Loading...
BLD-2020-1950InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10344 COLBY AVE Cupertino APN: 316 29 037 PERMIT NO: BLD-2020-1950 OWNER'S NAME: YAZGAN MUSTAFA AND HULYA OWNER'S PHONE: 408-839-6429 CONTRACTOR: ATLAS TR INC DBA ATLAS GENERAL CONSTRUCTION, 2450 PERALTA BLVD STE 207 FREMONT CONTRACTOR PHONE: 650-440-2236 DATE ISSUED 3/19/2024 12:18:00 PM ISSUED BY:VALUATION: $150000 JOB DESCRIPTION (N) REAR ADDITION (703 SF); UNCOVERED REAR PATIO ADDITION (216 SF); REMODEL 2 BATHS (151 SF); REMODEL KITCHEN (200 SF); REMODEL OTHER (1,374 SF); UPGRADE MAIN ELEC. PANEL (200 AMPS); (N) A/C UNIT; FULLY SPRINKLER BLDG; RE-ROOF COMP SHINGLES (2,500 SF) REV #1 - NO LONGER DOING ROOF EXTENSIONS ; REPLACE WOOD SIDING WITH STUCCO ON FRONT FACADE AND PARTIAL ON LEFT SIDE OF GARAGE GABLE (400 SF)-APPROVED 10/6/21 REV#2 - ADDING A TANKLESS WATER HEATER OUTSIDE OF THE GARAGE WALL; ADD EV CHARGER IN EXISTING GARAGE; NEW 200AMP ELECTRICAL MAIN PANEL - APPROVED 08/10/2023 REV #3 - NEW ATTIC ACCESS-APPROVED 3/12/2024 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2021-08-09 Passed James Lee ROUGH FRAME 2021-08-23 Cancelled James Lee UNDERFLOOR FRAMING 2021-08-23 Conditional James Lee UNDERFLOOR PLUMBING 2021-08-27 Conditional James Lee INSULATION 2021-08-27 Conditional James Lee INSULATION 2021-09-01 Passed James Lee ROUGH FRAME 2021-09-30 Cancelled James Lee ROOF NAIL 2021-09-30 Passed James Lee INTERIOR SHEAR 2021-09-30 Conditional James Lee EXTERIOR SHEAR 2021-09-30 Conditional James Lee INTERIOR SHEAR 2021-10-13 Cancelled Bob Sabich ROOF NAIL 2021-10-13 Cancelled Bob Sabich ROUGH FRAME 2021-11-04 Failed Rodney Weathers ROUGH PLUMBING 2021-11-04 Failed Rodney Weathers EXTERIOR SHEAR 2021-11-04 Passed Rodney Weathers INTERIOR SHEAR 2021-11-04 Passed Rodney Weathers SHOWER PAN 2021-11-04 Passed Rodney Weathers ROUGH ELECTRICAL 2021-12-01 Passed James Lee ROUGH FRAME 2021-12-01 Conditional James Lee ROUGH MECHANICAL 2021-12-01 Passed James Lee ROUGH PLUMBING 2021-12-01 Passed James Lee INTERIOR LATH 2021-12-01 Passed James Lee FIRE DEPT - SPRINKLERS - ROUGH 2021-11-24 Passed Santa Clara County Fire EXTERIOR LATH 2021-12-01 Conditional James Lee UNDERGROUND SEWER 2021-12-17 Passed James Lee INSULATION 2021-12-17 Passed James Lee SANITARY - VISUAL 2021-12-15 Passed cupsanitary EXTERIOR LATH 2021-12-17 Passed James Lee SHEETROCK 2022-01-03 Passed James Lee INTERIOR LATH 2022-01-03 Passed James Lee GAS TEST 2022-01-03 Passed James Lee SCRATCH COAT 2022-02-15 Passed James Lee SCRATCH COAT 2022-02-15 Passed James Lee SANITARY - FINAL 2022-04-01 Passed cupsanitary FIRE DEPT - SPRINKLERS - FINAL 2022-04-07 Passed Santa Clara County Fire FIRE DEPT - FINAL 2022-04-07 Passed Santa Clara County Fire FINAL PLUMBING 2023-01-31 Rescheduled Bob Sabich FINAL ELECTRICAL 2023-01-31 Rescheduled Bob Sabich FINAL MECHANICAL 2023-01-31 