 2023-06-08 Rescheduled
FINAL MECHANICAL 2023-06-08 Rescheduled
FINAL ELECTRICAL 2023-06-08 Rescheduled
FINAL PLUMBING 2023-06-08 Rescheduled
FINAL PLUMBING 2023-06-08 Failed James Lee
FINAL ELECTRICAL 2023-06-08 Failed James Lee
FINAL MECHANICAL 2023-06-08 Failed James Lee
FINAL BUILDING 2023-06-08 Failed James Lee
FINAL BUILDING 2023-08-10 Failed Rodney Weathers
FINAL ELECTRICAL 2023-08-10 Failed Rodney Weathers
FINAL PLUMBING 2023-08-10 Failed Rodney Weathers
FINAL MECHANICAL 2023-08-10 Failed Rodney Weathers
FINAL BUILDING 2023-09-07 Cancelled
FINAL ELECTRICAL 2023-09-07 Cancelled
FINAL PLUMBING 2023-09-07 Cancelled
FINAL BUILDING 2023-09-11 Failed James Lee
FINAL ELECTRICAL 2023-09-11 Passed James Lee
FINAL PLUMBING 2023-09-11 Passed James Lee
FINAL MECHANICAL 2023-09-11 Cancelled
FINAL BUILDING 2024-01-19 Failed James Lee
FINAL ELECTRICAL 2024-03-19 Cancelled
FINAL BUILDING 2024-03-19 Passed James Lee
FINAL MECHANICAL 2024-03-19 Cancelled
FINAL PLUMBING 2024-03-19 Cancelled
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.