BLD-2022-1676InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 10411 TULA LN Cupertino APN: 359 13 119 PERMIT NO: BLD-2022-1676
OWNER'S NAME: CHANG GEORGE AND MIRANDA J OWNER'S PHONE: Not Provided
CONTRACTOR: HAN'S BUILDER CONSTRUCTION, 647 LANFAIR CT SAN JOSE CONTRACTOR PHONE:
DATE ISSUED 3/22/2024 3:26:51 PM ISSUED BY:VALUATION: $500000
JOB DESCRIPTION
KITCHEN REMODEL (201 SF); REMODEL BATHROOMS (257 SF); OTHER REMODEL (1260 SF); REPLACE (23) EXTERIOR WINDOWS AND (3) DOORS; (N) HVAC SYSTEM; (N) TANKLESS
WATER HEATER ON EXTERIOR WALL; (N) SUBPANEL IN LAUNDRY (200 AMP). REV#1 - REVISE STAIR GUARDRAIL DESIGN; (N) EV CHARGER IN GARAGE. - APPROVED 1/25/2024
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2023-02-02 Cancelled Rodney Weathers
PIERS 2023-02-02 Failed Rodney Weathers
UNDERFLOOR FRAMING 2023-02-13 Passed Bob Sabich
EXTERIOR LATH 2023-02-21 Failed Bob Sabich
EXTERIOR LATH 2023-03-08 Passed Bob Sabich
ROUGH PLUMBING 2023-03-20 Passed Rodney Weathers
SCRATCH COAT 2023-03-20 Passed Rodney Weathers
ROUGH ELECTRICAL 2023-03-20 Passed Rodney Weathers
ROUGH MECHANICAL 2023-03-20 Passed Rodney Weathers
ROUGH FRAME 2023-03-20 Failed Rodney Weathers
SHOWER PAN 2023-04-20 Rescheduled
INTERIOR LATH 2023-04-20 Rescheduled
INTERIOR LATH 2023-04-21 Conditional James Lee
SHOWER PAN 2023-04-21 Failed James Lee
INSULATION 2023-04-21 Passed James Lee
ROUGH FRAME 2023-04-21 Passed James Lee
SHEETROCK 2023-04-27 Failed Rodney Weathers
GAS TEST 2023-04-27 Passed Rodney Weathers
SHOWER PAN 2023-04-27 Passed Rodney Weathers
INTERIOR LATH 2023-04-27 Passed Rodney Weathers
SHEETROCK 2023-05-19 Rescheduled
SHEETROCK 2023-05-22 Passed Bob Sabich
FINAL BUILDING 2023-07-19 Failed Rodney Weathers
FINAL BUILDING 2024-01-30 Cancelled Antonio Torrez
SANITARY - FINAL 2024-01-31 Failed cupsanitary
SANITARY - VISUAL 2024-03-01 Passed cupsanitary
FINAL BUILDING 2024-03-08 Failed James Lee
SANITARY - FINAL 2024-03-06 Passed cupsanitary
FINAL BUILDING 2024-03-22 Passed James Lee
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.