BLD-2023-1117InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10614 LONNA LN Cupertino APN: 359 19 013 PERMIT NO: BLD-2023-1117
OWNER'S NAME: WU TONY HSUYUNG OWNER'S PHONE: 408-799-3673
CONTRACTOR: S C L CONSTRUCTION COMPANY, 605 NORTH BAYVIEW AVE SUNNYVALE CONTRACTOR PHONE: 408-497-1556
DATE ISSUED 3/21/2024 8:36:51 AM ISSUED BY:VALUATION: $300000
JOB DESCRIPTION
REAR ADDITION FOR NEW FAMILY ROOM (484 SF); MASTER BATH REMODEL (120 SF); MASTER BEDROOM REMODEL (240 SF); CONVERT EXISTING FAMILY ROOM INTO JAPANESE
ROOM (157 SF) & (N) LAUNDRY AREA (76 SF); CONVERT EXISTING DINING ROOM INTO OFFICE (195 SF); CONVERT EXISTING BEDROOM #3 TO WALK-IN CLOSET (146 SF); REMODEL
BEDROOM #2 (200 SF); CONVERT EXISTING LAUNDRY ROOM INTO UTILITY CLOSET (37 SF); (11) (N) TUNNEL SKYLIGHTS
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2023-08-31 Passed Antonio Torrez
FOUNDATION 2023-09-01 Cancelled James Lee
UNDERFLOOR FRAMING 2023-09-13 Passed Rodney Weathers
INSULATION 2023-09-14 Conditional Rodney Weathers
UNDERFLOOR PLUMBING 2023-09-13 Conditional Rodney Weathers
EXTERIOR SHEAR 2023-09-27 Passed James Lee
INTERIOR SHEAR 2023-09-27 Failed James Lee
ROOF NAIL 2023-09-27 Passed James Lee
SHOWER PAN 2023-09-28 Cancelled
EXTERIOR LATH 2023-10-19 Passed Antonio Torrez
INTERIOR SHEAR 2023-10-19 Passed Antonio Torrez
ROUGH ELECTRICAL 2023-10-19 Passed Antonio Torrez
ROUGH FRAME 2023-10-19 Passed Antonio Torrez
ROUGH MECHANICAL 2023-10-19 Passed Antonio Torrez
ROUGH PLUMBING 2023-10-19 Passed Antonio Torrez
SHOWER PAN 2023-10-19 Passed Antonio Torrez
INSULATION 2023-10-24 Cancelled Antonio Torrez
EXTERIOR LATH 2023-10-19 Passed Antonio Torrez
FOUNDATION 2023-10-19 Passed Antonio Torrez
INSULATION 2023-10-19 Passed Antonio Torrez
SHEETROCK 2023-11-01 Passed Rodney Weathers
SCRATCH COAT 2023-10-27 Passed Rodney Weathers
PROPERTY LINE CLEANOUT 2023-10-27 Passed Rodney Weathers
SANITARY - VISUAL 2023-10-24 Passed cupsanitary
FINAL BUILDING 2024-03-21 Passed Antonio Torrez
FINAL MECHANICAL 2024-03-21 Scheduled Antonio Torrez
FINAL PLUMBING 2024-03-21 Scheduled Antonio Torrez
FINAL ELECTRICAL 2024-03-21 Scheduled Antonio Torrez
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.