BLD-2022-1878InspectionRecordINSPECTION RECORD
CITY HALL
10300 Torre Avenue • Cupertino, CA 95014-3255
PHONE 408-777-3228
WWW.CUPERTINO.ORG
BUILDING ADDRESS: 19710 WHEATON DR Cupertino APN: 316 28 006 PERMIT NO: BLD-2022-1878
OWNER'S NAME: HENG LIU AND LIN SHEN OWNER'S PHONE: Not Provided
CONTRACTOR: HU CONSTRUCTION, 2509 ASCOT WAY UNION CITY CONTRACTOR PHONE: 774-641-5340
DATE ISSUED 4/30/2024 2:24:52 PM ISSUED BY:VALUATION: $150000
JOB DESCRIPTION
ADDITION 1ST FL (282 SF) FOR (N) KITCHEN; CONVERT (E) LIVING RM TO (N) BEDROOM AND (N) BATHROOM/CONVERT (E) BEDROOM #1 AND CLOSETS TO (N) DINING ROOM (934
SF); REMOVE (E) FIREPLACES (2); MAIN PANEL UPGRADE (200AMP); (N) AC UNIT;RELOACATE AND RELOCATE FURNACE; (5) NEW SKYLIGHTS REV#1 - CHANGE ROOF RIDGE HEIGHT
AND ROOF SLOPE AT ADDITION AREA; EXTERIOR WALL MODIFICATION PERCENTAGE CALCULATIONS; CLARIFY MASTER BEDROOM WINDOWS - APPROVED 4/26/23 REV# 2 - PER
INPECTIONS UPDATE ATTIC AND UNDERFLOOR ACCESS; INSTALL EV CHARGER 0 (50AMP); REMODEL MASTER BATHROOM AND BATHROOM # 1; RELOCATE THE FURNACE
INSPECTION TYPE DATE STATUS INSPECTOR
FOUNDATION 2023-02-28 Cancelled
FOUNDATION 2023-02-23 Rescheduled
FOUNDATION 2023-02-28 Rescheduled
FOUNDATION 2023-03-01 Failed Rodney Weathers
FOUNDATION 2023-03-02 Passed James Lee
ROUGH PLUMBING 2023-03-13 Rescheduled
ROUGH PLUMBING 2023-03-14 Cancelled James Lee
UNDERFLOOR FRAMING 2023-03-14 Failed James Lee
UNDERFLOOR PLUMBING 2023-03-14 Failed James Lee
EXTERIOR SHEAR 2023-03-24 Rescheduled
EXTERIOR SHEAR 2023-03-27 Failed James Lee
UNDERFLOOR FRAMING 2023-03-27 Passed James Lee
FOUNDATION 2023-05-03 Rescheduled
FOUNDATION 2023-05-05 Cancelled James Lee
EXTERIOR SHEAR 2023-05-05 Passed James Lee
ROOF NAIL 2023-05-05 Failed James Lee
SERVICE UPGRADE 2023-05-05 Passed James Lee
ROOF NAIL 2023-05-16 Failed James Lee
ROUGH FRAME 2023-05-16 Failed James Lee
FURNACE 2023-06-01 Cancelled James Lee
ROOF NAIL 2023-06-01 Passed James Lee
INSULATION 2023-06-01 Failed James Lee
ROUGH FRAME 2023-06-01 Passed James Lee
EXTERIOR LATH 2023-06-01 Failed James Lee
INTERIOR SHEAR 2023-06-14 Failed James Lee
INSULATION 2023-06-14 Passed James Lee
INTERIOR SHEAR 2023-06-16 Failed Rodney Weathers
SCRATCH COAT 2023-06-14 Failed James Lee
SHEETROCK 2023-06-16 Failed Rodney Weathers
ROUGH ELECTRICAL 2023-06-16 Failed Rodney Weathers
INSULATION 2023-06-16 Failed Rodney Weathers
SANITARY - VISUAL 2023-06-23 Passed cupsanitary
INTERIOR SHEAR 2023-06-30 Passed Rodney Weathers
ROUGH ELECTRICAL 2023-07-06 Passed James Lee
ROUGH ELECTRICAL 2023-06-30 Failed Rodney Weathers
UNDERFLOOR PLUMBING 2023-06-30 Failed Rodney Weathers
UNDERGROUND SEWER 2023-06-30 Failed Rodney Weathers
PROPERTY LINE CLEANOUT 2023-06-30 Failed Rodney Weathers
UNDERFLOOR ELECTRICAL 2023-06-30 Passed Rodney Weathers
SHEETROCK 2023-06-30 Passed Rodney Weathers
INSULATION 2023-06-30 Failed Rodney Weathers
ROUGH PLUMBING 2023-06-30 Failed Rodney Weathers
SCRATCH COAT 2023-06-30 Passed Rodney Weathers
ROOF NAIL 2023-07-10 Cancelled
UNDERGROUND SEWER 2023-07-11 Cancelled Rodney Weathers
PROPERTY LINE CLEANOUT 2023-07-06 Passed James Lee
UNDERGROUND SEWER 2023-07-06 Passed James Lee
UNDERFLOOR PLUMBING 2023-07-11 Passed Rodney Weathers
FINAL ELECTRICAL 2024-01-10 Rescheduled
FINAL MECHANICAL 2024-01-10 Rescheduled
FINAL PLUMBING 2024-01-10 Rescheduled
SANITARY - FINAL 2024-01-03 Passed cupsanitary
FINAL BUILDING 2024-01-10 Rescheduled
FINAL ELECTRICAL 2024-01-11 Cancelled James Lee
FINAL BUILDING 2024-01-11 Cancelled James Lee
FINAL MECHANICAL 2024-01-11 Cancelled James Lee
FINAL PLUMBING 2024-01-11 Cancelled James Lee
FINAL BUILDING 2024-01-17 Cancelled James Lee
FINAL ELECTRICAL 2024-01-17 Cancelled James Lee
FINAL MECHANICAL 2024-01-17 Cancelled James Lee
FINAL PLUMBING 2024-01-17 Cancelled James Lee
FINAL BUILDING 2024-03-26 Failed James Lee
FINAL ELECTRICAL 2024-03-19 Rescheduled James Lee
FINAL MECHANICAL 2024-03-26 Failed James Lee
FINAL PLUMBING 2024-03-26 Failed James Lee
FINAL ELECTRICAL 2024-03-26 Failed James Lee
FINAL BUILDING 2024-04-02 Failed James Lee
FURNACE 2024-04-11 Rescheduled
FURNACE 2024-04-04 Failed Danielle Carriedo
FINAL BUILDING 2024-04-30 Passed James Lee
FINAL ELECTRICAL 2024-04-30 Passed James Lee
FINAL MECHANICAL 2024-04-30 Passed James Lee
FINAL PLUMBING 2024-04-30 Passed James Lee
EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK
AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.