BLD-2024-1048_JobCard (2).pdfCITY OF CUPERTINO - BUILDING DIVISION
10300 TORRE AVENUE • CUPERTINO, CA 95014-3255
PHONE 408-777-3228 • WWW.CUPERTINO.ORG/ACCELA
JOB CARD
THIS CARD MUST BE POSTED AT A LOCATION VISIBLE FROM THE STREET FRONTAGE ON SITE OF THE STRUCTURE
BEING PERMITTED AND IS NOT TO BE REMOVED UNTIL BUILDING FINAL.
A HARD -COPY OF THE APPROVED PLANS AND DOCUMENTS SHALL BE KEPT AT THE SITE OF WORK.
Permit No: BLD-2024-1048
Building Address: 7984 FOLKESTONE DR Cupertino
Job Description:
Issued Date: 05/20/2024
Contractor: INFINIUM SOLAR, INC.
INSTALL (1) NEW FRANKLIN APOWERX ENERGY STORAGE SYSTEM (13.6KWH); (1) FRANKLIN AGATEX POWER HUB (200A);
NEW BACKUP LOADS PANEL (125A); NEW NEMA 14-50 EV CHARGER OUTLET IN GARAGE
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE
WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.
*PLEASE REFER TO QR CODE FOR ANY REVISIONS OR UPDATED INFORMATION