Loading...
BLD-2022-1676InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 10411 TULA LN Cupertino APN: 359 13 119 PERMIT NO: BLD-2022-1676 OWNER'S NAME: CHANG GEORGE AND MIRANDA J OWNER'S PHONE: Not Provided CONTRACTOR: HAN'S BUILDER CONSTRUCTION, 647 LANFAIR CT SAN JOSE CONTRACTOR PHONE: DATE ISSUED 3/22/2024 3:26:51 PM ISSUED BY:VALUATION: $500000 JOB DESCRIPTION KITCHEN REMODEL (201 SF); REMODEL BATHROOMS (257 SF); OTHER REMODEL (1260 SF); REPLACE (23) EXTERIOR WINDOWS AND (3) DOORS; (N) HVAC SYSTEM; (N) TANKLESS WATER HEATER ON EXTERIOR WALL; (N) SUBPANEL IN LAUNDRY (200 AMP). REV#1 - REVISE STAIR GUARDRAIL DESIGN; (N) EV CHARGER IN GARAGE. - APPROVED 1/25/2024 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2023-02-02 Cancelled Rodney Weathers PIERS 2023-02-02 Failed Rodney Weathers UNDERFLOOR FRAMING 2023-02-13 Passed Bob Sabich EXTERIOR LATH 2023-02-21 Failed Bob Sabich EXTERIOR LATH 2023-03-08 Passed Bob Sabich ROUGH PLUMBING 2023-03-20 Passed Rodney Weathers SCRATCH COAT 2023-03-20 Passed Rodney Weathers ROUGH ELECTRICAL 2023-03-20 Passed Rodney Weathers ROUGH MECHANICAL 2023-03-20 Passed Rodney Weathers ROUGH FRAME 2023-03-20 Failed Rodney Weathers SHOWER PAN 2023-04-20 Rescheduled   INTERIOR LATH 2023-04-20 Rescheduled   INTERIOR LATH 2023-04-21 Conditional James Lee SHOWER PAN 2023-04-21 Failed James Lee INSULATION 2023-04-21 Passed James Lee ROUGH FRAME 2023-04-21 Passed James Lee SHEETROCK 2023-04-27 Failed Rodney Weathers GAS TEST 2023-04-27 Passed Rodney Weathers SHOWER PAN 2023-04-27 Passed Rodney Weathers INTERIOR LATH 2023-04-27 Passed Rodney Weathers SHEETROCK 2023-05-19 Rescheduled   SHEETROCK 2023-05-22 Passed Bob Sabich FINAL BUILDING 2023-07-19 Failed Rodney Weathers FINAL BUILDING 2024-01-30 Cancelled Antonio Torrez SANITARY - FINAL 2024-01-31 Failed cupsanitary SANITARY - VISUAL 2024-03-01 Passed cupsanitary FINAL BUILDING 2024-03-08 Failed James Lee SANITARY - FINAL 2024-03-06 Passed cupsanitary FINAL BUILDING 2024-03-22 Passed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.