Loading...
BLD-2023-1117InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10614 LONNA LN Cupertino APN: 359 19 013 PERMIT NO: BLD-2023-1117 OWNER'S NAME: WU TONY HSUYUNG OWNER'S PHONE: 408-799-3673 CONTRACTOR: S C L CONSTRUCTION COMPANY, 605 NORTH BAYVIEW AVE SUNNYVALE CONTRACTOR PHONE: 408-497-1556 DATE ISSUED 3/21/2024 8:36:51 AM ISSUED BY:VALUATION: $300000 JOB DESCRIPTION REAR ADDITION FOR NEW FAMILY ROOM (484 SF); MASTER BATH REMODEL (120 SF); MASTER BEDROOM REMODEL (240 SF); CONVERT EXISTING FAMILY ROOM INTO JAPANESE ROOM (157 SF) & (N) LAUNDRY AREA (76 SF); CONVERT EXISTING DINING ROOM INTO OFFICE (195 SF); CONVERT EXISTING BEDROOM #3 TO WALK-IN CLOSET (146 SF); REMODEL BEDROOM #2 (200 SF); CONVERT EXISTING LAUNDRY ROOM INTO UTILITY CLOSET (37 SF); (11) (N) TUNNEL SKYLIGHTS INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2023-08-31 Passed Antonio Torrez FOUNDATION 2023-09-01 Cancelled James Lee UNDERFLOOR FRAMING 2023-09-13 Passed Rodney Weathers INSULATION 2023-09-14 Conditional Rodney Weathers UNDERFLOOR PLUMBING 2023-09-13 Conditional Rodney Weathers EXTERIOR SHEAR 2023-09-27 Passed James Lee INTERIOR SHEAR 2023-09-27 Failed James Lee ROOF NAIL 2023-09-27 Passed James Lee SHOWER PAN 2023-09-28 Cancelled   EXTERIOR LATH 2023-10-19 Passed Antonio Torrez INTERIOR SHEAR 2023-10-19 Passed Antonio Torrez ROUGH ELECTRICAL 2023-10-19 Passed Antonio Torrez ROUGH FRAME 2023-10-19 Passed Antonio Torrez ROUGH MECHANICAL 2023-10-19 Passed Antonio Torrez ROUGH PLUMBING 2023-10-19 Passed Antonio Torrez SHOWER PAN 2023-10-19 Passed Antonio Torrez INSULATION 2023-10-24 Cancelled Antonio Torrez EXTERIOR LATH 2023-10-19 Passed Antonio Torrez FOUNDATION 2023-10-19 Passed Antonio Torrez INSULATION 2023-10-19 Passed Antonio Torrez SHEETROCK 2023-11-01 Passed Rodney Weathers SCRATCH COAT 2023-10-27 Passed Rodney Weathers PROPERTY LINE CLEANOUT 2023-10-27 Passed Rodney Weathers SANITARY - VISUAL 2023-10-24 Passed cupsanitary FINAL BUILDING 2024-03-21 Passed Antonio Torrez FINAL MECHANICAL 2024-03-21 Scheduled Antonio Torrez FINAL PLUMBING 2024-03-21 Scheduled Antonio Torrez FINAL ELECTRICAL 2024-03-21 Scheduled Antonio Torrez EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.