Loading...
BLD-2022-1878InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 19710 WHEATON DR Cupertino APN: 316 28 006 PERMIT NO: BLD-2022-1878 OWNER'S NAME: HENG LIU AND LIN SHEN OWNER'S PHONE: Not Provided CONTRACTOR: HU CONSTRUCTION, 2509 ASCOT WAY UNION CITY CONTRACTOR PHONE: 774-641-5340 DATE ISSUED 4/30/2024 2:24:52 PM ISSUED BY:VALUATION: $150000 JOB DESCRIPTION ADDITION 1ST FL (282 SF) FOR (N) KITCHEN; CONVERT (E) LIVING RM TO (N) BEDROOM AND (N) BATHROOM/CONVERT (E) BEDROOM #1 AND CLOSETS TO (N) DINING ROOM (934 SF); REMOVE (E) FIREPLACES (2); MAIN PANEL UPGRADE (200AMP); (N) AC UNIT;RELOACATE AND RELOCATE FURNACE; (5) NEW SKYLIGHTS REV#1 - CHANGE ROOF RIDGE HEIGHT AND ROOF SLOPE AT ADDITION AREA; EXTERIOR WALL MODIFICATION PERCENTAGE CALCULATIONS; CLARIFY MASTER BEDROOM WINDOWS - APPROVED 4/26/23 REV# 2 - PER INPECTIONS UPDATE ATTIC AND UNDERFLOOR ACCESS; INSTALL EV CHARGER 0 (50AMP); REMODEL MASTER BATHROOM AND BATHROOM # 1; RELOCATE THE FURNACE INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2023-02-28 Cancelled   FOUNDATION 2023-02-23 Rescheduled   FOUNDATION 2023-02-28 Rescheduled   FOUNDATION 2023-03-01 Failed Rodney Weathers FOUNDATION 2023-03-02 Passed James Lee ROUGH PLUMBING 2023-03-13 Rescheduled   ROUGH PLUMBING 2023-03-14 Cancelled James Lee UNDERFLOOR FRAMING 2023-03-14 Failed James Lee UNDERFLOOR PLUMBING 2023-03-14 Failed James Lee EXTERIOR SHEAR 2023-03-24 Rescheduled   EXTERIOR SHEAR 2023-03-27 Failed James Lee UNDERFLOOR FRAMING 2023-03-27 Passed James Lee FOUNDATION 2023-05-03 Rescheduled   FOUNDATION 2023-05-05 Cancelled James Lee EXTERIOR SHEAR 2023-05-05 Passed James Lee ROOF NAIL 2023-05-05 Failed James Lee SERVICE UPGRADE 2023-05-05 Passed James Lee ROOF NAIL 2023-05-16 Failed James Lee ROUGH FRAME 2023-05-16 Failed James Lee FURNACE 2023-06-01 Cancelled James Lee ROOF NAIL 2023-06-01 Passed James Lee INSULATION 2023-06-01 Failed James Lee ROUGH FRAME 2023-06-01 Passed James Lee EXTERIOR LATH 2023-06-01 Failed James Lee INTERIOR SHEAR 2023-06-14 Failed James Lee INSULATION 2023-06-14 Passed James Lee INTERIOR SHEAR 2023-06-16 Failed Rodney Weathers SCRATCH COAT 2023-06-14 Failed James Lee SHEETROCK 2023-06-16 Failed Rodney Weathers ROUGH ELECTRICAL 2023-06-16 Failed Rodney Weathers INSULATION 2023-06-16 Failed Rodney Weathers SANITARY - VISUAL 2023-06-23 Passed cupsanitary INTERIOR SHEAR 2023-06-30 Passed Rodney Weathers ROUGH ELECTRICAL 2023-07-06 Passed James Lee ROUGH ELECTRICAL 2023-06-30 Failed Rodney Weathers UNDERFLOOR PLUMBING 2023-06-30 Failed Rodney Weathers UNDERGROUND SEWER 2023-06-30 Failed Rodney Weathers PROPERTY LINE CLEANOUT 2023-06-30 Failed Rodney Weathers UNDERFLOOR ELECTRICAL 2023-06-30 Passed Rodney Weathers SHEETROCK 2023-06-30 Passed Rodney Weathers INSULATION 2023-06-30 Failed Rodney Weathers ROUGH PLUMBING 2023-06-30 Failed Rodney Weathers SCRATCH COAT 2023-06-30 Passed Rodney Weathers ROOF NAIL 2023-07-10 Cancelled   UNDERGROUND SEWER 2023-07-11 Cancelled Rodney Weathers PROPERTY LINE CLEANOUT 2023-07-06 Passed James Lee UNDERGROUND SEWER 2023-07-06 Passed James Lee UNDERFLOOR PLUMBING 2023-07-11 Passed Rodney Weathers FINAL ELECTRICAL 2024-01-10 Rescheduled   FINAL MECHANICAL 2024-01-10 Rescheduled   FINAL PLUMBING 2024-01-10 Rescheduled   SANITARY - FINAL 2024-01-03 Passed cupsanitary FINAL BUILDING 2024-01-10 Rescheduled   FINAL ELECTRICAL 2024-01-11 Cancelled James Lee FINAL BUILDING 2024-01-11 Cancelled James Lee FINAL MECHANICAL 2024-01-11 Cancelled James Lee FINAL PLUMBING 2024-01-11 Cancelled James Lee FINAL BUILDING 2024-01-17 Cancelled James Lee FINAL ELECTRICAL 2024-01-17 Cancelled James Lee FINAL MECHANICAL 2024-01-17 Cancelled James Lee FINAL PLUMBING 2024-01-17 Cancelled James Lee FINAL BUILDING 2024-03-26 Failed James Lee FINAL ELECTRICAL 2024-03-19 Rescheduled James Lee FINAL MECHANICAL 2024-03-26 Failed James Lee FINAL PLUMBING 2024-03-26 Failed James Lee FINAL ELECTRICAL 2024-03-26 Failed James Lee FINAL BUILDING 2024-04-02 Failed James Lee FURNACE 2024-04-11 Rescheduled   FURNACE 2024-04-04 Failed Danielle Carriedo FINAL BUILDING 2024-04-30 Passed James Lee FINAL ELECTRICAL 2024-04-30 Passed James Lee FINAL MECHANICAL 2024-04-30 Passed James Lee FINAL PLUMBING 2024-04-30 Passed James Lee EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.