Rescheduled Bob Sabich FINAL BUILDING 2023-01-31 Rescheduled Bob Sabich FINAL PLUMBING 2023-02-07 Rescheduled   FINAL MECHANICAL 2023-02-07 Rescheduled   FINAL ELECTRICAL 2023-02-07 Rescheduled   FINAL BUILDING 2023-02-07 Rescheduled   FINAL MECHANICAL 2023-02-15 Rescheduled   FINAL ELECTRICAL 2023-02-15 Rescheduled   FINAL BUILDING 2023-02-15 Rescheduled   FINAL PLUMBING 2023-02-15 Rescheduled   GAS METER RELEASE 2023-02-13 Cancelled   FINAL PLUMBING 2023-02-17 Rescheduled   ELECTRIC METER RELEASE 2023-02-17 Rescheduled   ELECTRIC METER RELEASE 2023-02-15 Passed James Lee FINAL BUILDING 2023-02-17 Rescheduled   FINAL ELECTRICAL 2023-02-17 Rescheduled   FINAL MECHANICAL 2023-02-17 Rescheduled   ELECTRIC METER RELEASE 2023-02-13 Rescheduled   ELECTRIC METER RELEASE 2023-02-15 Rescheduled   FINAL MECHANICAL 2023-02-21 Rescheduled   FINAL ELECTRICAL 2023-02-21 Rescheduled   FINAL PLUMBING 2023-02-21 Rescheduled   FINAL BUILDING 2023-02-21 Rescheduled   FINAL MECHANICAL 2023-04-03 Rescheduled   FINAL PLUMBING 2023-04-03 Rescheduled   FINAL ELECTRICAL 2023-04-03 Rescheduled   FINAL BUILDING 2023-04-03 Rescheduled   FINAL BUILDING 2023-03-27 Rescheduled   FINAL ELECTRICAL 2023-03-27 Rescheduled   FINAL PLUMBING 2023-03-27 Rescheduled   FINAL MECHANICAL 2023-03-27 Rescheduled   FINAL MECHANICAL 2023-05-11 Rescheduled   FINAL BUILDING 2023-05-11 Rescheduled   FINAL ELECTRICAL 2023-05-11 Rescheduled   FINAL PLUMBING 2023-05-11 Rescheduled   FINAL MECHANICAL 2023-06-02 Rescheduled   FINAL BUILDING 2023-06-02 Rescheduled   FINAL ELECTRICAL 2023-06-02 Rescheduled   FINAL PLUMBING 2023-06-02 Rescheduled   FINAL PLUMBING 2023-06-12 Rescheduled   FINAL ELECTRICAL 2023-06-12 Rescheduled   FINAL MECHANICAL 2023-06-12 Rescheduled   FINAL BUILDING 2023-06-12 Rescheduled   FINAL BUILDING 2023-06-08 Rescheduled   FINAL MECHANICAL 2023-06-08 Rescheduled   FINAL ELECTRICAL 2023-06-08 Rescheduled   FINAL PLUMBING 2023-06-08 Rescheduled   FINAL PLUMBING 2023-06-08 Failed James Lee FINAL ELECTRICAL 2023-06-08 Failed James Lee FINAL MECHANICAL 2023-06-08 Failed James Lee FINAL BUILDING 2023-06-08 Failed James Lee FINAL BUILDING 2023-08-10 Failed Rodney Weathers FINAL ELECTRICAL 2023-08-10 Failed Rodney Weathers FINAL PLUMBING 2023-08-10 Failed Rodney Weathers FINAL MECHANICAL 2023-08-10 Failed Rodney Weathers FINAL BUILDING 2023-09-07 Cancelled   FINAL ELECTRICAL 2023-09-07 Cancelled   FINAL PLUMBING 2023-09-07 Cancelled   FINAL BUILDING 2023-09-11 Failed James Lee FINAL ELECTRICAL 2023-09-11 Passed James Lee FINAL PLUMBING 2023-09-11 Passed James Lee FINAL MECHANICAL 2023-09-11 Cancelled   FINAL BUILDING 2024-01-19 Failed James Lee FINAL ELECTRICAL 2024-03-19 Cancelled   FINAL BUILDING 2024-03-19 Passed James Lee FINAL MECHANICAL 2024-03-19 Cancelled   FINAL PLUMBING 2024-03-19 Cancelled   EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.