Loading...
BLD-2021-2081InspectionRecordINSPECTION RECORD CITY HALL 10300 Torre Avenue • Cupertino, CA 95014-3255 PHONE 408-777-3228 WWW.CUPERTINO.ORG BUILDING ADDRESS: 7453 DE LA FARGE DR Cupertino APN: 359 26 015 PERMIT NO: BLD-2021-2081 OWNER'S NAME: TANG CHENG-CHUNG AND CHAO THERESA CHUNG TRU OWNER'S PHONE: (408)464-3406 CONTRACTOR: SHANE AND BROTHER LLC, PO BOX 2184 CUPERTINO CONTRACTOR PHONE: (408) 391-9824 DATE ISSUED 4/14/2024 7:38:25 PM ISSUED BY:VALUATION: $25000 JOB DESCRIPTION CONVERT (E) GARAGE TO ATTACHED ADU (513 SF) REV #1 - ADD FLOOR JOIST ABOVE SLAB-APPROVED 12/21/22 REV # 2 - REMOVE ALL WORK ON THE MAIN HOUSE AND ONLY MAINTAIN THE SCOPE OF THE GARAGE CONVERSION TO ADU - (513 SF); UPGRADE MAIN PANEL (200 AMP); REVISE TO DUCTED MINI-SPLIT AND UPDATE TITLE 24; REVISE ADU BATHROOM LAYOUT - APPROVED 1/22/2024 INSPECTION TYPE DATE STATUS INSPECTOR FOUNDATION 2022-11-16 Passed Rodney Weathers UNDERFLOOR FRAMING 2023-02-01 Passed Bob Sabich UNDERFLOOR PLUMBING 2023-02-01 Passed Bob Sabich ROUGH FRAME 2023-02-23 Cancelled   ROUGH FRAME 2023-02-16 Passed James Lee ROUGH ELECTRICAL 2023-02-16 Passed James Lee ROUGH PLUMBING 2023-02-16 Passed James Lee ROUGH MECHANICAL 2023-02-16 Passed James Lee ELECTRIC METER RELEASE 2023-02-23 Rescheduled   ELECTRIC METER RELEASE 2023-02-28 Cancelled   INSULATION 2023-02-27 Passed Bob Sabich SHEETROCK 2023-03-02 Passed Rodney Weathers SHOWER PAN 2023-04-10 Cancelled Antonio Torrez SHOWER PAN 2023-04-12 Passed Rodney Weathers INTERIOR LATH 2023-04-12 Passed Rodney Weathers EXTERIOR LATH 2023-05-04 Passed Rodney Weathers SCRATCH COAT 2023-05-08 Passed Bob Sabich FINAL BUILDING 2023-09-14 Failed Rodney Weathers SANITARY - VISUAL 2023-10-02 Passed cupsanitary PROPERTY LINE CLEANOUT 2023-10-11 Cancelled   PROPERTY LINE CLEANOUT 2023-10-11 Passed Rodney Weathers SANITARY - FINAL 2023-10-16 Passed cupsanitary FINAL BUILDING 2024-04-11 Passed Rodney Weathers EVERY PERMIT ISSUED SHALL BECOME INVALID UNLESS THE WORK ON THE SITE AUTHORIZED BY SUCH PERMIT IS COMMENCED WITHIN 12 MONTHS AFTER ITS ISSUANCE, OR IF THE WORK AUTHORIZED ON THE SITE BY SUCH PERMIT IS SUSPENDED OR ABANDONED FOR A PERIOD OF 12 MONTHS AFTER THE TIME THE WORK IS COMMENCED.