Loading...
22-029 SO #4 dated 8-6-24 Statcomm Butterfly Control Valve Replacement, 2nd floor, Stair 2 - PO 2025-107Contract/Purchasing Action Personnel Information Name Nathan Vasquez Department Public Works  Division Facilities Date 07.22.2024 Service Order Upload Quote Quote, Description of Project, Scope of Service, Schedule of Performance and Compensation Library - Butterfly control valve replacement quote.pdf Service Order Amount $2,807.46 Master Agreement Number 2024-038 Start Date 09/28/2023 End Date 10/30/2024 Firm Name Statcomm Inc.Address 939 San Rafael Ave c, Mountain View, CA 94043, USA Phone (650) 988-9508 Consultant/Contractor Name John LaCroix Consultant/Contractor Email jlacroix@statcomm.com Project Name SO 4 Butterfly Control Valve Replacement, 2nd floor, Stair 2 Project Location Cupertino Library Cupertino Project Manager Name Nathan Vasquez Cupertino Project Manager Email nathanv@cupertino.org Master Agreement Maximum Compensation $60,000.00 Total Previously Encumbered to Date $35,390.01 Encumbrance this Service Order $2,807.46 Master Agreement Unencumbered Balance $21,802.53 SO GL #100-87-828 700-702 Signature       08/05/2024 PDT  Consultant/Contractor Signature Date       08/06/2024 PDT  Manager/Supervisor Signature Date Appropriation Certification: I hereby certify that an unexpended appropriation is available in the above fund for the above contract as estimated and that fund are available as of this date of signature.       08/06/2024 PDT  Date: 08/05/2024 PDT Email: contracts@psintegrated.com Date: 08/06/2024 PDT Email: nathanv@cupertino.gov Date: 08/06/2024 PDT Email: jindyg@cupertino.org Management Analyst Signature Date GRAND TOTAL $2,807.46 Description of Work 6-24 Semi-annual NFPA 25 Corrections Sprinkler Department, Common Area Replace one (1) butterfly control valve. - Includes draining and filling of the building's fire sprinkler system. - Includes unwiring old control valve's tamper switch and wiring in new valve's tamper switch into fire alarm system. Services to be completed [Sprinkler] Sprinkler System Group - 2nd floor stair 2 Cupertino library 2nd floor, Stair 2, at riser: Flag on butterfly control valve does not move when turning to indicate open or closed - REPLACE CONTROL VALVE Terms and Conditions Fire Sprinkler Service This proposal covers the labor and material outlined in the attached proposal, based on customer provided information. Although every effort is made to provide a complete proposal, if additional equipment and labor (not specifically listed in the proposal) is needed, it will be invoiced on a time and material basis at our standard service rates. Exclusions: Pricing outlined in this proposal is based on the above scope of work and is subject to change if project/service scope is changed or costs for outsourced services change before this contract is executed. If access holes are required, any necessary patching, painting and repairs by others. Replacement or repair of existing fire sprinkler piping, unless specifically outlined in the proposal, will be billable at our standard service rates. Service, repair or replacement of non-listed materials. Patching, painting or repair of drywall. Repair or replacement of: o Exterior siding. o Ceiling tiles. o Concrete material. Fire sprinkler service repairs due to debris from city water line. From Statcomm Inc. 939 San Rafael Avenue C Mountain View CA 94043 (650) 988-9508 www.statcomm.com Performance Systems Integration is a leading provider of Fire & Life Safety services in the PNW. Quote No. 2035025 Type Inspection Repair Prepared By John LaCroix Created On 07/03/2024 Valid Until 08/30/2024 Quote For City of Cupertino CC - Cupertino Library 10800 Torre Ave Cupertino CA 95014 (408) 777-3111 Repair or replacement of additional equipment not listed in the BOM. Electrical work, repair or installation of electrical equipment. Work in areas containing lead and asbestos. Engineered drawings. Local jurisdiction testing fees, when applicable, will be billed separately. Permit Fees. Parking Fees. Sales tax. Fire watch fees (if applicable). Note: In applications where there is CPVC piping, the following applies: When replacing existing sprinkler heads, it is possible that the existing CPVC piping could be damaged due to its age and the original piping material used. This proposal does not include pricing to repair or replace the existing CPVC piping if applicable. Repair of damaged CPVC piping performed on a time and material basis at a negotiated rate with the end user. SO 4 Butterfly Control Valve Replacement, 2nd floor, Stair 2 - Service Request Created:08/01/2024 Status:Signed Transaction ID:ddaa267e-52cf-4e37-83aa-67aabac76380 "SO 4 Butterfly Control Valve Replacement, 2nd floor, Stair 2 - Service Request" history Jindy Gonzalez created the document. 08/01/2024 9:19:34 PM PDT - IP address 174.85.102.16 Document was emailed to John LaCroix 08/01/2024 9:19:35 PM PDT User John LaCroix delegated the document. 08/05/2024 10:01:01 AM PDT - IP address 70.59.142.136:63871 Document was emailed to Joshua D. Shenk 08/05/2024 10:01:02 AM PDT Joshua D. Shenk signed the document. 08/05/2024 10:12:38 AM PDT - IP address 73.73.31.37:50328 Document was emailed to nathanv@cupertino.gov 08/05/2024 10:12:39 AM PDT nathanv@cupertino.gov signed the document. 08/06/2024 7:56:10 AM PDT - IP address 64.165.34.3:1831 Document was emailed to Jindy Gonzalez 08/06/2024 7:56:11 AM PDT Jindy Gonzalez signed the document. 08/06/2024 8:11:00 AM PDT - IP address 174.85.102.16:52160 Document was successfully signed and filed 08/06/2024 8:11:01 AM PDT